NYSDOT contract D265622 bid tabulation
CULVERT REPLACEMENTS - Various Locations. Let by New York State DOT on December 18, 2025, Genesee, Livingston, Monroe, Orleans,, Region 04. 3 bids received; low bid $4,510,000 by Rochester Earth Inc.
- Owner
- New York State DOT
- Letting
- 18 DEC 2025
- Pay items
- 116
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rochester Earth Inc | $4,510,000 | Low |
| 2 | Keeler Construction Co Inc | $5,931,532 | +32% |
| 3 | C P Ward Inc | $6,290,088 | +39% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rochester Earth Inc | 2. Keeler Construction Co Inc | 3. C P Ward Inc |
|---|---|---|---|---|---|---|
| 1 | (201.07000004) | 945 | $39.00 | $40.00 | $64.00 | |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 487 | $32.00 | $38.00 | $47.00 |
| 3 | Embankment In Place (203.03) | CY | 7,691 | $29.00 | $60.00 | $57.00 |
| 4 | Select Granular Fill (203.07) | CY | 1,612 | $60.50 | $118.00 | $83.00 |
| 5 | (203.24010017) | 4 | $113.00 | $480.00 | $163.00 | |
| 6 | Sand Backfill (203.25) | CY | 14 | $112.50 | $84.00 | $510.00 |
| 7 | Structure Excavation (206.01) | CY | 13,965 | $24.50 | $34.00 | $44.00 |
| 8 | Trench and Culvert Excavation (206.0201) | CY | 839 | $22.00 | $63.00 | $58.00 |
| 9 | Geotextile Bedding (207.20) | SY | 1,376 | $3.00 | $5.00 | $11.00 |
| 10 | Prefabricated Composite Structural Drain (207.26) | SY | 787 | $20.00 | $18.00 | $22.00 |
| 11 | Seed and Mulch – Temporary (209.1003) | SY | 2,443 | $2.00 | $6.00 | $3.00 |
| 12 | Check Dam (Ditch Bottom Width 0.0 to 3′), Stone – Temporary (209.110101) | EACH | 5 | $411.50 | $1,000.00 | $720.00 |
| 13 | Check Dam (Ditch Bottom Width >3′ to 6′), Stone – Temporary (209.110102) | EACH | 3 | $377.00 | $1,400.00 | $480.00 |
| 14 | Drainage Structure Inlet Protection, Silt Fence – Temporary (209.1701) | LF | 20 | $34.50 | $8.00 | $20.00 |
| 15 | Rolled Erosion Control Product, Class II Type A, Intermediate (209.1901) | SY | 1,537 | $5.75 | $9.00 | $13.00 |
| 16 | Sediment Filter Log, 12″ (209.2301) | LF | 464 | $5.00 | $16.00 | $26.00 |
| 17 | Removal and Disposal of Underground Pipe ACM (BV14) (210.3111) | LF | 90 | $126.50 | $200.00 | $260.00 |
| 18 | Subbase Course, Type 1 (304.11) | CY | 36 | $125.00 | $207.00 | $280.00 |
| 19 | Subbase Course, Type 2 (304.12) | CY | 846 | $66.75 | $121.00 | $85.00 |
| 20 | (404.0001) | TON | 81 | $95.00 | $95.00 | $95.00 |
| 21 | (404.0189) | TON | 89 | $258.00 | $270.00 | $175.00 |
| 22 | (404.0983) | TON | 393 | $250.00 | $175.00 | $160.00 |
| 23 | (404.1989) | TON | 390 | $190.00 | $165.00 | $170.00 |
| 24 | (404.3789) | TON | 628 | $190.00 | $178.00 | $150.00 |
| 25 | Diluted Tack Coat (407.0102) | GAL | 597 | $19.50 | $10.00 | $27.00 |
| 26 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 3,544 | $3.75 | $0.50 | $5.00 |
| 27 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 1,788 | $8.00 | $26.00 | $25.00 |
| 28 | Shields and Shoring (552.17) | SF | 2,255 | $1.25 | $2.00 | $1.00 |
| 29 | (553.030001) | EACH | 1 | $32,250 | $26,000 | $20,000 |
| 30 | (553.030002) | EACH | 1 | $32,250 | $26,000 | $20,000 |
| 31 | (553.030003) | EACH | 1 | $32,250 | $26,000 | $20,000 |
| 32 | (553.030004) | EACH | 1 | $32,250 | $26,000 | $20,000 |
| 33 | (553.030005) | EACH | 1 | $32,250 | $26,000 | $20,000 |
| 34 | Footing Concrete, Performance (555.0011) | CY | 138 | $1,050.00 | $1,175.00 | $1,200.00 |
| 35 | Concrete for Structures, Performance (555.0021) | CY | 107 | $2,135.00 | $2,050.00 | $2,600.00 |
| 36 | (555.05010001) | 26 | $410.00 | $1,300.00 | $2,000.00 | |
| 37 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 3 | $7.50 | $7.50 | $7.50 |
| 38 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 3 | $8.00 | $8.00 | $8.00 |
| 39 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 28,666 | $4.00 | $4.50 | $5.00 |
| 40 | Steel Bridge Railing (Four-Rail) (568.51) | LF | 197 | $332.00 | $350.00 | $350.00 |
| 41 | Transition Bridge Railing (568.70) | LF | 503 | $202.00 | $212.00 | $215.00 |
| 42 | (595.50000018) | 7,879 | $6.00 | $9.00 | $6.00 | |
| 43 | (603.171316) | EACH | 1 | $385.00 | $544.00 | $1,100.00 |
| 44 | (603.171416) | EACH | 6 | $440.00 | $606.00 | $1,400.00 |
| 45 | (603.63140515) | 36 | $4,450.00 | $4,200.00 | $5,500.00 | |
| 46 | (603.63150515) | 61 | $4,500.00 | $5,150.00 | $6,500.00 | |
| 47 | (603.63181015) | 38 | $5,250.00 | $5,700.00 | $6,000.00 | |
| 48 | (603.64141015) | 64 | $3,410.00 | $4,150.00 | $3,500.00 | |
| 49 | (603.64150515) | 46 | $3,870.00 | $3,950.00 | $4,800.00 | |
| 50 | (603.67000001) | 77 | $1,875.00 | $4,000.00 | $2,000.00 | |
| 51 | (603.9818) | LF | 139 | $48.00 | $62.00 | $80.00 |
| 52 | (604.4048) | LF | 9 | $922.84 | $590.00 | $1,200.00 |
| 53 | (605.16020008) | 40 | $34.00 | $23.00 | $150.00 | |
| 54 | Box Beam Guide Railing (606.10) | LF | 861 | $51.00 | $54.00 | $55.00 |
| 55 | Box Beam End Piece (606.120101) | EACH | 1 | $640.00 | $670.00 | $700.00 |
| 56 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 10 | $4,280.00 | $4,500.00 | $4,750.00 |
| 57 | Box Beam Guide Railing End Assembly Type I with 18 ft Extension (606.120103) | EACH | 1 | $5,245.00 | $5,500.00 | $5,800.00 |
| 58 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 5 | $2,080.00 | $2,200.00 | $2,500.00 |
| 59 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 100 | $29.50 | $7.00 | $12.00 |
| 60 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 1,072 | $8.00 | $7.00 | $12.00 |
| 61 | Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910) | EACH | 4 | $275.00 | $350.00 | $1,500.00 |
| 62 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 13 | $192.00 | $170.00 | $400.00 |
| 63 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 1 | $95.00 | $95.00 | $95.00 |
| 64 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 30 | $328.00 | $655.00 | $490.00 |
| 65 | Turf Establishment – Performance (610.1605) | SY | 2,429 | $18.00 | $35.00 | $24.00 |
| 66 | (613.04000001) | 318 | $88.50 | $200.00 | $95.00 | |
| 67 | (613.70000008) | 730 | $14.00 | $11.00 | $15.00 | |
| 68 | (614.060201) | EACH | 1 | $1,367.00 | $1,050.00 | $1,500.00 |
| 69 | (614.060203) | EACH | 4 | $1,806.95 | $1,450.00 | $1,800.00 |
| 70 | (614.060301) | EACH | 1 | $1,915.00 | $2,050.00 | $2,200.00 |
| 71 | (615.01010108) | 86 | $198.00 | $260.00 | $100.00 | |
| 72 | (617.10000024) | 252 | $60.00 | $72.00 | $70.00 | |
| 73 | (617.11000024) | LS | 1 | $2,865.00 | $2,300.00 | $2,500.00 |
| 74 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $130,132 | $274,000 | $500,000 |
| 75 | Type III Construction Barricades (619.04) | EACH | 110 | $182.00 | $120.00 | $100.00 |
| 76 | (619.100101) | LF | 3,854 | $2.00 | $2.50 | $2.00 |
| 77 | (619.110611) | WEEK | 20 | $1,060.00 | $950.00 | $1,000.00 |
| 78 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 400 | $60.00 | $20.00 | $95.00 |
| 79 | Mailboxes (619.27) | EACH | 2 | $675.00 | $440.00 | $600.00 |
| 80 | Stone Filling (Light) (620.03) | CY | 55 | $121.00 | $160.00 | $140.00 |
| 81 | Stone Filling (Medium) (620.04) | CY | 511 | $178.00 | $170.00 | $150.00 |
| 82 | Stone Filling (Heavy) (620.05) | CY | 437 | $214.00 | $185.00 | $170.00 |
| 83 | Bedding Material, Type 1 (620.0801) | CY | 91 | $103.00 | $150.00 | $125.00 |
| 84 | Bedding Material, Type 2 (620.0802) | CY | 34 | $110.00 | $170.00 | $125.00 |
| 85 | Crushed Stone (In-Place Measure) (623.12) | CY | 239 | $104.00 | $200.00 | $225.00 |
| 86 | Survey Operations (625.01) | LS | 1 | $45,500 | $117,000 | $150,000 |
| 87 | Concrete Right of Way Markers Type L (Low) (625.04) | EACH | 2 | $1,105.00 | $3,400.00 | $1,500.00 |
| 88 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 4 | $550.00 | $1,350.00 | $1,800.00 |
| 89 | (625.07070004) | 2 | $128.00 | $150.00 | $1,000.00 | |
| 90 | (625.09010015) | LS | 1 | $5,750.00 | $8,300.00 | $15,000 |
| 91 | (627.50140008) | 553 | $2.75 | $15.00 | $9.00 | |
| 92 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $3,200.00 | $3,800.00 | $2,000.00 |
| 93 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 30 | $2,200.00 | $2,700.00 | $3,000.00 |
| 94 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 27 | $16.00 | $11.00 | $25.00 |
| 95 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 10 | $21.50 | $23.00 | $25.00 |
| 96 | Reference Marker, Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels Relocation (646.24) | EACH | 1 | $27.25 | $11.00 | $30.00 |
| 97 | Steel Post, 2.0 lb/ft (646.32) | EACH | 28 | $85.75 | $75.00 | $100.00 |
| 98 | Brackets for Barrier and Multidirectional Mounting (646.50) | EACH | 1 | $85.75 | $115.00 | $100.00 |
| 99 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 4 | $39.00 | $123.00 | $20.00 |
| 100 | (647.83001002) | 17 | $11.00 | $36.00 | $20.00 | |
| 101 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 845 | $21.00 | $19.00 | $25.00 |
| 102 | Manhole Frame & Grate (655.1201) | EACH | 1 | $620.00 | $1,160.00 | $2,500.00 |
| 103 | (663.0408) | LF | 160 | $165.00 | $440.00 | $350.00 |
| 104 | (663.160808) | EACH | 2 | $9,800.00 | $17,000 | $16,000 |
| 105 | (663.1808) | EACH | 2 | $485.00 | $470.00 | $5,200.00 |
| 106 | Iron Water Main Fittings (3 - 8 inch diameter) (663.2001) | LB | 44 | $43.00 | $50.00 | $80.00 |
| 107 | (663.2108) | EACH | 6 | $121.00 | $160.00 | $250.00 |
| 108 | Disconnect and Cap Existing Water Main (663.40) | EACH | 4 | $332.00 | $4,400.00 | $6,000.00 |
| 109 | (663.4108) | LF | 53 | $35.50 | $32.00 | $100.00 |
| 110 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 2,748 | $6.00 | $5.00 | $4.00 |
| 111 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 1,109 | $14.75 | $5.00 | $4.00 |
| 112 | Field Change Payment (FCP) (697.03) | DOL | 237,000 | $1.00 | $1.00 | $1.00 |
| 113 | Asphalt Price Adjustment (698.04) | DOL | 2,101 | $1.00 | $1.00 | $1.00 |
| 114 | Fuel Price Adjustment (698.05) | DOL | 2,874 | $1.00 | $1.00 | $1.00 |
| 115 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 116 | Mobilization (699.040001) | LS | 1 | $64,000 | $228,000 | $240,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of December 18, 2025. Compiled by Mirage Metrics.