NYSDOT contract D265576 bid tabulation

Small Culvert Replacements -NY Route 950A. Let by New York State DOT on October 23, 2025, Cattaraugus, Region 05. 6 bids received; low bid $1,167,443 by Legend Excavating LLC.

Owner
New York State DOT
Letting
23 OCT 2025
Pay items
87
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Legend Excavating LLC$1,167,443Low
2Union Concrete & Construction Corp$1,558,342+33%
3Lake Shore Paving Inc$1,696,232+45%
4McLaughlin Construction Corp/DBA Edbauer Construction$1,788,911+53%
5D&H Excavating Inc$1,997,000+71%
6Concrete Applied Technologies Corp/DBA:Catco$2,094,072+79%
NYSDOT contract D265576: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Legend Excavating LLC2. Union Concrete & Construction Corp3. Lake Shore Paving Inc4. McLaughlin Construction Corp/DBA Edbauer Construction5. D&H Excavating Inc6. Concrete Applied Technologies Corp/DBA:Catco
1Clearing and Grubbing (201.06)LS1$2,000.00$25,000$8,658.53$100,000$91,895$16,000
2Unclassified Excavation and Disposal (203.02)CY170$8.00$12.00$54.00$45.00$56.00$50.00
3Embankment In Place (203.03)CY3,854$22.00$40.00$24.66$28.00$32.00$34.00
4Select Granular Fill (203.07)CY564$68.00$75.00$95.78$100.00$90.00$90.00
5 (203.24010017)11$72.00$87.00$264.72$75.00$200.00$200.00
6Controlled Low Strength Material (CLSM) (204.01)CY6$170.00$385.00$687.50$840.00$560.00$650.00
7Structure Excavation (206.01)CY4,700$14.00$21.50$10.40$30.00$30.00$30.00
8Trench and Culvert Excavation (206.0201)CY540$10.00$36.00$50.00$48.00$95.00$68.00
9Geotextile Bedding (207.20)SY64$8.00$10.00$10.60$15.00$13.00$18.00
10Prefabricated Composite Structural Drain (207.26)SY30$8.00$13.00$52.75$25.00$35.00$20.00
11Seed and Mulch – Temporary (209.1003)SY1,153$1.50$0.75$2.30$0.01$0.50$2.75
12Rolled Erosion Control Product, Class II Type B, Intermediate (209.190201)SY894$4.00$2.50$7.76$4.00$1.00$2.40
13 (209.23010009)1,384$6.00$6.00$8.65$1.50$1.00$7.00
14 (304.15200005)550$70.00$110.00$89.56$90.00$125.00$94.00
15 (404.0001)TON35$100.00$100.00$100.00$100.00$100.00$100.00
16 (404.0982)TON260$105.00$215.00$215.50$286.00$240.00$200.00
17 (404.1989)TON125$105.00$210.00$222.85$278.00$300.00$250.00
18 (404.3789)TON300$105.00$202.00$190.60$190.00$200.00$175.00
19 (404.4489)TON200$105.00$175.00$177.15$110.00$0.01$200.00
20Diluted Tack Coat (407.0102)GAL456$7.00$13.00$13.45$10.00$25.00$8.00
21Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY2,300$2.00$10.00$11.00$12.00$7.50$11.00
22 (553.030001)EACH1$5,000.00$2,600.00$4,495.00$100.00$18,000$100.00
23 (553.030002)EACH1$5,000.00$12,000$8,100.00$100.00$26,000$100.00
24 (553.030003)EACH1$5,000.00$12,000$8,100.00$100.00$33,000$100.00
25 (595.50000018)1,600$4.00$6.50$3.50$7.00$5.50$4.00
26 (603.171814)EACH2$600.00$835.00$3,100.00$8,981.00$2,100.00$1,400.00
27 (603.172312)EACH2$4,500.00$5,200.00$6,064.50$10,180$6,900.00$6,300.00
28 (603.64050515)84$1,900.00$1,450.00$1,340.00$1,750.00$1,800.00$1,375.00
29 (603.67000001)29$2,500.00$2,650.00$2,987.00$2,417.00$7,600.00$2,400.00
30 (603.9830)LF53$55.00$55.00$53.95$280.00$330.00$260.00
31 (603.9860)LF117$145.00$155.00$165.90$300.00$380.00$425.00
32Box Beam Guide Railing (606.10)LF1,450$45.00$45.50$47.15$55.00$51.00$44.75
33Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002)LF260$50.00$52.00$54.00$56.00$57.00$49.70
34Box Beam Guide Railing (Shop Mitered) (606.100003)LF50$62.00$117.50$126.45$70.00$69.00$60.55
35Box Beam End Piece (606.120101)EACH4$575.00$806.00$850.60$632.00$650.00$570.00
36Box Beam Guide Railing End Assembly Type I (606.120102)EACH1$4,200.00$4,000.00$4,137.90$4,604.00$4,700.00$4,150.00
37Box Beam Guide Railing End Assembly Type IIA (606.120201)EACH2$2,200.00$1,975.00$2,068.95$2,414.00$2,500.00$2,180.00
38Box Beam End Assembly Type III (606.1203)EACH1$6,900.00$5,500.00$5,862.00$7,627.00$8,000.00$6,900.00
39Weak-Post, Corrugated Beam Guide Rail (606.18)LF63$60.00$23.50$23.00$65.00$70.00$59.00
40Removing and Disposing Cable Guide Railing (606.70)LF600$2.00$3.75$11.70$3.00$10.00$3.80
41Removing and Disposing Corrugated Beam Guide Railing (606.71)LF1,250$2.00$3.00$14.50$1.50$9.00$3.80
42Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79)EACH4$30.00$200.00$1,361.50$50.00$450.00$2,020.00
43Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910)EACH4$30.00$150.00$1,361.50$50.00$500.00$2,020.00
44 (607.41010010)130$3.00$5.00$4.75$1.00$2.00$9.00
45Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013)QUALITY UNIT5$100.00$100.00$100.00$100.00$100.00$100.00
46Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON90$105.00$250.00$309.50$275.00$280.00$275.00
47Moisture Retention Additive (610.08)LB4$30.00$170.00$23.00$55.00$85.00$71.00
48Compost (610.10)CY5$15.00$170.00$149.50$83.00$215.00$188.00
49Topsoil - Roadside (610.1402)CY254$35.00$45.00$136.00$70.00$50.00$85.00
50Turf Establishment - Roadside (610.1601)SY725$2.00$2.15$4.70$1.00$3.00$4.80
51 (610.16051024)1,580$2.00$2.50$4.70$2.00$2.00$3.75
52Watering Vegetation (610.19)1,000 GALLONS28$50.00$12.00$115.00$20.00$1.00$40.00
53 (611.0452)EACH30$250.00$171.00$400.00$359.00$200.00$175.00
54 (613.04000001)38$8.00$52.00$80.00$37.00$425.00$240.00
55 (614.060204)EACH11$200.00$120.00$1,150.00$370.00$400.00$730.00
56 (614.060304)EACH3$500.00$240.00$1,480.00$1,280.00$1,200.00$2,100.00
57Basic Work Zone Traffic Control (619.01)LS1$45,000$92,500$157,500$137,356$97,000$495,500
58Type III Construction Barricades (619.04)EACH50$75.00$200.00$234.25$125.00$45.00$130.00
59Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803)LF1,075$2.00$3.50$7.90$1.50$0.01$0.50
60 (619.0903)LF1,016$2.00$2.75$7.90$1.50$0.01$0.50
61 (619.100101)LF2,000$2.00$1.00$1.75$1.70$0.01$1.30
62 (619.110513)EACH12$1,200.00$3,400.00$3,356.00$5,000.00$2,000.00$500.00
63 (619.130101)EACH1$20,000$5,300.00$9,790.00$2,500.00$0.01$30,000
64Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711)LF100$50.00$37.00$57.60$40.00$250.00$36.00
65Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716)LF1,000$50.00$34.00$57.20$32.00$0.01$50.00
66Mailboxes (619.27)EACH1$300.00$275.00$230.00$250.00$575.00$550.00
67Stone Filling (Light) (620.03)CY11$125.00$130.00$283.60$152.00$250.00$200.00
68Stone Filling (Medium) (620.04)CY78$180.00$190.00$228.00$220.00$200.00$270.00
69Stone Filling (Heavy) (620.05)CY67$190.00$190.00$286.00$210.00$210.00$240.00
70 (620.06010002)18$200.00$190.00$425.00$270.00$325.00$500.00
71Bedding Material, Type 1 (620.0801)CY39$90.00$85.00$149.00$120.00$98.00$240.00
72 (620.14010009)5$275.00$320.00$186.65$508.00$900.00$700.00
73Crushed Gravel (In-Place Measure) (623.11)CY18$68.00$115.00$234.50$200.00$230.00$180.00
74Survey Operations (625.01)LS1$8,000.00$24,000$21,549$22,000$55,000$30,000
75 (627.50140008)178$5.00$10.50$6.70$10.00$15.00$15.00
76Concrete Cylinder Curing Equipment (637.04)EACH1$1,000.00$1,450.00$1,000.00$250.00$1,500.00$100.00
77Engineer’s Field Office – Type 2 (637.12)MONTH12$400.00$1,600.00$2,585.00$1,200.00$2,200.00$2,000.00
78Office Technology and Supplies (637.34)DOL500$1.00$1.00$1.00$1.00$1.00$1.00
79White Paint Reflectorized Pavement Stripes – 20 mils (640.20)LF2,760$3.00$2.80$7.72$1.70$2.00$1.50
80Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21)LF1,840$3.00$2.40$7.72$1.70$2.00$1.50
81 (688.02010006)500$8.00$6.00$13.60$2.50$0.01$2.00
82Field Change Payment (FCP) (697.03)DOL64,000$1.00$1.00$1.00$1.00$1.00$1.00
83Asphalt Price Adjustment (698.04)DOL616$1.00$1.00$1.00$1.00$1.00$1.00
84Fuel Price Adjustment (698.05)DOL582$1.00$1.00$1.00$1.00$1.00$1.00
85Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
86 (698.93940015)LS1$75,000$75,000$75,000$75,000$75,000$75,000
87Mobilization (699.040001)LS1$25,689$59,700$42,500$67,000$72,000$77,000
NYSDOT contract D265576: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of October 23, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy