NYSDOT contract D265525 bid tabulation
CULVERT REPLACEMENTS - Various Locations. Let by New York State DOT on October 23, 2025, Steuben, Yates, Region 06. 2 bids received; low bid $10,993,000 by Twin Tier Constructors Inc.
- Owner
- New York State DOT
- Letting
- 23 OCT 2025
- Pay items
- 144
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Twin Tier Constructors Inc | $10,993,000 | Low |
| 2 | Cold Spring Construction Company | $12,183,500 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Twin Tier Constructors Inc | 2. Cold Spring Construction Company |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $100,000 | $85,000 |
| 2 | Removal of Substructures (202.19) | CY | 285 | $170.00 | $175.00 |
| 3 | Unclassified Excavation and Disposal (203.02) | CY | 2,965 | $20.00 | $35.00 |
| 4 | Embankment In Place (203.03) | CY | 5,350 | $20.00 | $35.00 |
| 5 | Select Granular Fill (203.07) | CY | 1,680 | $80.00 | $105.00 |
| 6 | Select Structural Fill (203.21) | CY | 525 | $65.00 | $105.00 |
| 7 | Structure Excavation (206.01) | CY | 11,955 | $17.00 | $30.00 |
| 8 | Trench and Culvert Excavation (206.0201) | CY | 240 | $55.00 | $55.00 |
| 9 | Geotextile Bedding (207.20) | SY | 2,470 | $3.50 | $2.00 |
| 10 | Geotextile Separation (207.21) | SY | 10,980 | $2.25 | $1.35 |
| 11 | Geotextile Drainage (207.22) | SY | 645 | $3.00 | $3.75 |
| 12 | Prefabricated Composite Structural Drain (207.26) | SY | 225 | $35.00 | $15.00 |
| 13 | Check Dam (Ditch Bottom Width >3′ to 6′), Stone – Temporary (209.110102) | EACH | 10 | $700.00 | $600.00 |
| 14 | Silt Fence - Temporary (209.13) | LF | 3,552 | $6.00 | $5.00 |
| 15 | Drainage Structure Inlet Protection, Silt Fence – Temporary (209.1701) | LF | 90 | $8.00 | $10.00 |
| 16 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 5,251 | $2.00 | $8.00 |
| 17 | Subbase Course, Type 1 (304.11) | CY | 60 | $100.00 | $150.00 |
| 18 | Subbase Course, Optional Type (304.15) | CY | 4,795 | $65.00 | $125.00 |
| 19 | (404.0289) | TON | 360 | $150.00 | $140.00 |
| 20 | (404.0983) | TON | 715 | $170.00 | $200.00 |
| 21 | (404.1989) | TON | 2,325 | $150.00 | $150.00 |
| 22 | (404.3789) | TON | 4,315 | $135.00 | $135.00 |
| 23 | Diluted Tack Coat (407.0102) | GAL | 2,800 | $4.00 | $16.00 |
| 24 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 2,785 | $2.00 | $1.00 |
| 25 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 2,545 | $15.00 | $30.00 |
| 26 | Temporary Steel Sheeting (552.13) | SF | 8,160 | $175.00 | $90.00 |
| 27 | (553.020001) | EACH | 1 | $5,000.00 | $1.00 |
| 28 | (553.020002) | EACH | 1 | $5,000.00 | $1.00 |
| 29 | (553.020003) | EACH | 1 | $5,000.00 | $1.00 |
| 30 | (553.020004) | EACH | 1 | $5,000.00 | $1.00 |
| 31 | (553.020005) | EACH | 1 | $5,000.00 | $1.00 |
| 32 | (553.020006) | EACH | 1 | $5,000.00 | $1.00 |
| 33 | (553.020007) | EACH | 1 | $5,000.00 | $1.00 |
| 34 | (553.020008) | EACH | 1 | $5,000.00 | $1.00 |
| 35 | (553.020009) | EACH | 1 | $5,000.00 | $1.00 |
| 36 | (553.020010) | EACH | 1 | $5,000.00 | $1.00 |
| 37 | (553.030001) | EACH | 1 | $5,000.00 | $5,000.00 |
| 38 | (553.030002) | EACH | 1 | $5,000.00 | $5,000.00 |
| 39 | (553.030003) | EACH | 1 | $5,000.00 | $5,000.00 |
| 40 | (553.030004) | EACH | 1 | $5,000.00 | $5,000.00 |
| 41 | (553.030005) | EACH | 1 | $5,000.00 | $5,000.00 |
| 42 | (553.030006) | EACH | 1 | $5,000.00 | $5,000.00 |
| 43 | (553.030007) | EACH | 1 | $5,000.00 | $5,000.00 |
| 44 | (553.030008) | EACH | 1 | $5,000.00 | $5,000.00 |
| 45 | (553.030009) | EACH | 1 | $5,000.00 | $5,000.00 |
| 46 | (554.3001) | SF | 257 | $20.00 | $75.00 |
| 47 | Footing Concrete, Performance (555.0011) | CY | 145 | $1,000.00 | $2,000.00 |
| 48 | Concrete for Structures, Performance (555.0021) | CY | 145 | $2,500.00 | $3,500.00 |
| 49 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $5.55 | $5.55 |
| 50 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $10.08 | $10.08 |
| 51 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 30,067 | $5.00 | $3.50 |
| 52 | Protective Sealing of New Structural Concrete (559.02) | SF | 2,795 | $4.00 | $5.00 |
| 53 | (562.0101) | SY | 291 | $1,600.00 | $2,200.00 |
| 54 | Invert Slab With Cut-Off Wall (562.02) | SY | 325 | $1,000.00 | $1,600.00 |
| 55 | Performance Concrete Quality Adjustment (562.99) | QUALITY UNIT | 1 | $11.57 | $11.57 |
| 56 | Steel Bridge Railing (Three-Rail) (568.54) | LF | 166 | $230.00 | $300.00 |
| 57 | Transition Bridge Railing (568.70) | LF | 384 | $220.00 | $200.00 |
| 58 | (586.10010008) | 50,000 | $1.00 | $1.00 | |
| 59 | (595.50000018) | 20,655 | $4.00 | $9.00 | |
| 60 | (602.90200107) | 55 | $1,300.00 | $1,750.00 | |
| 61 | (603.171216) | EACH | 4 | $450.00 | $1,500.00 |
| 62 | (603.171614) | EACH | 4 | $600.00 | $2,000.00 |
| 63 | (603.64160715) | 256 | $2,600.00 | $3,000.00 | |
| 64 | (603.64161015) | 45 | $4,400.00 | $5,000.00 | |
| 65 | (603.9812) | LF | 79 | $35.00 | $130.00 |
| 66 | (603.9824) | LF | 55 | $50.00 | $180.00 |
| 67 | Underdrain Filter, Type I (605.0901) | CY | 85 | $70.00 | $150.00 |
| 68 | Underdrain Filter, Type II (605.1001) | CY | 65 | $70.00 | $165.00 |
| 69 | (605.1701) | LF | 825 | $4.00 | $6.00 |
| 70 | (605.98101218) | 1,175 | $16.00 | $40.00 | |
| 71 | Box Beam Guide Railing (606.10) | LF | 1,614 | $55.00 | $50.00 |
| 72 | Box Beam End Piece (606.120101) | EACH | 3 | $710.00 | $1,000.00 |
| 73 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 2 | $5,500.00 | $4,750.00 |
| 74 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 14 | $2,110.00 | $2,250.00 |
| 75 | Box Beam End Assembly Type III (606.1203) | EACH | 1 | $7,400.00 | $7,000.00 |
| 76 | HPBO (Mod.) Corrugated Beam Guide Railing (606.2701) | LF | 121 | $66.00 | $60.00 |
| 77 | Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing (606.2703) | EACH | 1 | $3,900.00 | $3,500.00 |
| 78 | Removing and Disposing HPBO (Mod.) Corrugated Beam Guide Railing (606.7101) | LF | 153 | $5.00 | $15.00 |
| 79 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 1,067 | $7.00 | $10.00 |
| 80 | (607.31010010) | 50 | $160.00 | $100.00 | |
| 81 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 152 | $300.00 | $275.00 |
| 82 | Stone Curb – Bridge (Type A) (609.0301) | LF | 180 | $90.00 | $375.00 |
| 83 | Topsoil - Roadside (610.1402) | CY | 300 | $120.00 | $100.00 |
| 84 | Topsoil – Wetland Materials (610.1407) | CY | 45 | $140.00 | $125.00 |
| 85 | Turf Establishment – Performance (610.1605) | SY | 5,840 | $20.00 | $20.00 |
| 86 | (611.0151) | EACH | 7 | $900.00 | $1,500.00 |
| 87 | Portable Drip Irrigation System (611.17) | EACH | 7 | $150.00 | $35.00 |
| 88 | (611.19010024) | 7 | $200.00 | $300.00 | |
| 89 | (613.04000001) | 540 | $35.00 | $60.00 | |
| 90 | (615.01010108) | 105 | $70.00 | $40.00 | |
| 91 | (617.11000024) | LS | 1 | $100.00 | $500.00 |
| 92 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $280,000 | $300,000 |
| 93 | Type III Construction Barricades (619.04) | EACH | 4 | $75.00 | $200.00 |
| 94 | (619.080101) | LF | 15,420 | $4.00 | $0.85 |
| 95 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 23,655 | $6.00 | $4.50 |
| 96 | (619.100101) | LF | 64,007 | $6.00 | $1.00 |
| 97 | (619.110511) | EACH | 10 | $3,000.00 | $8,000.00 |
| 98 | (619.130101) | EACH | 1 | $45,000 | $50,000 |
| 99 | (619.130102) | EACH | 1 | $60,000 | $50,000 |
| 100 | (619.130103) | EACH | 1 | $100,000 | $50,000 |
| 101 | (619.17060005) | 8,680 | $5.00 | $1.00 | |
| 102 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 3,546 | $45.00 | $20.00 |
| 103 | Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715) | LF | 10,140 | $30.00 | $25.00 |
| 104 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 2,490 | $30.00 | $30.00 |
| 105 | Temporary Positive Barrier – Category 7 (Pinning and Box-Beam-Stiffening Required) (619.1717) | LF | 1,600 | $40.00 | $35.00 |
| 106 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 452 | $20.00 | $60.00 |
| 107 | Temporary Impact Attenuator - Redirective (Test Level 2) (619.1802) | EACH | 39 | $1,000.00 | $15,500 |
| 108 | Mailboxes (619.27) | EACH | 6 | $450.00 | $350.00 |
| 109 | (619.90020001) | 80 | $100.00 | $500.00 | |
| 110 | Stone Filling (Light) (620.03) | CY | 20 | $120.00 | $175.00 |
| 111 | Stone Filling (Medium) (620.04) | CY | 730 | $140.00 | $225.00 |
| 112 | Stone Filling (Heavy) (620.05) | CY | 1,345 | $180.00 | $275.00 |
| 113 | Bedding Material, Type 2 (620.0802) | CY | 445 | $70.00 | $125.00 |
| 114 | Cleaning Culverts with Span of More Than 50 in. (621.02) | LF | 55 | $85.00 | $50.00 |
| 115 | (621.05020004) | 2,940 | $5.00 | $4.25 | |
| 116 | Crushed Stone (In-Place Measure) (623.12) | CY | 390 | $80.00 | $125.00 |
| 117 | Survey Operations (625.01) | LS | 1 | $75,000 | $70,000 |
| 118 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 14 | $170.00 | $200.00 |
| 119 | (627.50140008) | 602 | $30.00 | $15.00 | |
| 120 | Concrete Cylinder Curing Equipment (637.04) | EACH | 4 | $1,000.00 | $1,000.00 |
| 121 | Engineer’s Field Office – Type 1 (637.11) | MONTH | 30 | $1,000.00 | $2,750.00 |
| 122 | Office Technology and Supplies (637.34) | DOL | 1,000 | $1.00 | $1.00 |
| 123 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 |
| 124 | (637.41000115) | 30 | $150.00 | $150.00 | |
| 125 | (637.41000215) | 30 | $150.00 | $150.00 | |
| 126 | (637.41000315) | 30 | $150.00 | $150.00 | |
| 127 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 8 | $60.00 | $55.00 |
| 128 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 11 | $60.00 | $50.00 |
| 129 | Type A Sign Posts (645.81) | EACH | 1 | $300.00 | $225.00 |
| 130 | Reference Marker Panel (646.21) | EACH | 13 | $43.00 | $35.00 |
| 131 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 39 | $20.00 | $15.00 |
| 132 | Steel Post, 2.0 lb/ft (646.32) | EACH | 30 | $100.00 | $70.00 |
| 133 | Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41) | EACH | 2 | $13.00 | $100.00 |
| 134 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 1 | $13.00 | $100.00 |
| 135 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 1 | $13.00 | $100.00 |
| 136 | (647.83001002) | 20 | $13.00 | $100.00 | |
| 137 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 27,976 | $4.50 | $1.00 |
| 138 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 24,049 | $4.50 | $1.00 |
| 139 | (691.04000020) | 164,000 | $1.00 | $1.00 | |
| 140 | Field Change Payment (FCP) (697.03) | DOL | 891,637 | $1.00 | $1.00 |
| 141 | Asphalt Price Adjustment (698.04) | DOL | 9,841 | $1.00 | $1.00 |
| 142 | Fuel Price Adjustment (698.05) | DOL | 11,130 | $1.00 | $1.00 |
| 143 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 144 | Mobilization (699.040001) | LS | 1 | $385,875 | $463,514 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of October 23, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.