NYSDOT contract D265454 bid tabulation
N.Y. Route 77 Pavement Resurfacing. Let by New York State DOT on March 13, 2025, Genesee, Wyoming, Region 04. 9 bids received; low bid $4,188,170 by Keeler Construction Co Inc.
- Owner
- New York State DOT
- Letting
- 13 MAR 2025
- Pay items
- 41
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Keeler Construction Co Inc | $4,188,170 | Low |
| 2 | D&H Excavating Inc | $4,602,777 | +10% |
| 3 | Oakgrove Construction Inc | $4,789,588 | +14% |
| 4 | Amherst Paving Inc | $4,860,446 | +16% |
| 5 | McLaughlin Construction Corp/DBA Edbauer Construction | $4,981,933 | +19% |
| 6 | Concrete Applied Technologies Corp/DBA:Catco | $5,057,817 | +21% |
| 7 | Cold Spring Construction Company | $5,120,391 | +22% |
| 8 | Villager Construction Inc | $5,254,560 | +25% |
| 9 | Occhino Corp | $6,926,707 | +65% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Keeler Construction Co Inc | 2. D&H Excavating Inc | 3. Oakgrove Construction Inc | 4. Amherst Paving Inc | 5. McLaughlin Construction Corp/DBA Edbauer Construction | 6. Concrete Applied Technologies Corp/DBA:Catco |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Unclassified Excavation and Disposal (203.02) | CY | 150 | $23.00 | $37.00 | $40.00 | $62.00 | $45.00 | $31.00 |
| 2 | Embankment In Place (203.03) | CY | 100 | $34.00 | $52.00 | $75.00 | $88.00 | $35.00 | $31.00 |
| 3 | (203.24010017) | 5,000 | $5.00 | $5.00 | $25.00 | $32.50 | $0.10 | $45.00 | |
| 4 | Trench and Culvert Excavation (206.0201) | CY | 35 | $90.00 | $130.00 | $75.00 | $103.00 | $75.00 | $57.00 |
| 5 | (404.0001) | TON | 1,544 | $95.00 | $95.00 | $95.00 | $95.00 | $95.00 | $95.00 |
| 6 | (404.0189) | TON | 1,350 | $93.00 | $93.00 | $89.00 | $101.00 | $80.00 | $150.00 |
| 7 | (404.0972) | TON | 29,500 | $86.00 | $95.00 | $89.00 | $90.00 | $100.00 | $89.00 |
| 8 | (404.1989) | TON | 16 | $250.00 | $275.00 | $300.00 | $175.00 | $375.00 | $300.00 |
| 9 | Diluted Tack Coat (407.0102) | GAL | 33,000 | $0.50 | $4.30 | $4.00 | $4.00 | $4.55 | $4.00 |
| 10 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 108,000 | $0.25 | $0.50 | $0.40 | $0.35 | $0.10 | $0.30 |
| 11 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 358,000 | $0.51 | $0.90 | $0.85 | $1.01 | $0.93 | $1.40 |
| 12 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 3,100 | $11.00 | $15.00 | $7.00 | $11.00 | $14.00 | $9.00 |
| 13 | (604.070401) | EACH | 1 | $2,700.00 | $5,200.00 | $7,000.00 | $3,100.00 | $4,525.00 | $6,000.00 |
| 14 | Underdrain Filter, Type I (605.0901) | CY | 22 | $144.00 | $185.00 | $60.00 | $144.00 | $150.00 | $82.00 |
| 15 | (605.1601) | LF | 280 | $9.00 | $10.00 | $5.00 | $15.25 | $32.00 | $16.00 |
| 16 | Turf Establishment – Performance (610.1605) | SY | 400 | $14.00 | $24.00 | $13.00 | $43.00 | $0.01 | $40.00 |
| 17 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $182,000 | $100,000 | $338,000 | $170,202 | $243,619 | $206,252 |
| 18 | Type III Construction Barricades (619.04) | EACH | 22 | $100.00 | $30.00 | $100.00 | $100.00 | $150.00 | $97.00 |
| 19 | (619.0901) | LF | 176,600 | $0.27 | $0.20 | $0.20 | $0.50 | $0.23 | $0.23 |
| 20 | (619.111211) | WEEK | 4 | $800.00 | $600.00 | $1,000.00 | $1,700.00 | $2,300.00 | $1,300.00 |
| 21 | (627.50140008) | 500 | $3.00 | $6.00 | $2.50 | $7.50 | $9.50 | $5.00 | |
| 22 | Removal and Repair of Deteriorated Asphalt Pavement – Greater than 4 Square Yards and less than 20 Square Yards (633.1402) | SY | 2,000 | $53.00 | $61.00 | $55.00 | $63.00 | $52.00 | $35.00 |
| 23 | Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403) | SY | 500 | $44.00 | $68.00 | $45.00 | $69.00 | $70.00 | $25.00 |
| 24 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 8 | $1,200.00 | $1,900.00 | $2,000.00 | $2,250.00 | $2,200.00 | $2,200.00 |
| 25 | Office Technology and Supplies (637.34) | DOL | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 26 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 27 | (640.11020004) | 9,790 | $1.00 | $0.80 | $1.00 | $0.85 | $2.12 | $2.10 | |
| 28 | (640.12020004) | 19,250 | $1.00 | $0.80 | $1.00 | $0.85 | $2.12 | $2.10 | |
| 29 | White Paint Reflectorized Pavement Stripes – 20 mils (640.20) | LF | 270,440 | $0.33 | $0.22 | $0.20 | $0.25 | $0.19 | $0.20 |
| 30 | Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21) | LF | 130,000 | $0.33 | $0.22 | $0.20 | $0.22 | $0.19 | $0.20 |
| 31 | White Paint Reflectorized Pavement Symbols - 20 mils (640.23) | EACH | 27 | $100.00 | $200.00 | $200.00 | $207.00 | $120.00 | $120.00 |
| 32 | (646.01010002) | 288 | $30.00 | $45.00 | $55.00 | $32.00 | $31.00 | $63.00 | |
| 33 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 6 | $38.00 | $64.00 | $100.00 | $125.00 | $40.00 | $63.00 |
| 34 | Steel Post, 2.0 lb/ft (646.32) | EACH | 6 | $200.00 | $130.00 | $200.00 | $175.00 | $202.00 | $210.00 |
| 35 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 86,556 | $0.11 | $0.32 | $0.30 | $0.38 | $0.38 | $0.40 |
| 36 | Secondary Highway Audible Roadway Delineators (SHARDs) (649.21) | LF | 86,800 | $0.11 | $0.32 | $0.30 | $0.38 | $0.38 | $0.40 |
| 37 | Field Change Payment (FCP) (697.03) | DOL | 300,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 38 | Asphalt Price Adjustment (698.04) | DOL | 33,198 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 39 | Fuel Price Adjustment (698.05) | DOL | 3,170 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 40 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 41 | Mobilization (699.040001) | LS | 1 | $161,000 | $60,602 | $184,200 | $151,499 | $191,000 | $194,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 13, 2025. Compiled by Mirage Metrics.