NYSDOT contract D265505 bid tabulation
HIGHWAY RECONSTRUCTION - US 219 & Miller Rd Site Number: 01 Days Road User Cost Per Time Unit: $ 10000. Let by New York State DOT on July 10, 2025, Cattaraugus, Region 05. 5 bids received; low bid $5,116,456 by Union Concrete & Construction Corp.
- Owner
- New York State DOT
- Letting
- 10 JUL 2025
- Pay items
- 140
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Union Concrete & Construction Corp | $5,116,456 | Low |
| 2 | McLaughlin Construction Corp/DBA Edbauer Construction | $5,937,785 | +16% |
| 3 | Cold Spring Construction Company | $6,178,794 | +21% |
| 4 | D&H Excavating Inc | $6,223,237 | +22% |
| 5 | Concrete Applied Technologies Corp/DBA:Catco | $7,222,874 | +41% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Union Concrete & Construction Corp | 2. McLaughlin Construction Corp/DBA Edbauer Construction | 3. Cold Spring Construction Company | 4. D&H Excavating Inc | 5. Concrete Applied Technologies Corp/DBA:Catco |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $66,500 | $120,000 | $30,000 | $194,000 | $10,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 19,346 | $12.00 | $20.00 | $20.00 | $22.50 | $35.00 |
| 3 | Embankment In Place (203.03) | CY | 13,890 | $10.60 | $14.00 | $14.00 | $25.00 | $35.00 |
| 4 | Select Granular Fill (203.07) | CY | 219 | $86.00 | $65.00 | $40.00 | $80.00 | $85.00 |
| 5 | Trench and Culvert Excavation (206.0201) | CY | 2,039 | $31.50 | $24.00 | $0.01 | $28.00 | $60.00 |
| 6 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 239 | $100.00 | $23.00 | $46.00 | $230.00 | $150.00 |
| 7 | (206.03050005) | 90 | $75.00 | $60.00 | $45.00 | $65.00 | $150.00 | |
| 8 | (206.03060005) | 1,895 | $23.00 | $20.00 | $12.00 | $22.00 | $65.00 | |
| 9 | Geotextile Separation (207.21) | SY | 260 | $4.00 | $3.00 | $2.25 | $6.50 | $6.00 |
| 10 | Geotextile Drainage (207.22) | SY | 1,786 | $2.90 | $2.00 | $1.65 | $7.00 | $5.50 |
| 11 | (208.01030022) | 223 | $91.00 | $135.00 | $140.00 | $100.00 | $170.00 | |
| 12 | Mulch – Temporary (209.100101) | SY | 1,273 | $2.00 | $3.00 | $3.05 | $1.75 | $5.00 |
| 13 | Seed – Temporary (209.100102) | SY | 1,273 | $1.00 | $3.50 | $3.05 | $1.75 | $1.00 |
| 14 | Check Dam, Prefabricated – Temporary (209.1105) | LF | 72 | $21.00 | $24.00 | $25.00 | $30.00 | $80.00 |
| 15 | Silt Fence - Temporary (209.13) | LF | 7,460 | $1.55 | $2.00 | $3.50 | $5.25 | $6.00 |
| 16 | Drainage Structure Inlet Protection, Silt Fence – Temporary (209.1701) | LF | 12 | $31.00 | $10.00 | $15.00 | $8.50 | $50.00 |
| 17 | Rolled Erosion Control Product, Class II Type A, Intermediate (209.1901) | SY | 1,036 | $2.75 | $5.10 | $10.00 | $5.50 | $9.00 |
| 18 | Soil Stabilizers, Class IV Type A (209.2101) | SY | 3,420 | $1.85 | $2.50 | $2.50 | $2.75 | $3.00 |
| 19 | Stabilized Construction Access (209.22) | SY | 223 | $20.00 | $10.00 | $25.00 | $1.00 | $50.00 |
| 20 | (304.15200005) | 8,138 | $67.50 | $72.00 | $95.00 | $64.00 | $85.00 | |
| 21 | (404.0001) | TON | 532 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 22 | (404.0982) | TON | 1,700 | $129.00 | $130.00 | $125.00 | $123.00 | $145.00 |
| 23 | (404.1989) | TON | 3,314 | $110.00 | $128.00 | $100.00 | $103.00 | $135.00 |
| 24 | (404.2589) | TON | 4,941 | $104.00 | $114.00 | $95.00 | $95.00 | $125.00 |
| 25 | (404.4189) | TON | 297 | $106.00 | $164.00 | $110.00 | $95.00 | $180.00 |
| 26 | (404.4489) | TON | 388 | $104.00 | $130.00 | $100.00 | $80.00 | $165.00 |
| 27 | Diluted Tack Coat (407.0102) | GAL | 3,052 | $7.00 | $12.00 | $9.00 | $9.50 | $6.00 |
| 28 | (412.10010010) | 35 | $50.00 | $92.00 | $41.00 | $22.00 | $515.00 | |
| 29 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 19,399 | $0.25 | $0.25 | $0.90 | $0.60 | $1.00 |
| 30 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 4,088 | $5.00 | $10.00 | $5.50 | $8.00 | $15.00 |
| 31 | (502.11110018) | 242 | $922.00 | $693.00 | $770.00 | $1,040.00 | $920.00 | |
| 32 | (502.12110018) | 132 | $1,040.00 | $956.00 | $1,050.00 | $1,600.00 | $1,450.00 | |
| 33 | (502.9101) | 1,385 | $13.00 | $44.00 | $42.00 | $60.00 | $56.00 | |
| 34 | (502.9111) | 802 | $13.00 | $38.00 | $37.00 | $62.00 | $56.00 | |
| 35 | Sealing Transverse Joints-Preformed Elastic Joint Sealer (502.9201) | LF | 1,385 | $18.50 | $18.00 | $30.00 | $0.01 | $18.00 |
| 36 | Sealing Longitudinal Joints -Preformed Elastic Joint Sealer (502.9301) | LF | 802 | $18.10 | $21.00 | $33.00 | $0.01 | $18.00 |
| 37 | (601.01110001) | 1,088 | $40.00 | $48.00 | $25.00 | $79.00 | $75.00 | |
| 38 | (603.14352404) | 1 | $3,000.00 | $3,770.00 | $6,000.00 | $4,300.00 | $3,300.00 | |
| 39 | (603.171216) | EACH | 1 | $260.00 | $834.00 | $775.00 | $525.00 | $1,400.00 |
| 40 | (603.541216) | EACH | 3 | $650.00 | $1,210.00 | $750.00 | $925.00 | $1,400.00 |
| 41 | (603.6602) | LF | 6 | $875.00 | $628.00 | $500.00 | $1,200.00 | $800.00 |
| 42 | (603.98100602) | 1,476 | $5.55 | $17.00 | $8.00 | $11.50 | $12.00 | |
| 43 | (603.9815) | LF | 540 | $14.65 | $48.00 | $90.00 | $54.00 | $30.00 |
| 44 | (604.301990) | LF | 11 | $455.00 | $773.00 | $1,200.00 | $660.00 | $500.00 |
| 45 | (604.500501) | LF | 9 | $375.00 | $535.00 | $1,200.00 | $58.00 | $600.00 |
| 46 | Underdrain Filter, Type II (605.1001) | CY | 722 | $66.00 | $55.00 | $125.00 | $92.00 | $70.00 |
| 47 | (605.1701) | LF | 8,180 | $1.60 | $8.50 | $11.00 | $10.00 | $6.50 |
| 48 | Box Beam Guide Railing (606.10) | LF | 2,034 | $50.00 | $53.00 | $49.00 | $44.00 | $51.00 |
| 49 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 367 | $52.50 | $54.00 | $51.00 | $51.00 | $55.00 |
| 50 | Box Beam Guide Railing With Extra Long Posts (606.1001) | LF | 417 | $52.50 | $55.00 | $51.00 | $48.00 | $55.00 |
| 51 | Box Beam Guide Railing with Extra Long Posts (Shop Bent or Shop Mitered) (606.100102) | LF | 270 | $57.00 | $58.00 | $56.00 | $58.00 | $60.00 |
| 52 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 2 | $4,100.00 | $4,245.00 | $4,100.00 | $4,050.00 | $4,400.00 |
| 53 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 4 | $2,000.00 | $2,034.00 | $2,000.00 | $2,000.00 | $2,100.00 |
| 54 | Removing and Storing Box Beam Guide Railing (606.63) | LF | 2,473 | $5.00 | $5.50 | $9.00 | $5.50 | $5.50 |
| 55 | Removing and Storing Box Beam Guide Railing End Assembly (606.6920) | EACH | 7 | $31.25 | $344.00 | $275.00 | $210.00 | $200.00 |
| 56 | (607.41010010) | 682 | $9.00 | $1.50 | $6.00 | $11.00 | $4.00 | |
| 57 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 175 | $216.00 | $284.00 | $275.00 | $265.00 | $250.00 |
| 58 | (609.0401) | LF | 1,465 | $58.00 | $65.00 | $80.00 | $90.00 | $65.00 |
| 59 | (609.0407) | LF | 346 | $66.00 | $89.00 | $118.00 | $117.00 | $90.00 |
| 60 | Topsoil – Reuse On-Site Materials (610.1401) | CY | 423 | $12.50 | $50.00 | $50.00 | $85.00 | $55.00 |
| 61 | Topsoil - Roadside (610.1402) | CY | 1,269 | $46.25 | $82.00 | $85.00 | $1.00 | $95.00 |
| 62 | Turf Establishment - Roadside (610.1601) | SY | 3,553 | $0.90 | $0.01 | $1.50 | $3.00 | $2.00 |
| 63 | (614.060104) | EACH | 4 | $125.00 | $470.00 | $1,000.00 | $310.00 | $660.00 |
| 64 | (614.060204) | EACH | 2 | $625.00 | $600.00 | $1,500.00 | $620.00 | $800.00 |
| 65 | (614.060404) | EACH | 3 | $1,565.00 | $4,400.00 | $2,000.00 | $1,600.00 | $1,600.00 |
| 66 | (617.01010024) | 1,125 | $1.00 | $2.00 | $3.00 | $0.01 | $4.00 | |
| 67 | (617.10000024) | 188 | $15.00 | $25.00 | $68.00 | $10.00 | $130.00 | |
| 68 | (617.11000024) | LS | 1 | $500.00 | $150.00 | $400.00 | $300.00 | $2,500.00 |
| 69 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $190,000 | $211,367 | $444,000 | $118,000 | $262,000 |
| 70 | Type III Construction Barricades (619.04) | EACH | 77 | $90.00 | $150.00 | $125.00 | $48.00 | $150.00 |
| 71 | (619.100101) | LF | 3,840 | $0.55 | $0.55 | $0.50 | $0.60 | $1.20 |
| 72 | (619.100104) | LF | 226 | $2.70 | $13.00 | $12.00 | $15.00 | $20.00 |
| 73 | (619.100201) | EACH | 2 | $165.00 | $170.00 | $160.00 | $175.00 | $170.00 |
| 74 | (619.111113) | EACH | 6 | $6,375.00 | $8,500.00 | $10,000 | $5,200.00 | $8,400.00 |
| 75 | (619.130101) | EACH | 1 | $62,000 | $72,000 | $30,000 | $110,000 | $20,000 |
| 76 | Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611) | MONTH | 50 | $297.00 | $10.00 | $400.00 | $230.00 | $50.00 |
| 77 | (619.17060005) | 578 | $2.00 | $2.00 | $0.01 | $5.50 | $7.00 | |
| 78 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 140 | $34.00 | $45.00 | $26.00 | $105.00 | $50.00 |
| 79 | Temporary Positive Barrier – Category 2 (Pinning Permitted) (619.1712) | LF | 1,570 | $18.00 | $32.00 | $26.00 | $54.00 | $45.00 |
| 80 | Pavement Patching (Tonnage) (619.2602) | TON | 5 | $688.00 | $750.00 | $800.00 | $1,200.00 | $300.00 |
| 81 | Stone Filling (Light) (620.03) | CY | 26 | $343.00 | $375.00 | $300.00 | $250.00 | $250.00 |
| 82 | Survey Operations (625.01) | LS | 1 | $30,000 | $104,000 | $135,000 | $91,237 | $60,000 |
| 83 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 6 | $300.00 | $320.00 | $200.00 | $300.00 | $650.00 |
| 84 | Permanent Survey Markers (625.06) | EACH | 2 | $910.00 | $1,200.00 | $1,500.00 | $1,300.00 | $2,000.00 |
| 85 | (625.09010015) | LS | 1 | $950.00 | $0.01 | $9,000.00 | $5,500.00 | $100.00 |
| 86 | (627.50140008) | 2,046 | $1.50 | $8.00 | $5.00 | $6.50 | $6.00 | |
| 87 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $1,565.00 | $750.00 | $300.00 | $2,000.00 | $4,000.00 |
| 88 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 18 | $2,500.00 | $2,200.00 | $2,500.00 | $2,200.00 | $200.00 |
| 89 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 90 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 91 | Anchor Bolts (644.11) | LB | 682 | $15.00 | $14.00 | $13.00 | $18.00 | $14.00 |
| 92 | Drilled Shaft for Overhead Sign Structures (644.20) | CY | 27 | $2,867.00 | $2,800.00 | $2,700.00 | $4,750.00 | $2,500.00 |
| 93 | (644.432060) | EACH | 1 | $116,500 | $152,000 | $150,000 | $132,500 | $190,000 |
| 94 | Performance Concrete Quality Adjustment (644.99) | QUALITY UNIT | 1 | $16.25 | $16.25 | $16.25 | $16.25 | $16.25 |
| 95 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 1,200 | $38.50 | $40.00 | $38.00 | $37.00 | $41.00 |
| 96 | Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103) | SF | 812 | $33.50 | $35.00 | $34.00 | $35.00 | $36.00 |
| 97 | Overhead Sign Panels (645.61) | SF | 361 | $46.00 | $63.00 | $43.00 | $36.00 | $53.00 |
| 98 | Type A Sign Posts (645.81) | EACH | 143 | $225.00 | $235.00 | $225.00 | $240.00 | $250.00 |
| 99 | High-Capacity Type A Sign Posts with Soil Plates Only (645.8106) | EACH | 4 | $1,459.50 | $1,512.00 | $1,450.00 | $1,200.00 | $1,600.00 |
| 100 | Concrete Footing for Type A, or Breakaway Wooden Sign Posts with Steel Tube Inserts (645.8107) | EACH | 19 | $1,210.00 | $777.00 | $750.00 | $1,250.00 | $1,400.00 |
| 101 | (645.81090003) | 62 | $82.50 | $90.00 | $81.00 | $51.00 | $88.00 | |
| 102 | (645.830202) | EACH | 6 | $2,000.00 | $2,023.00 | $1,950.00 | $3,600.00 | $2,100.00 |
| 103 | (645.830402) | EACH | 2 | $3,500.00 | $3,627.00 | $3,500.00 | $3,900.00 | $3,800.00 |
| 104 | (645.830802) | EACH | 3 | $11,750 | $12,077 | $11,700 | $8,200.00 | $12,500 |
| 105 | Reference Marker Panel (646.21) | EACH | 6 | $45.00 | $50.00 | $45.00 | $32.00 | $50.00 |
| 106 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 27 | $22.50 | $25.00 | $22.00 | $21.00 | $24.00 |
| 107 | Steel Post, 2.0 lb/ft (646.32) | EACH | 28 | $100.00 | $110.00 | $98.00 | $63.00 | $105.00 |
| 108 | Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41) | EACH | 17 | $74.00 | $10.00 | $6.75 | $56.00 | $8.00 |
| 109 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 40 | $74.00 | $10.00 | $6.75 | $58.00 | $8.00 |
| 110 | (647.83001002) | 17 | $31.00 | $10.00 | $5.50 | $11.00 | $6.00 | |
| 111 | Parallel Bar Frame 10 PCB & Parallel Bar Grate 10 PCB (655.0901) | EACH | 1 | $1,310.00 | $2,044.00 | $1,650.00 | $2,900.00 | $1,500.00 |
| 112 | (670.2005) | LF | 1,985 | $43.00 | $43.00 | $35.00 | $47.00 | $55.00 |
| 113 | Pullboxes less than 5 cubic feet, inside volume (Lighting) (670.3001) | EACH | 10 | $2,825.00 | $2,358.00 | $2,500.00 | $2,500.00 | $2,700.00 |
| 114 | (680.05010007) | 1 | $26,400 | $28,033 | $25,000 | $26,000 | $26,500 | |
| 115 | (680.05020007) | 1 | $1,980.00 | $3,421.00 | $7,000.00 | $5,500.00 | $5,200.00 | |
| 116 | Pole Excavation and Concrete Foundation (680.5001) | CY | 4 | $3,575.00 | $2,400.00 | $6,000.00 | $3,400.00 | $3,500.00 |
| 117 | Concrete Work Pad (5 feet x 5 feet x 4 inches) (680.5003) | EACH | 1 | $4,180.00 | $820.00 | $4,000.00 | $4,000.00 | $1,500.00 |
| 118 | (680.50500005) | 7 | $30.00 | $100.00 | $325.00 | $550.00 | $750.00 | |
| 119 | (680.510301) | EACH | 2 | $2,090.00 | $2,713.00 | $3,000.00 | $3,500.00 | $2,700.00 |
| 120 | (680.520508) | LF | 239 | $18.00 | $9.00 | $14.00 | $23.00 | $20.00 |
| 121 | (680.6712) | EACH | 2 | $5,025.00 | $1,636.00 | $2,500.00 | $4,800.00 | $2,300.00 |
| 122 | Riser Assembly, 4-inch Diameter (680.700610) | EACH | 12 | $1,100.00 | $913.00 | $2,500.00 | $1,000.00 | $1,700.00 |
| 123 | (680.730514) | LF | 126 | $12.00 | $6.00 | $6.00 | $6.00 | $12.00 |
| 124 | (680.79000105) | 1 | $6,160.00 | $1,356.00 | $4,000.00 | $5,800.00 | $4,500.00 | |
| 125 | (680.79000205) | 1 | $7,700.00 | $1,356.00 | $4,000.00 | $5,800.00 | $4,500.00 | |
| 126 | Solar Power System (680.81) | EACH | 1 | $10,670 | $19,437 | $5,000.00 | $35,000 | $11,500 |
| 127 | Flashing Beacon Sign Assembly (680.8220) | EACH | 2 | $7,725.00 | $4,910.00 | $15,000 | $12,000 | $10,500 |
| 128 | (680.82250801) | 2 | $2,057.00 | $670.00 | $500.00 | $600.00 | $800.00 | |
| 129 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $8.50 | $8.50 | $8.50 | $8.50 | $8.50 |
| 130 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 19,629 | $0.65 | $0.64 | $0.60 | $0.75 | $0.70 |
| 131 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 14,109 | $0.65 | $0.64 | $0.60 | $0.75 | $0.70 |
| 132 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 20 | $87.00 | $85.00 | $80.00 | $92.00 | $90.00 |
| 133 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 25 | $325.00 | $320.00 | $300.00 | $350.00 | $330.00 |
| 134 | (686.05000011) | 1 | $3,080.00 | $3,046.00 | $2,900.00 | $3,300.00 | $3,200.00 | |
| 135 | Field Change Payment (FCP) (697.03) | DOL | 250,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 136 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 137 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 138 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 139 | (698.93000091) | LS | 1 | $60,000 | $60,000 | $60,000 | $60,000 | $60,000 |
| 140 | Mobilization (699.040001) | LS | 1 | $196,500 | $228,000 | $237,000 | $220,000 | $275,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of July 10, 2025. Compiled by Mirage Metrics.