NYSDOT contract D265577 bid tabulation
BRIDGE REPLACEMENT - NY Rt 19 over Black Creek Overflow. Let by New York State DOT on November 20, 2025, Genesee, Region 04. 2 bids received; low bid $2,494,428 by C P Ward Inc.
- Owner
- New York State DOT
- Letting
- 20 NOV 2025
- Pay items
- 108
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | C P Ward Inc | $2,494,428 | Low |
| 2 | Cold Spring Construction Company | $3,083,460 | +24% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. C P Ward Inc | 2. Cold Spring Construction Company |
|---|---|---|---|---|---|
| 1 | (201.07000004) | 992 | $20.00 | $6.00 | |
| 2 | (202.120001) | LS | 1 | $58,000 | $135,000 |
| 3 | Removal of Substructures (202.19) | CY | 113 | $295.00 | $250.00 |
| 4 | Unclassified Excavation and Disposal (203.02) | CY | 44 | $44.00 | $160.00 |
| 5 | Embankment In Place (203.03) | CY | 4,475 | $43.00 | $55.00 |
| 6 | Select Structural Fill (203.21) | CY | 109 | $95.00 | $145.00 |
| 7 | Sand Backfill (203.25) | CY | 6 | $200.00 | $775.00 |
| 8 | (203.51990006) | 570 | $18.00 | $10.00 | |
| 9 | Structure Excavation (206.01) | CY | 519 | $43.00 | $42.00 |
| 10 | Trench and Culvert Excavation (206.0201) | CY | 273 | $55.00 | $60.00 |
| 11 | Prefabricated Composite Integral Abutment Drain (207.27) | SY | 125 | $22.00 | $17.50 |
| 12 | (208.01030022) | 80 | $130.00 | $120.00 | |
| 13 | Seed and Mulch – Temporary (209.1003) | SY | 4,852 | $2.50 | $1.00 |
| 14 | (209.11000001) | 2 | $300.00 | $1,000.00 | |
| 15 | Check Dam (Ditch Bottom Width >3′ to 6′), Gravel Bag – Temporary (209.110202) | EACH | 5 | $800.00 | $1,200.00 |
| 16 | Check Dam, (Ditch Bottom Width >3′ to 6′), Stone – Permanent (209.110602) | EACH | 6 | $1,100.00 | $1,600.00 |
| 17 | Turbidity Curtain – Temporary (209.1501) | LF | 325 | $20.00 | $28.00 |
| 18 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 387 | $5.00 | $9.50 |
| 19 | Soil Stabilizers, Class IV Type A (209.2101) | SY | 4,962 | $2.50 | $1.00 |
| 20 | Sediment Filter Log, 12″ (209.2301) | LF | 901 | $20.00 | $10.00 |
| 21 | Subbase Course, Type 2 (304.12) | CY | 1,668 | $72.00 | $70.00 |
| 22 | (404.0001) | TON | 93 | $95.00 | $95.00 |
| 23 | (404.0982) | TON | 360 | $130.00 | $135.00 |
| 24 | (404.1989) | TON | 552 | $120.00 | $120.00 |
| 25 | (404.3789) | TON | 883 | $107.00 | $105.00 |
| 26 | Diluted Tack Coat (407.0102) | GAL | 478 | $15.00 | $15.00 |
| 27 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 1,056 | $4.00 | $0.80 |
| 28 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 4,033 | $9.00 | $4.25 |
| 29 | (551.03950017) | 448 | $50.00 | $200.00 | |
| 30 | Cast-In-Place Concrete Piles (551.11) | LF | 496 | $180.00 | $250.00 |
| 31 | Furnishing Equipment for Driving Piles (551.13) | LS | 1 | $70,000 | $115,000 |
| 32 | Performance Concrete Quality Adjustment - Cast In Place Piles (551.9902) | QUALITY UNIT | 1 | $15.15 | $15.15 |
| 33 | (553.020001) | EACH | 1 | $4,000.00 | $0.01 |
| 34 | (553.020002) | EACH | 1 | $4,000.00 | $0.01 |
| 35 | (553.020003) | EACH | 1 | $4,000.00 | $0.01 |
| 36 | (553.030001) | EACH | 1 | $4,000.00 | $0.01 |
| 37 | Concrete for Structures, Performance (555.0021) | CY | 112 | $1,400.00 | $1,650.00 |
| 38 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $7.50 | $7.50 |
| 39 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 23,482 | $2.75 | $3.15 |
| 40 | Stud Shear Connectors for Bridges (556.03) | EACH | 1,212 | $5.00 | $7.00 |
| 41 | (557.1019) | SY | 150 | $440.00 | $500.00 |
| 42 | (557.1119) | SY | 247 | $640.00 | $800.00 |
| 43 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 398 | $0.01 | $0.01 |
| 44 | (557.60010004) | 380 | $40.00 | $40.00 | |
| 45 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $9.05 | $9.05 |
| 46 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 380 | $20.00 | $20.00 |
| 47 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 3,861 | $0.75 | $1.00 |
| 48 | Protective Sealing of New Structural Concrete (559.02) | SF | 1,907 | $5.00 | $1.70 |
| 49 | (564.0501) | LS | 1 | $250,000 | $425,000 |
| 50 | (564.20010008) | 73,000 | $0.50 | $0.42 | |
| 51 | (565.30130101) | 12 | $250.00 | $1,100.00 | |
| 52 | Transition Bridge Railing (568.70) | LF | 160 | $200.00 | $195.00 |
| 53 | Single Slope (Half-Section) Concrete Bridge Barrier (569.04) | LF | 106 | $520.00 | $600.00 |
| 54 | Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99) | QUALITY UNIT | 1 | $13.23 | $13.23 |
| 55 | (570.090001) | LS | 1 | $100.00 | $0.01 |
| 56 | (570.10) | LS | 1 | $100.00 | $0.01 |
| 57 | Bridge Railing Removal and Disposal (587.01) | LF | 66 | $15.00 | $25.00 |
| 58 | (603.87020015) | 21 | $100.00 | $154.00 | |
| 59 | Box Beam Guide Railing (606.10) | LF | 577 | $44.00 | $47.00 |
| 60 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 4 | $4,000.00 | $3,900.00 |
| 61 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 656 | $10.00 | $12.50 |
| 62 | (607.41010010) | 2,446 | $5.00 | $5.50 | |
| 63 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 1 | $95.00 | $95.00 |
| 64 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 56 | $300.00 | $340.00 |
| 65 | Stone Curb – Near Vertical Face (NVF) (609.0212) | LF | 57 | $165.00 | $170.00 |
| 66 | (610.16040224) | 94 | $34.00 | $20.00 | |
| 67 | Turf Establishment – Performance (610.1605) | SY | 5,761 | $14.00 | $16.00 |
| 68 | (614.060104) | EACH | 1 | $610.00 | $400.00 |
| 69 | (614.060204) | EACH | 10 | $1,400.00 | $1,100.00 |
| 70 | (614.060304) | EACH | 1 | $1,700.00 | $1,300.00 |
| 71 | (614.060404) | EACH | 2 | $2,000.00 | $1,500.00 |
| 72 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $42,000 | $65,000 |
| 73 | Type III Construction Barricades (619.04) | EACH | 22 | $85.00 | $130.00 |
| 74 | (619.100101) | LF | 4,048 | $0.50 | $0.45 |
| 75 | (619.111211) | WEEK | 2 | $800.00 | $1,250.00 |
| 76 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 80 | $80.00 | $35.00 |
| 77 | Mailboxes (619.27) | EACH | 1 | $500.00 | $335.00 |
| 78 | Stone Filling (Light) (620.03) | CY | 17 | $155.00 | $275.00 |
| 79 | Stone Filling (Medium) (620.04) | CY | 386 | $120.00 | $125.00 |
| 80 | Bedding Material, Type 1 (620.0801) | CY | 58 | $110.00 | $160.00 |
| 81 | Bedding Material, Type 2 (620.0802) | CY | 58 | $110.00 | $160.00 |
| 82 | Cleaning Culverts with Span of 50 in. or Less (621.01) | LF | 117 | $20.00 | $30.00 |
| 83 | Survey Operations (625.01) | LS | 1 | $30,000 | $75,000 |
| 84 | Concrete Right of Way Markers Type L (Low) (625.04) | EACH | 9 | $1,500.00 | $1,150.00 |
| 85 | (625.09010015) | LS | 1 | $3,500.00 | $1.00 |
| 86 | (627.50140008) | 72 | $3.00 | $12.00 | |
| 87 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $1,000.00 | $200.00 |
| 88 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 6 | $2,800.00 | $2,900.00 |
| 89 | Rain Gauge (637.26) | EACH | 1 | $500.00 | $50.00 |
| 90 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 |
| 91 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 |
| 92 | (637.41000115) | 18 | $200.00 | $185.00 | |
| 93 | Reference Marker Panel (646.21) | EACH | 3 | $33.00 | $31.00 |
| 94 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 14 | $20.00 | $17.50 |
| 95 | Steel Post, 2.0 lb/ft (646.32) | EACH | 17 | $62.00 | $55.00 |
| 96 | (647.83001002) | 3 | $180.00 | $75.00 | |
| 97 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 985 | $7.00 | $4.50 |
| 98 | (663.0604) | LF | 73 | $60.00 | $120.00 |
| 99 | (663.2604) | EACH | 1 | $2,200.00 | $2,500.00 |
| 100 | Adjust Existing Hydrant Elevation (663.34) | EACH | 1 | $1,500.00 | $2,800.00 |
| 101 | Remove and Dispose of Existing Water Service Connection (663.44) | EACH | 1 | $1,800.00 | $2,000.00 |
| 102 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 3,210 | $2.75 | $1.55 |
| 103 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 838 | $2.75 | $1.55 |
| 104 | Field Change Payment (FCP) (697.03) | DOL | 100,000 | $1.00 | $1.00 |
| 105 | Asphalt Price Adjustment (698.04) | DOL | 2,357 | $1.00 | $1.00 |
| 106 | Fuel Price Adjustment (698.05) | DOL | 737 | $1.00 | $1.00 |
| 107 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 108 | Mobilization (699.040001) | LS | 1 | $94,000 | $118,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of November 20, 2025. Compiled by Mirage Metrics.