NYSDOT contract D265429 bid tabulation
BRIDGE REPLACEMENT - U.S. Route 219 over Great Valley Creek. Let by New York State DOT on March 13, 2025, Cattaraugus, Region 05. 4 bids received; low bid $6,479,435 by Union Concrete & Construction Corp.
- Owner
- New York State DOT
- Letting
- 13 MAR 2025
- Pay items
- 123
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Union Concrete & Construction Corp | $6,479,435 | Low |
| 2 | Cold Spring Construction Company | $6,745,000 | +4.0% |
| 3 | Concrete Applied Technologies Corp/DBA:Catco | $6,871,882 | +6.0% |
| 4 | The L C Whitford Co Inc | $6,880,987 | +6.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Union Concrete & Construction Corp | 2. Cold Spring Construction Company | 3. Concrete Applied Technologies Corp/DBA:Catco | 4. The L C Whitford Co Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $15,000 | $35,000 | $12,000 | $53,955 |
| 2 | (202.120001) | LS | 1 | $180,000 | $250,000 | $166,000 | $257,068 |
| 3 | Removal of Substructures (202.19) | CY | 285 | $105.00 | $205.00 | $169.00 | $436.92 |
| 4 | Unclassified Excavation and Disposal (203.02) | CY | 104 | $40.00 | $60.00 | $83.00 | $92.19 |
| 5 | Embankment In Place (203.03) | CY | 1,668 | $38.00 | $30.00 | $39.00 | $84.73 |
| 6 | Select Granular Fill, Slope Protection - Type A (203.0801) | CY | 62 | $59.00 | $100.00 | $81.00 | $100.24 |
| 7 | Select Structural Fill (203.21) | CY | 380 | $92.00 | $60.00 | $67.00 | $76.38 |
| 8 | Controlled Low Strength Material (CLSM) (204.01) | CY | 66 | $345.00 | $350.00 | $746.00 | $318.49 |
| 9 | Structure Excavation (206.01) | CY | 1,900 | $20.00 | $30.00 | $45.00 | $52.19 |
| 10 | Trench and Culvert Excavation (206.0201) | CY | 324 | $35.00 | $45.00 | $68.00 | $65.10 |
| 11 | Geotextile Bedding (207.20) | SY | 30 | $11.00 | $3.00 | $2.20 | $7.19 |
| 12 | Prefabricated Composite Integral Abutment Drain (207.27) | SY | 270 | $19.00 | $10.00 | $11.00 | $13.29 |
| 13 | Seed and Mulch – Temporary (209.1003) | SY | 659 | $0.70 | $6.25 | $1.00 | $17.24 |
| 14 | Stabilized Construction Access (209.22) | SY | 80 | $26.00 | $20.00 | $78.00 | $79.30 |
| 15 | Sediment Filter Log, 12″ (209.2301) | LF | 1,000 | $12.00 | $3.00 | $7.50 | $8.89 |
| 16 | Removal and Disposal of Bond Breaker/Filler ACM (BV14) (210.3312) | SF | 70 | $155.00 | $30.00 | $210.00 | $209.83 |
| 17 | (304.15200005) | 111 | $115.00 | $70.00 | $90.00 | $109.64 | |
| 18 | (404.0001) | TON | 30 | $100.00 | $100.00 | $100.00 | $100.00 |
| 19 | (404.0189) | TON | 3 | $300.00 | $500.00 | $405.00 | $248.06 |
| 20 | (404.0982) | TON | 119 | $235.00 | $165.00 | $210.00 | $248.06 |
| 21 | (404.1989) | TON | 268 | $170.00 | $155.00 | $130.00 | $198.45 |
| 22 | (404.3789) | TON | 191 | $190.00 | $145.00 | $150.00 | $198.45 |
| 23 | Diluted Tack Coat (407.0102) | GAL | 205 | $17.00 | $10.00 | $9.00 | $8.27 |
| 24 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 990 | $1.35 | $1.00 | $1.00 | $2.76 |
| 25 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 1,467 | $11.50 | $10.00 | $9.50 | $15.80 |
| 26 | Cast-In-Place Concrete Piles (551.11) | LF | 3,655 | $35.00 | $25.00 | $45.00 | $68.90 |
| 27 | Furnishing Equipment for Driving Piles (551.13) | LS | 1 | $400,000 | $475,000 | $390,000 | $264,114 |
| 28 | Performance Concrete Quality Adjustment - Cast In Place Piles (551.9902) | QUALITY UNIT | 1 | $5.68 | $5.68 | $5.68 | $5.68 |
| 29 | Interim Steel Sheeting (552.15) | SF | 3,955 | $38.00 | $0.01 | $39.00 | $55.55 |
| 30 | (553.020001) | EACH | 1 | $7,000.00 | $20,000 | $56,000 | $24,581 |
| 31 | (553.020002) | EACH | 1 | $7,000.00 | $20,000 | $59,000 | $24,581 |
| 32 | (553.020003) | EACH | 1 | $3,000.00 | $0.01 | $59,000 | $24,581 |
| 33 | (553.020004) | EACH | 1 | $3,000.00 | $0.01 | $59,000 | $24,581 |
| 34 | (553.030001) | EACH | 1 | $5,000.00 | $5,000.00 | $15,000 | $36,275 |
| 35 | (554.3001) | SF | 1,200 | $45.00 | $35.00 | $52.00 | $17.76 |
| 36 | Footing Concrete, Performance (555.0011) | CY | 57 | $1,050.00 | $1,500.00 | $1,226.00 | $903.18 |
| 37 | Concrete for Structures, Performance (555.0021) | CY | 240 | $1,275.00 | $1,500.00 | $1,630.00 | $1,127.40 |
| 38 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 100 | $4.50 | $4.50 | $4.50 | $4.50 |
| 39 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 100 | $6.38 | $6.38 | $6.38 | $6.38 |
| 40 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 45,093 | $2.15 | $2.00 | $2.10 | $4.31 |
| 41 | Stud Shear Connectors for Bridges (556.03) | EACH | 8,667 | $4.85 | $7.00 | $4.40 | $4.14 |
| 42 | (557.1019) | SY | 285 | $565.00 | $475.00 | $630.00 | $535.83 |
| 43 | (557.1119) | SY | 775 | $785.00 | $600.00 | $626.00 | $741.12 |
| 44 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 1,055 | $0.01 | $0.01 | $16.00 | $1.80 |
| 45 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $9.69 | $9.69 | $9.69 | $9.69 |
| 46 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 960 | $16.50 | $25.00 | $19.00 | $10.68 |
| 47 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 12,200 | $0.48 | $2.00 | $1.50 | $1.53 |
| 48 | Protective Sealing of New Structural Concrete (559.02) | SF | 2,520 | $0.75 | $2.00 | $2.50 | $2.71 |
| 49 | (564.0501) | LS | 1 | $2,210,000 | $2,300,000 | $1,913,000 | $1,793,048 |
| 50 | (565.30130101) | 18 | $715.00 | $1,000.00 | $400.00 | $148.76 | |
| 51 | Bridge Joint Header (567.62) | CF | 46 | $460.00 | $600.00 | $490.00 | $499.58 |
| 52 | Bridge Joint Seal (567.63) | LF | 92 | $82.00 | $60.00 | $105.00 | $33.69 |
| 53 | Performance Concrete Quality Adjustment (567.99) | QUALITY UNIT | 1 | $31.08 | $31.08 | $31.08 | $31.08 |
| 54 | Transition Bridge Railing (568.70) | LF | 160 | $197.00 | $225.00 | $200.00 | $199.28 |
| 55 | Single Slope (Half-Section) Concrete Bridge Barrier (569.04) | LF | 326 | $290.00 | $350.00 | $366.00 | $461.11 |
| 56 | Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99) | QUALITY UNIT | 1 | $9.26 | $9.26 | $9.26 | $9.26 |
| 57 | (572.00020101) | LS | 1 | $320,000 | $300,000 | $302,000 | $341,715 |
| 58 | Underdrain Filter, Type II (605.1001) | CY | 59 | $95.00 | $125.00 | $65.00 | $78.65 |
| 59 | (605.1501) | LF | 798 | $3.50 | $3.00 | $10.50 | $6.31 |
| 60 | (605.21010018) | 4 | $173.00 | $1,000.00 | $330.00 | $567.44 | |
| 61 | Box Beam Guide Railing (606.10) | LF | 666 | $55.00 | $60.00 | $54.00 | $54.58 |
| 62 | Box Beam End Piece (606.120101) | EACH | 4 | $675.00 | $1,500.00 | $675.00 | $672.53 |
| 63 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 1 | $4,400.00 | $5,000.00 | $4,620.00 | $4,602.94 |
| 64 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 3 | $2,200.00 | $3,000.00 | $2,200.00 | $2,193.98 |
| 65 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 714 | $6.00 | $15.00 | $7.50 | $14.37 |
| 66 | (607.41010010) | 135 | $5.00 | $5.00 | $7.00 | $13.05 | |
| 67 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 39 | $225.00 | $350.00 | $300.00 | $275.63 |
| 68 | Stone Curb – Bridge (Type A) (609.0301) | LF | 68 | $148.00 | $110.00 | $164.00 | $69.86 |
| 69 | Topsoil - Roadside (610.1402) | CY | 130 | $95.00 | $150.00 | $151.00 | $148.84 |
| 70 | Turf Establishment - Roadside (610.1601) | SY | 350 | $3.50 | $5.00 | $4.50 | $4.46 |
| 71 | (610.16050324) | 1,084 | $6.00 | $7.00 | $6.00 | $6.67 | |
| 72 | Watering Vegetation (610.19) | 1,000 GALLONS | 28 | $10.00 | $125.00 | $138.00 | $137.81 |
| 73 | (611.0151) | EACH | 13 | $1,150.00 | $1,250.00 | $1,155.00 | $1,186.29 |
| 74 | (611.0201) | EACH | 3 | $1,150.00 | $1,300.00 | $1,155.00 | $1,383.64 |
| 75 | (611.0452) | EACH | 21 | $190.00 | $250.00 | $193.00 | $243.65 |
| 76 | Portable Drip Irrigation System (611.17) | EACH | 16 | $80.00 | $75.00 | $83.00 | $80.48 |
| 77 | (611.19010024) | 13 | $55.00 | $250.00 | $55.00 | $263.50 | |
| 78 | (611.19020024) | 3 | $55.00 | $280.00 | $55.00 | $307.60 | |
| 79 | (611.19040024) | 21 | $11.00 | $75.00 | $11.00 | $72.77 | |
| 80 | (613.04000001) | 48 | $68.00 | $75.00 | $169.00 | $193.19 | |
| 81 | (614.060204) | EACH | 28 | $600.00 | $500.00 | $802.00 | $401.21 |
| 82 | (614.060304) | EACH | 13 | $1,200.00 | $1,000.00 | $1,605.00 | $2,737.82 |
| 83 | (616.08000024) | 320 | $16.00 | $50.00 | $17.00 | $48.51 | |
| 84 | (617.10000024) | 20 | $32.00 | $100.00 | $126.00 | $255.22 | |
| 85 | (617.11000024) | LS | 1 | $250.00 | $250.00 | $998.00 | $1,934.03 |
| 86 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $50,000 | $430,000 | $72,000 | $58,090 |
| 87 | (619.0501) | LS | 1 | $100,000 | $0.01 | $293,000 | $60,562 |
| 88 | (619.080102) | LF | 2,260 | $0.75 | $1.50 | $1.60 | $1.54 |
| 89 | (619.100104) | LF | 3,586 | $3.00 | $0.01 | $10.00 | $6.62 |
| 90 | (619.111113) | EACH | 2 | $9,200.00 | $7,500.00 | $6,000.00 | $1,738.55 |
| 91 | (619.1301) | EACH | 1 | $95,000 | $50,000 | $91,500 | $96,469 |
| 92 | (619.17060005) | 695 | $4.00 | $0.01 | $5.20 | $2.77 | |
| 93 | Temporary Positive Barrier – Category 4 (Pinning Permitted) (619.1714) | LF | 704 | $25.00 | $0.01 | $58.00 | $59.95 |
| 94 | Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715) | LF | 548 | $35.00 | $0.01 | $16.00 | $71.94 |
| 95 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 320 | $35.00 | $0.01 | $62.00 | $77.94 |
| 96 | Mailboxes (619.27) | EACH | 1 | $225.00 | $300.00 | $615.00 | $679.45 |
| 97 | Stone Filling (Light) (620.03) | CY | 157 | $147.00 | $125.00 | $175.00 | $125.81 |
| 98 | Stone Filling (Heavy) (620.05) | CY | 760 | $148.00 | $150.00 | $177.00 | $215.82 |
| 99 | Bedding Material, Type 1 (620.0801) | CY | 243 | $83.00 | $120.00 | $144.00 | $101.98 |
| 100 | (621.51970008) | 75 | $22.00 | $5.00 | $56.00 | $26.28 | |
| 101 | Crushed Stone (By Weight) (623.03) | TON | 20 | $55.00 | $60.00 | $58.00 | $85.01 |
| 102 | Crushed Stone (In-Place Measure) (623.12) | CY | 80 | $135.00 | $100.00 | $58.00 | $133.50 |
| 103 | Survey Operations (625.01) | LS | 1 | $35,000 | $35,000 | $30,000 | $56,834 |
| 104 | Permanent Survey Markers (625.06) | EACH | 2 | $900.00 | $750.00 | $1,200.00 | $3,087.43 |
| 105 | (625.09010015) | LS | 1 | $500.00 | $4,500.00 | $500.00 | $19,625 |
| 106 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $2,500.00 | $250.00 | $3,700.00 | $659.45 |
| 107 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 19 | $1,950.00 | $2,000.00 | $2,000.00 | $1,918.40 |
| 108 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 109 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 110 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 9 | $43.00 | $50.00 | $45.00 | $44.66 |
| 111 | Type A Sign Posts (645.81) | EACH | 6 | $220.00 | $500.00 | $226.00 | $226.01 |
| 112 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 8 | $16.00 | $20.00 | $16.00 | $16.54 |
| 113 | Steel Post, 1.1 lb/ft (646.31) | EACH | 1 | $64.00 | $115.00 | $66.00 | $66.15 |
| 114 | Steel Post, 2.0 lb/ft (646.32) | EACH | 6 | $80.00 | $225.00 | $83.00 | $82.69 |
| 115 | Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41) | EACH | 3 | $90.00 | $100.00 | $73.00 | $121.20 |
| 116 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 1 | $40.00 | $100.00 | $66.00 | $121.08 |
| 117 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 3,600 | $3.00 | $3.00 | $3.20 | $4.19 |
| 118 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 2,400 | $3.00 | $3.00 | $3.20 | $4.70 |
| 119 | Field Change Payment (FCP) (697.03) | DOL | 130,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 120 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 121 | Fuel Price Adjustment (698.05) | DOL | 404 | $1.00 | $1.00 | $1.00 | $1.00 |
| 122 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 123 | Mobilization (699.040001) | LS | 1 | $248,500 | $258,463 | $263,000 | $263,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 13, 2025. Compiled by Mirage Metrics.