NYSDOT contract D265576 bid tabulation
Small Culvert Replacements -NY Route 950A. Let by New York State DOT on October 23, 2025, Cattaraugus, Region 05. 6 bids received; low bid $1,167,443 by Legend Excavating LLC.
- Owner
- New York State DOT
- Letting
- 23 OCT 2025
- Pay items
- 87
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Legend Excavating LLC | $1,167,443 | Low |
| 2 | Union Concrete & Construction Corp | $1,558,342 | +33% |
| 3 | Lake Shore Paving Inc | $1,696,232 | +45% |
| 4 | McLaughlin Construction Corp/DBA Edbauer Construction | $1,788,911 | +53% |
| 5 | D&H Excavating Inc | $1,997,000 | +71% |
| 6 | Concrete Applied Technologies Corp/DBA:Catco | $2,094,072 | +79% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Legend Excavating LLC | 2. Union Concrete & Construction Corp | 3. Lake Shore Paving Inc | 4. McLaughlin Construction Corp/DBA Edbauer Construction | 5. D&H Excavating Inc | 6. Concrete Applied Technologies Corp/DBA:Catco |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $2,000.00 | $25,000 | $8,658.53 | $100,000 | $91,895 | $16,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 170 | $8.00 | $12.00 | $54.00 | $45.00 | $56.00 | $50.00 |
| 3 | Embankment In Place (203.03) | CY | 3,854 | $22.00 | $40.00 | $24.66 | $28.00 | $32.00 | $34.00 |
| 4 | Select Granular Fill (203.07) | CY | 564 | $68.00 | $75.00 | $95.78 | $100.00 | $90.00 | $90.00 |
| 5 | (203.24010017) | 11 | $72.00 | $87.00 | $264.72 | $75.00 | $200.00 | $200.00 | |
| 6 | Controlled Low Strength Material (CLSM) (204.01) | CY | 6 | $170.00 | $385.00 | $687.50 | $840.00 | $560.00 | $650.00 |
| 7 | Structure Excavation (206.01) | CY | 4,700 | $14.00 | $21.50 | $10.40 | $30.00 | $30.00 | $30.00 |
| 8 | Trench and Culvert Excavation (206.0201) | CY | 540 | $10.00 | $36.00 | $50.00 | $48.00 | $95.00 | $68.00 |
| 9 | Geotextile Bedding (207.20) | SY | 64 | $8.00 | $10.00 | $10.60 | $15.00 | $13.00 | $18.00 |
| 10 | Prefabricated Composite Structural Drain (207.26) | SY | 30 | $8.00 | $13.00 | $52.75 | $25.00 | $35.00 | $20.00 |
| 11 | Seed and Mulch – Temporary (209.1003) | SY | 1,153 | $1.50 | $0.75 | $2.30 | $0.01 | $0.50 | $2.75 |
| 12 | Rolled Erosion Control Product, Class II Type B, Intermediate (209.190201) | SY | 894 | $4.00 | $2.50 | $7.76 | $4.00 | $1.00 | $2.40 |
| 13 | (209.23010009) | 1,384 | $6.00 | $6.00 | $8.65 | $1.50 | $1.00 | $7.00 | |
| 14 | (304.15200005) | 550 | $70.00 | $110.00 | $89.56 | $90.00 | $125.00 | $94.00 | |
| 15 | (404.0001) | TON | 35 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 16 | (404.0982) | TON | 260 | $105.00 | $215.00 | $215.50 | $286.00 | $240.00 | $200.00 |
| 17 | (404.1989) | TON | 125 | $105.00 | $210.00 | $222.85 | $278.00 | $300.00 | $250.00 |
| 18 | (404.3789) | TON | 300 | $105.00 | $202.00 | $190.60 | $190.00 | $200.00 | $175.00 |
| 19 | (404.4489) | TON | 200 | $105.00 | $175.00 | $177.15 | $110.00 | $0.01 | $200.00 |
| 20 | Diluted Tack Coat (407.0102) | GAL | 456 | $7.00 | $13.00 | $13.45 | $10.00 | $25.00 | $8.00 |
| 21 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 2,300 | $2.00 | $10.00 | $11.00 | $12.00 | $7.50 | $11.00 |
| 22 | (553.030001) | EACH | 1 | $5,000.00 | $2,600.00 | $4,495.00 | $100.00 | $18,000 | $100.00 |
| 23 | (553.030002) | EACH | 1 | $5,000.00 | $12,000 | $8,100.00 | $100.00 | $26,000 | $100.00 |
| 24 | (553.030003) | EACH | 1 | $5,000.00 | $12,000 | $8,100.00 | $100.00 | $33,000 | $100.00 |
| 25 | (595.50000018) | 1,600 | $4.00 | $6.50 | $3.50 | $7.00 | $5.50 | $4.00 | |
| 26 | (603.171814) | EACH | 2 | $600.00 | $835.00 | $3,100.00 | $8,981.00 | $2,100.00 | $1,400.00 |
| 27 | (603.172312) | EACH | 2 | $4,500.00 | $5,200.00 | $6,064.50 | $10,180 | $6,900.00 | $6,300.00 |
| 28 | (603.64050515) | 84 | $1,900.00 | $1,450.00 | $1,340.00 | $1,750.00 | $1,800.00 | $1,375.00 | |
| 29 | (603.67000001) | 29 | $2,500.00 | $2,650.00 | $2,987.00 | $2,417.00 | $7,600.00 | $2,400.00 | |
| 30 | (603.9830) | LF | 53 | $55.00 | $55.00 | $53.95 | $280.00 | $330.00 | $260.00 |
| 31 | (603.9860) | LF | 117 | $145.00 | $155.00 | $165.90 | $300.00 | $380.00 | $425.00 |
| 32 | Box Beam Guide Railing (606.10) | LF | 1,450 | $45.00 | $45.50 | $47.15 | $55.00 | $51.00 | $44.75 |
| 33 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 260 | $50.00 | $52.00 | $54.00 | $56.00 | $57.00 | $49.70 |
| 34 | Box Beam Guide Railing (Shop Mitered) (606.100003) | LF | 50 | $62.00 | $117.50 | $126.45 | $70.00 | $69.00 | $60.55 |
| 35 | Box Beam End Piece (606.120101) | EACH | 4 | $575.00 | $806.00 | $850.60 | $632.00 | $650.00 | $570.00 |
| 36 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 1 | $4,200.00 | $4,000.00 | $4,137.90 | $4,604.00 | $4,700.00 | $4,150.00 |
| 37 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 2 | $2,200.00 | $1,975.00 | $2,068.95 | $2,414.00 | $2,500.00 | $2,180.00 |
| 38 | Box Beam End Assembly Type III (606.1203) | EACH | 1 | $6,900.00 | $5,500.00 | $5,862.00 | $7,627.00 | $8,000.00 | $6,900.00 |
| 39 | Weak-Post, Corrugated Beam Guide Rail (606.18) | LF | 63 | $60.00 | $23.50 | $23.00 | $65.00 | $70.00 | $59.00 |
| 40 | Removing and Disposing Cable Guide Railing (606.70) | LF | 600 | $2.00 | $3.75 | $11.70 | $3.00 | $10.00 | $3.80 |
| 41 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 1,250 | $2.00 | $3.00 | $14.50 | $1.50 | $9.00 | $3.80 |
| 42 | Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79) | EACH | 4 | $30.00 | $200.00 | $1,361.50 | $50.00 | $450.00 | $2,020.00 |
| 43 | Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910) | EACH | 4 | $30.00 | $150.00 | $1,361.50 | $50.00 | $500.00 | $2,020.00 |
| 44 | (607.41010010) | 130 | $3.00 | $5.00 | $4.75 | $1.00 | $2.00 | $9.00 | |
| 45 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 5 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 46 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 90 | $105.00 | $250.00 | $309.50 | $275.00 | $280.00 | $275.00 |
| 47 | Moisture Retention Additive (610.08) | LB | 4 | $30.00 | $170.00 | $23.00 | $55.00 | $85.00 | $71.00 |
| 48 | Compost (610.10) | CY | 5 | $15.00 | $170.00 | $149.50 | $83.00 | $215.00 | $188.00 |
| 49 | Topsoil - Roadside (610.1402) | CY | 254 | $35.00 | $45.00 | $136.00 | $70.00 | $50.00 | $85.00 |
| 50 | Turf Establishment - Roadside (610.1601) | SY | 725 | $2.00 | $2.15 | $4.70 | $1.00 | $3.00 | $4.80 |
| 51 | (610.16051024) | 1,580 | $2.00 | $2.50 | $4.70 | $2.00 | $2.00 | $3.75 | |
| 52 | Watering Vegetation (610.19) | 1,000 GALLONS | 28 | $50.00 | $12.00 | $115.00 | $20.00 | $1.00 | $40.00 |
| 53 | (611.0452) | EACH | 30 | $250.00 | $171.00 | $400.00 | $359.00 | $200.00 | $175.00 |
| 54 | (613.04000001) | 38 | $8.00 | $52.00 | $80.00 | $37.00 | $425.00 | $240.00 | |
| 55 | (614.060204) | EACH | 11 | $200.00 | $120.00 | $1,150.00 | $370.00 | $400.00 | $730.00 |
| 56 | (614.060304) | EACH | 3 | $500.00 | $240.00 | $1,480.00 | $1,280.00 | $1,200.00 | $2,100.00 |
| 57 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $45,000 | $92,500 | $157,500 | $137,356 | $97,000 | $495,500 |
| 58 | Type III Construction Barricades (619.04) | EACH | 50 | $75.00 | $200.00 | $234.25 | $125.00 | $45.00 | $130.00 |
| 59 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 1,075 | $2.00 | $3.50 | $7.90 | $1.50 | $0.01 | $0.50 |
| 60 | (619.0903) | LF | 1,016 | $2.00 | $2.75 | $7.90 | $1.50 | $0.01 | $0.50 |
| 61 | (619.100101) | LF | 2,000 | $2.00 | $1.00 | $1.75 | $1.70 | $0.01 | $1.30 |
| 62 | (619.110513) | EACH | 12 | $1,200.00 | $3,400.00 | $3,356.00 | $5,000.00 | $2,000.00 | $500.00 |
| 63 | (619.130101) | EACH | 1 | $20,000 | $5,300.00 | $9,790.00 | $2,500.00 | $0.01 | $30,000 |
| 64 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 100 | $50.00 | $37.00 | $57.60 | $40.00 | $250.00 | $36.00 |
| 65 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 1,000 | $50.00 | $34.00 | $57.20 | $32.00 | $0.01 | $50.00 |
| 66 | Mailboxes (619.27) | EACH | 1 | $300.00 | $275.00 | $230.00 | $250.00 | $575.00 | $550.00 |
| 67 | Stone Filling (Light) (620.03) | CY | 11 | $125.00 | $130.00 | $283.60 | $152.00 | $250.00 | $200.00 |
| 68 | Stone Filling (Medium) (620.04) | CY | 78 | $180.00 | $190.00 | $228.00 | $220.00 | $200.00 | $270.00 |
| 69 | Stone Filling (Heavy) (620.05) | CY | 67 | $190.00 | $190.00 | $286.00 | $210.00 | $210.00 | $240.00 |
| 70 | (620.06010002) | 18 | $200.00 | $190.00 | $425.00 | $270.00 | $325.00 | $500.00 | |
| 71 | Bedding Material, Type 1 (620.0801) | CY | 39 | $90.00 | $85.00 | $149.00 | $120.00 | $98.00 | $240.00 |
| 72 | (620.14010009) | 5 | $275.00 | $320.00 | $186.65 | $508.00 | $900.00 | $700.00 | |
| 73 | Crushed Gravel (In-Place Measure) (623.11) | CY | 18 | $68.00 | $115.00 | $234.50 | $200.00 | $230.00 | $180.00 |
| 74 | Survey Operations (625.01) | LS | 1 | $8,000.00 | $24,000 | $21,549 | $22,000 | $55,000 | $30,000 |
| 75 | (627.50140008) | 178 | $5.00 | $10.50 | $6.70 | $10.00 | $15.00 | $15.00 | |
| 76 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $1,000.00 | $1,450.00 | $1,000.00 | $250.00 | $1,500.00 | $100.00 |
| 77 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 12 | $400.00 | $1,600.00 | $2,585.00 | $1,200.00 | $2,200.00 | $2,000.00 |
| 78 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 79 | White Paint Reflectorized Pavement Stripes – 20 mils (640.20) | LF | 2,760 | $3.00 | $2.80 | $7.72 | $1.70 | $2.00 | $1.50 |
| 80 | Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21) | LF | 1,840 | $3.00 | $2.40 | $7.72 | $1.70 | $2.00 | $1.50 |
| 81 | (688.02010006) | 500 | $8.00 | $6.00 | $13.60 | $2.50 | $0.01 | $2.00 | |
| 82 | Field Change Payment (FCP) (697.03) | DOL | 64,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 83 | Asphalt Price Adjustment (698.04) | DOL | 616 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 84 | Fuel Price Adjustment (698.05) | DOL | 582 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 85 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 86 | (698.93940015) | LS | 1 | $75,000 | $75,000 | $75,000 | $75,000 | $75,000 | $75,000 |
| 87 | Mobilization (699.040001) | LS | 1 | $25,689 | $59,700 | $42,500 | $67,000 | $72,000 | $77,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of October 23, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.