NYSDOT contract D265770 bid tabulation
US 219 Crack & Seat & C540082 Rehabilitation. Let by New York State DOT on May 7, 2026, Erie, Region 05. 4 bids received; low bid $10,277,777 by D&H Excavating Inc.
- Owner
- New York State DOT
- Letting
- 07 MAY 2026
- Pay items
- 105
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D&H Excavating Inc | $10,277,777 | Low |
| 2 | McLaughlin Construction Corp/DBA Edbauer Construction | $10,986,908 | +7.0% |
| 3 | Concrete Applied Technologies Corp/DBA:Catco | $11,858,693 | +15% |
| 4 | Cold Spring Construction Company | $13,858,997 | +35% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D&H Excavating Inc | 2. McLaughlin Construction Corp/DBA Edbauer Construction | 3. Concrete Applied Technologies Corp/DBA:Catco | 4. Cold Spring Construction Company |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $25,000 | $10,000 | $15,000 | $90,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 16,100 | $30.00 | $40.00 | $36.00 | $36.00 |
| 3 | Embankment In Place (203.03) | CY | 2,300 | $41.00 | $18.00 | $35.00 | $7.50 |
| 4 | (203.24010017) | 1,450 | $62.00 | $51.00 | $40.00 | $55.00 | |
| 5 | Trench and Culvert Excavation (206.0201) | CY | 2,800 | $36.00 | $33.50 | $80.00 | $160.00 |
| 6 | Geotextile Stabilization (207.24) | SY | 2,000 | $4.50 | $1.50 | $7.00 | $3.75 |
| 7 | (207.96000017) | 18,000 | $0.50 | $0.26 | $2.85 | $4.00 | |
| 8 | Seed and Mulch – Temporary (209.1003) | SY | 3,300 | $1.75 | $0.50 | $1.00 | $2.50 |
| 9 | Stabilized Construction Access (209.22) | SY | 300 | $1.00 | $10.00 | $30.00 | $20.00 |
| 10 | (209.23010009) | 1,200 | $11.00 | $1.00 | $8.00 | $13.00 | |
| 11 | (304.00010018) | 455,000 | $0.15 | $0.10 | $0.30 | $0.20 | |
| 12 | (304.15200005) | 3,900 | $80.00 | $52.00 | $85.00 | $130.00 | |
| 13 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 950 | $105.00 | $105.00 | $105.00 | $105.00 |
| 14 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 248 | $105.00 | $105.00 | $105.00 | $105.00 |
| 15 | (404.0952) | TON | 3,700 | $144.00 | $179.00 | $160.00 | $195.00 |
| 16 | (404.0982) | TON | 230 | $168.00 | $189.00 | $185.00 | $200.00 |
| 17 | (404.1989) | TON | 95 | $140.00 | $200.00 | $175.00 | $190.00 |
| 18 | (404.3789) | TON | 13,600 | $104.00 | $102.00 | $102.50 | $120.00 |
| 19 | (406.0179) | TON | 15,600 | $127.00 | $110.00 | $108.00 | $135.00 |
| 20 | (406.0952) | TON | 11,600 | $124.00 | $129.00 | $130.00 | $145.00 |
| 21 | Diluted Tack Coat (407.0102) | GAL | 27,000 | $6.00 | $5.00 | $6.00 | $8.50 |
| 22 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 51,000 | $0.01 | $0.10 | $0.60 | $0.70 |
| 23 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 130,000 | $0.85 | $3.20 | $3.50 | $3.50 |
| 24 | (502.65960005) | 87,000 | $0.90 | $0.56 | $1.20 | $1.35 | |
| 25 | (510.20000018) | 800 | $91.00 | $96.00 | $38.00 | $65.00 | |
| 26 | (553.030001) | EACH | 1 | $1.00 | $100.00 | $100.00 | $0.01 |
| 27 | (553.030002) | EACH | 1 | $1.00 | $100.00 | $100.00 | $0.01 |
| 28 | (553.030003) | EACH | 1 | $1.00 | $100.00 | $100.00 | $0.01 |
| 29 | (553.030004) | EACH | 1 | $1.00 | $100.00 | $100.00 | $0.01 |
| 30 | (553.030005) | EACH | 1 | $1.00 | $100.00 | $100.00 | $0.01 |
| 31 | (553.030006) | EACH | 1 | $1.00 | $100.00 | $100.00 | $0.01 |
| 32 | (602.2654) | LF | 146 | $917.00 | $1,274.00 | $950.00 | $1,000.00 |
| 33 | (602.3636) | LF | 322 | $320.00 | $315.00 | $400.00 | $360.00 |
| 34 | (602.3642) | LF | 160 | $345.00 | $338.00 | $550.00 | $500.00 |
| 35 | (602.3648) | LF | 210 | $1.00 | $507.00 | $605.00 | $550.00 |
| 36 | (602.36540003) | 188 | $570.00 | $562.00 | $815.00 | $745.00 | |
| 37 | (603.171912) | EACH | 3 | $3,500.00 | $2,882.00 | $3,800.00 | $4,750.00 |
| 38 | Underdrain Filter, Type II (605.1001) | CY | 1,200 | $140.00 | $25.00 | $80.00 | $200.00 |
| 39 | (605.1701) | LF | 10,500 | $5.25 | $10.00 | $9.00 | $3.00 |
| 40 | (605.21010018) | 40 | $500.00 | $313.00 | $450.00 | $500.00 | |
| 41 | 4-Cable Mid-Tension Cable Guide Rail with 5 feet Post Spacing (606.010605) | LF | 975 | $111.00 | $110.00 | $108.00 | $100.00 |
| 42 | 4-Cable Mid-Tension Approach End Cable Terminal (606.020102) | EACH | 1 | $23,000 | $23,030 | $23,000 | $21,500 |
| 43 | Anchorage Units for 4-Cable Mid-Tension Cable Guide Railing (606.0202) | EACH | 1 | $14,000 | $13,535 | $13,500 | $12,500 |
| 44 | Removing and Disposing Cable Guide Railing (606.70) | LF | 960 | $6.50 | $4.50 | $4.15 | $8.00 |
| 45 | Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79) | EACH | 2 | $1,000.00 | $170.00 | $600.00 | $325.00 |
| 46 | Topsoil - Roadside (610.1402) | CY | 360 | $60.00 | $25.00 | $125.00 | $125.00 |
| 47 | Turf Establishment - Roadside (610.1601) | SY | 3,300 | $3.25 | $0.01 | $3.50 | $2.50 |
| 48 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $145,000 | $634,090 | $764,000 | $750,000 |
| 49 | Type III Construction Barricades (619.04) | EACH | 200 | $26.00 | $80.00 | $100.00 | $40.00 |
| 50 | (619.0901) | LF | 65,000 | $0.58 | $0.53 | $0.55 | $0.49 |
| 51 | (619.110513) | EACH | 6 | $7,250.00 | $4,700.00 | $16,000 | $14,000 |
| 52 | Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611) | MONTH | 6 | $12.00 | $448.00 | $10.00 | $750.00 |
| 53 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $27,000 | $28,000 | $100.00 | $50,000 |
| 54 | Stone Filling (Medium) (620.04) | CY | 125 | $218.00 | $140.00 | $260.00 | $223.00 |
| 55 | Bedding Material, Type 1 (620.0801) | CY | 25 | $177.00 | $110.00 | $200.00 | $156.00 |
| 56 | Survey Operations (625.01) | LS | 1 | $117,000 | $45,000 | $75,000 | $55,000 |
| 57 | (627.50140008) | 44,000 | $0.01 | $7.15 | $5.40 | $7.00 | |
| 58 | Cleaning Existing Pavement and/or Shoulder (633.11) | SY | 90,000 | $1.30 | $0.10 | $0.40 | $0.25 |
| 59 | Removal and Repair of Deteriorated Asphalt Pavement - Less than or equal to 4 Square Yards (633.1401) | SY | 400 | $1.00 | $1.00 | $100.00 | $140.00 |
| 60 | Removal and Repair of Deteriorated Asphalt Pavement – Greater than 4 Square Yards and less than 20 Square Yards (633.1402) | SY | 400 | $1.00 | $1.00 | $85.00 | $125.00 |
| 61 | Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403) | SY | 400 | $1.00 | $1.00 | $80.00 | $100.00 |
| 62 | Removal and Repair of Loose, Broken, or Spalled PCC Pavement (633.15) | SY | 4,500 | $56.00 | $38.00 | $30.00 | $91.00 |
| 63 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $200.00 | $10.00 | $3,800.00 | $1.00 |
| 64 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 12 | $2,200.00 | $1,100.00 | $2,600.00 | $2,400.00 |
| 65 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 66 | White Paint Reflectorized Pavement Stripes – 15 mils (640.10) | LF | 56,000 | $0.22 | $0.20 | $0.20 | $0.19 |
| 67 | Yellow Paint Reflectorized Pavement Stripes - 15 mils (640.11) | LF | 32,000 | $0.22 | $0.20 | $0.20 | $0.19 |
| 68 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 1,725 | $41.00 | $42.00 | $41.00 | $38.00 |
| 69 | Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103) | SF | 723 | $41.00 | $43.00 | $42.00 | $40.00 |
| 70 | Type A Sign Posts (645.81) | EACH | 205 | $220.00 | $224.00 | $219.00 | $210.00 |
| 71 | High-Capacity Type A Sign Posts with Soil Plates Only (645.8106) | EACH | 24 | $1,200.00 | $1,359.00 | $1,325.00 | $1,250.00 |
| 72 | (645.81090003) | 66 | $78.00 | $77.00 | $75.00 | $71.00 | |
| 73 | (645.830202) | EACH | 4 | $4,100.00 | $4,212.00 | $4,109.00 | $6,650.00 |
| 74 | (645.830402) | EACH | 6 | $6,000.00 | $7,070.00 | $6,897.00 | $8,400.00 |
| 75 | Reference Marker Panel (646.21) | EACH | 63 | $40.00 | $90.00 | $88.00 | $84.00 |
| 76 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 40 | $12.00 | $14.00 | $13.00 | $12.50 |
| 77 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 710 | $27.00 | $27.00 | $26.50 | $25.00 |
| 78 | Steel Post, 1.1 lb/ft (646.31) | EACH | 40 | $73.00 | $77.00 | $75.00 | $71.00 |
| 79 | Steel Post, 2.0 lb/ft (646.32) | EACH | 770 | $103.00 | $109.00 | $107.00 | $100.00 |
| 80 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 111 | $40.00 | $47.00 | $46.00 | $44.00 |
| 81 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62) | EACH | 7 | $135.00 | $440.00 | $429.00 | $410.00 |
| 82 | (647.83001002) | 667 | $15.00 | $17.00 | $16.50 | $16.00 | |
| 83 | Milled-In Audible Roadway Delineators (MIARDs) (649.01) | LF | 68,000 | $0.50 | $0.50 | $0.64 | $0.43 |
| 84 | Pavement Ride Quality Adjustment to Asphalt Level 1 (653.1010) | QUALITY UNIT | 496 | $105.00 | $105.00 | $105.00 | $105.00 |
| 85 | (662.60000108) | 2,500 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 86 | (662.60000208) | 2,500 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 87 | Pole Excavation and Concrete Foundation (680.5001) | CY | 5 | $1,000.00 | $5,230.00 | $3,600.00 | $7,500.00 |
| 88 | (680.6714) | EACH | 4 | $3,500.00 | $1,790.00 | $3,500.00 | $6,000.00 |
| 89 | Riser Assembly, 1-inch Diameter (680.700603) | EACH | 2 | $1,200.00 | $3,190.00 | $1,400.00 | $6,000.00 |
| 90 | (680.730514) | LF | 200 | $5.75 | $11.00 | $10.00 | $9.00 |
| 91 | (680.80270001) | 2 | $1.25 | $2,232.00 | $1,750.00 | $4,000.00 | |
| 92 | (680.80620215) | 2 | $1.25 | $3,672.00 | $2,500.00 | $4,000.00 | |
| 93 | Flashing Beacon Sign Assembly (680.8220) | EACH | 4 | $9,700.00 | $3,840.00 | $2,500.00 | $9,000.00 |
| 94 | Meter Pan (680.9402) | EACH | 2 | $1,200.00 | $1,300.00 | $1,200.00 | $1,000.00 |
| 95 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 2 | $1,100.00 | $710.00 | $1,100.00 | $850.00 |
| 96 | (680.950106) | LF | 200 | $3.50 | $12.00 | $10.00 | $8.00 |
| 97 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $17.50 | $17.50 | $17.50 | $17.50 |
| 98 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 82,000 | $0.45 | $0.45 | $0.43 | $0.40 |
| 99 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 65,000 | $0.45 | $0.45 | $0.43 | $0.40 |
| 100 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 6,000 | $3.50 | $3.40 | $3.30 | $3.00 |
| 101 | Field Change Payment (FCP) (697.03) | DOL | 460,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 102 | Asphalt Price Adjustment (698.04) | DOL | 6,013 | $1.00 | $1.00 | $1.00 | $1.00 |
| 103 | Fuel Price Adjustment (698.05) | DOL | 6,736 | $1.00 | $1.00 | $1.00 | $1.00 |
| 104 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 105 | Mobilization (699.040001) | LS | 1 | $366,095 | $422,000 | $456,000 | $533,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of May 7, 2026. Compiled by Mirage Metrics.