NYSDOT contract D265422 bid tabulation
Bridge Replacement - BIN 1001240 - NY-5 over Canadaway Creek. Let by New York State DOT on February 27, 2025, Chautauqua, Region 05. 3 bids received; low bid $3,362,038 by Oakgrove Construction Inc.
- Owner
- New York State DOT
- Letting
- 27 FEB 2025
- Pay items
- 102
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Oakgrove Construction Inc | $3,362,038 | Low |
| 2 | Union Concrete & Construction Corp | $3,737,997 | +11% |
| 3 | Cold Spring Construction Company | $3,989,550 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Oakgrove Construction Inc | 2. Union Concrete & Construction Corp | 3. Cold Spring Construction Company |
|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $10,000 | $15,000 | $30,000 |
| 2 | (202.120001) | LS | 1 | $75,000 | $160,000 | $150,000 |
| 3 | Removal of Substructures (202.19) | CY | 495 | $75.00 | $75.00 | $225.00 |
| 4 | Unclassified Excavation and Disposal (203.02) | CY | 1,077 | $20.00 | $21.00 | $45.00 |
| 5 | Embankment In Place (203.03) | CY | 1,568 | $25.00 | $64.00 | $35.00 |
| 6 | Select Structural Fill (203.21) | CY | 661 | $65.00 | $82.00 | $80.00 |
| 7 | Structure Excavation (206.01) | CY | 3,221 | $25.00 | $14.00 | $30.00 |
| 8 | Trench and Culvert Excavation (206.0201) | CY | 181 | $40.00 | $70.00 | $75.00 |
| 9 | Prefabricated Composite Integral Abutment Drain (207.27) | SY | 237 | $15.00 | $19.50 | $10.00 |
| 10 | Seed and Mulch – Temporary (209.1003) | SY | 845 | $1.00 | $0.65 | $1.00 |
| 11 | Turbidity Curtain – Temporary (209.1501) | LF | 417 | $25.00 | $25.00 | $20.00 |
| 12 | (209.23010009) | 565 | $6.00 | $12.00 | $10.00 | |
| 13 | Removal and Disposal of Underground Pipe ACM (BV14) (210.3111) | LF | 130 | $135.00 | $90.00 | $80.00 |
| 14 | Removal and Disposal of Bond Breaker/Filler ACM (BV14) (210.3312) | SF | 70 | $110.00 | $110.00 | $50.00 |
| 15 | (304.15200005) | 705 | $75.00 | $100.00 | $90.00 | |
| 16 | (404.0001) | TON | 51 | $100.00 | $100.00 | $100.00 |
| 17 | (404.0982) | TON | 190 | $115.00 | $143.00 | $150.00 |
| 18 | (404.1989) | TON | 323 | $105.00 | $120.00 | $125.00 |
| 19 | (404.3789) | TON | 515 | $95.00 | $112.00 | $110.00 |
| 20 | Diluted Tack Coat (407.0102) | GAL | 364 | $5.00 | $7.50 | $10.00 |
| 21 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 120 | $3.00 | $1.30 | $1.00 |
| 22 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 826 | $8.00 | $11.00 | $15.00 |
| 23 | (553.020001) | EACH | 2 | $20,000 | $12,000 | $60,000 |
| 24 | Footing Concrete, Performance (555.0011) | CY | 235 | $600.00 | $900.00 | $1,000.00 |
| 25 | Concrete for Structures, Performance (555.0021) | CY | 291 | $1,300.00 | $1,350.00 | $1,600.00 |
| 26 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $5.00 | $5.00 | $5.00 |
| 27 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $7.50 | $7.50 | $7.50 |
| 28 | Uncoated Bar Reinforcement for Concrete Structures (556.0201) | LB | 11,671 | $2.00 | $1.75 | $1.75 |
| 29 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 32,634 | $2.00 | $1.90 | $1.75 |
| 30 | Stud Shear Connectors for Bridges (556.03) | EACH | 4,266 | $6.00 | $5.00 | $7.00 |
| 31 | (557.1019) | SY | 278 | $350.00 | $455.00 | $400.00 |
| 32 | (557.1119) | SY | 582 | $425.00 | $485.00 | $525.00 |
| 33 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 824 | $0.01 | $0.01 | $0.01 |
| 34 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $12.19 | $12.19 | $12.19 |
| 35 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 777 | $10.00 | $13.00 | $15.00 |
| 36 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 7,856 | $1.00 | $0.50 | $1.00 |
| 37 | Protective Sealing of New Structural Concrete (559.02) | SF | 1,658 | $2.00 | $0.80 | $3.00 |
| 38 | (564.0501) | LS | 1 | $513,000 | $800,000 | $650,000 |
| 39 | Type E.B. Expansion Bearing (112 to 168 k) (565.2033) | EACH | 12 | $2,000.00 | $2,100.00 | $2,500.00 |
| 40 | Steel Bridge Railing (Four-Rail) (568.51) | LF | 256 | $230.00 | $255.00 | $250.00 |
| 41 | Transition Bridge Railing (568.70) | LF | 128 | $175.00 | $188.00 | $180.00 |
| 42 | (572.00020101) | LS | 1 | $131,000 | $110,000 | $150,000 |
| 43 | (572.00050101) | LS | 1 | $10,000 | $15,000 | $40,000 |
| 44 | Removal of Concrete Approach Slab (580.04) | SF | 864 | $7.00 | $7.00 | $10.00 |
| 45 | Prefabricated Adjustment Rings for Manholes (604.10) | EACH | 1 | $1,000.00 | $1,000.00 | $1,250.00 |
| 46 | Box Beam Guide Railing (606.10) | LF | 288 | $50.00 | $50.00 | $45.00 |
| 47 | Box Beam End Piece (606.120101) | EACH | 2 | $600.00 | $630.00 | $1,000.00 |
| 48 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 1 | $4,000.00 | $3,900.00 | $4,000.00 |
| 49 | Box Beam End Assembly Type III (606.1203) | EACH | 1 | $6,500.00 | $6,400.00 | $6,500.00 |
| 50 | Removing and Storing Box Beam Guide Railing (606.63) | LF | 712 | $10.00 | $6.00 | $15.00 |
| 51 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 23 | $200.00 | $255.00 | $200.00 |
| 52 | Compost (610.10) | CY | 12 | $100.00 | $145.00 | $135.00 |
| 53 | Topsoil - Roadside (610.1402) | CY | 186 | $75.00 | $85.00 | $110.00 |
| 54 | Turf Establishment - Roadside (610.1601) | SY | 1,685 | $1.00 | $2.25 | $2.50 |
| 55 | Watering Vegetation (610.19) | 1,000 GALLONS | 16 | $10.00 | $18.00 | $55.00 |
| 56 | (611.0151) | EACH | 5 | $1,500.00 | $1,600.00 | $1,130.00 |
| 57 | (611.0241) | EACH | 2 | $1,500.00 | $1,600.00 | $1,125.00 |
| 58 | (611.0452) | EACH | 15 | $150.00 | $160.00 | $585.00 |
| 59 | Portable Drip Irrigation System (611.17) | EACH | 7 | $75.00 | $80.00 | $35.00 |
| 60 | (611.19010024) | 5 | $50.00 | $50.00 | $210.00 | |
| 61 | (611.19020024) | 2 | $50.00 | $50.00 | $210.00 | |
| 62 | (611.19040024) | 15 | $10.00 | $10.00 | $60.00 | |
| 63 | Care of Trees Over 36” to 48” Diam. at Breast Height – Pruning (614.0441) | EACH | 1 | $2,000.00 | $2,400.00 | $1,000.00 |
| 64 | (614.060204) | EACH | 2 | $2,000.00 | $900.00 | $1,500.00 |
| 65 | (614.060304) | EACH | 1 | $2,000.00 | $1,750.00 | $2,500.00 |
| 66 | (614.060504) | EACH | 2 | $3,500.00 | $4,000.00 | $5,000.00 |
| 67 | (617.10000024) | 20 | $40.00 | $35.00 | $10.00 | |
| 68 | (617.11000024) | LS | 1 | $350.00 | $250.00 | $200.00 |
| 69 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $310,300 | $85,000 | $80,000 |
| 70 | Type III Construction Barricades (619.04) | EACH | 72 | $35.00 | $100.00 | $75.00 |
| 71 | (619.110513) | EACH | 10 | $6,000.00 | $5,800.00 | $7,500.00 |
| 72 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 80 | $25.00 | $20.00 | $70.00 |
| 73 | Stone Filling (Heavy) (620.05) | CY | 688 | $150.00 | $155.00 | $125.00 |
| 74 | Bedding Material, Type 1 (620.0801) | CY | 77 | $125.00 | $95.00 | $125.00 |
| 75 | Bedding Material, Type 2 (620.0802) | CY | 77 | $125.00 | $100.00 | $125.00 |
| 76 | Survey Operations (625.01) | LS | 1 | $20,000 | $30,000 | $25,000 |
| 77 | Concrete Right of Way Markers Type H (High) (625.03) | EACH | 1 | $500.00 | $525.00 | $500.00 |
| 78 | Concrete Right of Way Markers Type L (Low) (625.04) | EACH | 1 | $500.00 | $500.00 | $450.00 |
| 79 | Permanent Survey Markers (625.06) | EACH | 2 | $1,000.00 | $875.00 | $1,000.00 |
| 80 | (625.09010015) | LS | 1 | $1.00 | $500.00 | $2,500.00 |
| 81 | (627.50140008) | 200 | $5.00 | $9.50 | $5.00 | |
| 82 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $1,500.00 | $2,500.00 | $100.00 |
| 83 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 25 | $2,000.00 | $1,950.00 | $2,000.00 |
| 84 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 | $1.00 |
| 85 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 | $1.00 |
| 86 | White Paint Reflectorized Pavement Stripes – 20 mils (640.20) | LF | 2,025 | $0.50 | $1.00 | $1.00 |
| 87 | Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21) | LF | 1,266 | $0.50 | $1.00 | $1.00 |
| 88 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 12 | $50.00 | $47.00 | $50.00 |
| 89 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 6 | $40.00 | $41.00 | $40.00 |
| 90 | Type A Sign Posts (645.81) | EACH | 18 | $200.00 | $187.00 | $185.00 |
| 91 | Reference Marker Panel (646.21) | EACH | 2 | $50.00 | $48.00 | $50.00 |
| 92 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 7 | $20.00 | $19.00 | $20.00 |
| 93 | Steel Post, 2.0 lb/ft (646.32) | EACH | 8 | $75.00 | $75.00 | $75.00 |
| 94 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 12 | $175.00 | $175.00 | $125.00 |
| 95 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 38 | $10.00 | $10.00 | $10.00 |
| 96 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 675 | $6.00 | $6.50 | $6.00 |
| 97 | Field Change Payment (FCP) (697.03) | DOL | 158,000 | $1.00 | $1.00 | $1.00 |
| 98 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 99 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 100 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 101 | (698.93000091) | LS | 1 | $66,000 | $66,000 | $66,000 |
| 102 | Mobilization (699.040001) | LS | 1 | $129,300 | $143,000 | $153,288 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of February 27, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.