NYSDOT contract D265627 bid tabulation
PAVEMENT RESURFACING - NYS Route 286. Let by New York State DOT on January 8, 2026, Monroe, Region 04. 3 bids received; low bid $10,986,794 by Keeler Construction Co Inc.
- Owner
- New York State DOT
- Letting
- 08 JAN 2026
- Pay items
- 243
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Keeler Construction Co Inc | $10,986,794 | Low |
| 2 | Sealand Contractors Corp. | $11,662,001 | +6.0% |
| 3 | Cold Spring Construction Company | $12,868,503 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Keeler Construction Co Inc | 2. Sealand Contractors Corp. | 3. Cold Spring Construction Company |
|---|---|---|---|---|---|---|
| 1 | (201.07000004) | 10,380 | $7.00 | $8.00 | $7.00 | |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 5,275 | $63.00 | $67.00 | $45.00 |
| 3 | Embankment In Place (203.03) | CY | 87 | $126.00 | $75.00 | $5.00 |
| 4 | Select Granular Fill (203.07) | CY | 681 | $164.00 | $85.00 | $45.00 |
| 5 | (203.24010017) | 110 | $142.00 | $130.00 | $110.00 | |
| 6 | Trench and Culvert Excavation (206.0201) | CY | 1,653 | $86.00 | $60.00 | $105.00 |
| 7 | (206.03050005) | 85 | $184.00 | $89.00 | $275.00 | |
| 8 | (206.03060005) | 843 | $68.00 | $51.00 | $50.00 | |
| 9 | Test Pit Excavation (206.05) | EACH | 6 | $2,600.00 | $2,100.00 | $4,500.00 |
| 10 | Seed and Mulch – Temporary (209.1003) | SY | 5,667 | $1.50 | $1.56 | $2.25 |
| 11 | Sediment Filter Log, 12″ (209.2301) | LF | 3,043 | $12.00 | $9.00 | $6.50 |
| 12 | Subbase Course, Type 2 (304.12) | CY | 2,970 | $185.00 | $115.00 | $135.00 |
| 13 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 354 | $105.00 | $105.00 | $105.00 |
| 14 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 393 | $105.00 | $105.00 | $105.00 |
| 15 | (404.0189) | TON | 300 | $180.00 | $190.00 | $160.00 |
| 16 | (404.1989) | TON | 467 | $195.00 | $205.00 | $260.00 |
| 17 | (404.3789) | TON | 1,139 | $141.00 | $165.00 | $245.00 |
| 18 | (406.0962) | TON | 11,098 | $157.00 | $133.00 | $148.00 |
| 19 | (407.01040009) | 6,927 | $8.00 | $11.50 | $15.00 | |
| 20 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 51,871 | $0.29 | $1.10 | $0.01 |
| 21 | Production Cold-Mill Surface Planing of Bituminous Concrete (490.15) | SY | 91,625 | $2.70 | $3.40 | $5.00 |
| 22 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 3,031 | $19.00 | $14.00 | $29.00 |
| 23 | (502.22120018) | 4 | $2,625.00 | $6,000.00 | $2,900.00 | |
| 24 | PCC Foundation for Pavement, PEM Concrete (503.1013) | CY | 123 | $730.00 | $1,200.00 | $825.00 |
| 25 | Shields and Shoring (552.17) | SF | 12,486 | $0.10 | $1.00 | $0.01 |
| 26 | (555.10000006) | 4 | $1,300.00 | $2,500.00 | $1,450.00 | |
| 27 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 1,000 | $7.00 | $6.00 | $9.00 |
| 28 | (557.26000016) | 1,591 | $59.00 | $34.00 | $62.00 | |
| 29 | Transition Bridge Railing (568.70) | LF | 184 | $184.00 | $179.00 | $180.00 |
| 30 | Removal and Replacement of Structural Concrete (582.0051) | CY | 59 | $6,050.00 | $10,000 | $5,000.00 |
| 31 | (602.3630) | LF | 100 | $575.00 | $540.00 | $560.00 |
| 32 | (603.171216) | EACH | 9 | $1,200.00 | $1,400.00 | $700.00 |
| 33 | (603.171614) | EACH | 4 | $1,700.00 | $1,800.00 | $1,400.00 |
| 34 | (603.171814) | EACH | 1 | $2,700.00 | $2,100.00 | $1,700.00 |
| 35 | (603.172012) | EACH | 1 | $4,800.00 | $4,800.00 | $2,300.00 |
| 36 | Concrete Collars (603.77) | EACH | 1 | $3,100.00 | $5,000.00 | $4,200.00 |
| 37 | (603.9812) | LF | 116 | $100.00 | $110.00 | $220.00 |
| 38 | (603.9815) | LF | 1,183 | $78.00 | $120.00 | $130.00 |
| 39 | (603.99050002) | 2 | $1,400.00 | $1,500.00 | $1,400.00 | |
| 40 | (604.070401) | EACH | 16 | $3,700.00 | $6,000.00 | $3,300.00 |
| 41 | (604.070402) | EACH | 9 | $4,800.00 | $7,000.00 | $5,500.00 |
| 42 | (604.070403) | EACH | 14 | $3,400.00 | $5,000.00 | $5,000.00 |
| 43 | (604.13000011) | 2 | $2,600.00 | $1,200.00 | $1,800.00 | |
| 44 | (604.301611) | LF | 7 | $2,300.00 | $3,100.00 | $825.00 |
| 45 | (604.301911) | LF | 88 | $1,500.00 | $1,600.00 | $775.00 |
| 46 | (604.302122) | LF | 26 | $1,300.00 | $1,350.00 | $775.00 |
| 47 | Underdrain Filter, Type I (605.0901) | CY | 64 | $180.00 | $130.00 | $450.00 |
| 48 | (605.1701) | LF | 983 | $3.00 | $14.00 | $4.00 |
| 49 | Box Beam Guide Railing (606.10) | LF | 399 | $50.00 | $49.00 | $53.00 |
| 50 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 39 | $74.00 | $72.00 | $55.00 |
| 51 | Box Beam End Piece (606.120101) | EACH | 1 | $875.00 | $850.00 | $600.00 |
| 52 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 2 | $4,400.00 | $4,200.00 | $4,200.00 |
| 53 | HPBO (Mod.) Corrugated Beam Guide Railing (606.2701) | LF | 8,108 | $33.00 | $32.00 | $30.00 |
| 54 | HPBO (Mod.) Corrugated Beam Median Barrier End Terminal (Energy-Absorbing) (606.28) | EACH | 8 | $11,000 | $10,500 | $10,500 |
| 55 | HPBO (Mod.) Corrugated Beam Median Barrier (606.2801) | LF | 2,968 | $44.00 | $42.00 | $51.00 |
| 56 | Resetting Box Beam Guide Railing (606.53) | LF | 910 | $22.00 | $25.25 | $35.00 |
| 57 | Removing and Storing Box Beam Guide Railing (606.63) | LF | 359 | $15.00 | $4.50 | $7.00 |
| 58 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 1,079 | $7.00 | $4.25 | $7.00 |
| 59 | Removing and Disposing Corrugated Beam Median Barrier (606.72) | LF | 3,049 | $7.00 | $4.25 | $7.00 |
| 60 | Removing and Disposing HPBO (Mod.) Corrugated Beam Median Barrier (606.7201) | LF | 582 | $9.00 | $4.25 | $7.00 |
| 61 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 90 | $15.00 | $4.25 | $10.00 |
| 62 | Removing and Disposing Box Beam Median Barrier (606.74) | LF | 1,266 | $13.00 | $4.25 | $7.00 |
| 63 | Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910) | EACH | 3 | $700.00 | $500.00 | $300.00 |
| 64 | Removing and Disposing Weak- and Heavy-Post Corrugated Beam Energy-Absorbing Terminals (606.7911) | EACH | 1 | $700.00 | $500.00 | $300.00 |
| 65 | Removing and Disposing Box Beam Energy-Absorbing Terminal (606.7921) | EACH | 4 | $1,300.00 | $900.00 | $600.00 |
| 66 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 1 | $105.00 | $105.00 | $105.00 |
| 67 | Concrete Sidewalks and Driveways (608.0101) | CY | 243 | $1,370.00 | $1,620.00 | $1,750.00 |
| 68 | Accelerated Cure Sidewalks and Driveways (608.0102) | CY | 24 | $1,460.00 | $1,620.00 | $2,100.00 |
| 69 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 1,243 | $280.00 | $180.00 | $250.00 |
| 70 | (608.21000003) | 45 | $490.00 | $540.00 | $450.00 | |
| 71 | Stone Curb – Near Vertical Face (NVF) (609.0212) | LF | 2,749 | $52.00 | $80.00 | $85.00 |
| 72 | Cast-in-Place Concrete Curb (As Detailed) (609.04) | LF | 281 | $66.00 | $190.00 | $84.00 |
| 73 | (609.0401) | LF | 40 | $330.00 | $220.00 | $360.00 |
| 74 | (609.10010404) | 650 | $47.00 | $15.00 | $225.00 | |
| 75 | Topsoil - Roadside (610.1402) | CY | 80 | $180.00 | $130.00 | $280.00 |
| 76 | Turf Establishment – Performance (610.1605) | SY | 5,667 | $16.00 | $16.50 | $22.00 |
| 77 | (614.060204) | EACH | 16 | $800.00 | $1,000.00 | $900.00 |
| 78 | (614.060304) | EACH | 4 | $1,400.00 | $1,800.00 | $1,500.00 |
| 79 | (614.060404) | EACH | 1 | $1,900.00 | $2,400.00 | $2,750.00 |
| 80 | (614.060504) | EACH | 2 | $2,700.00 | $3,400.00 | $3,000.00 |
| 81 | (617.10000024) | 585 | $117.00 | $104.00 | $180.00 | |
| 82 | (617.11000024) | LS | 1 | $600.00 | $6,000.00 | $1,000.00 |
| 83 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $895,000 | $1,464,643 | $2,000,000 |
| 84 | (619.0901) | LF | 48,414 | $0.26 | $0.26 | $0.25 |
| 85 | (619.111211) | WEEK | 4 | $1,000.00 | $1,200.00 | $850.00 |
| 86 | (619.111222) | WEEK | 18 | $1,000.00 | $1,200.00 | $850.00 |
| 87 | Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613) | MONTH | 90 | $195.00 | $340.00 | $400.00 |
| 88 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $48,000 | $100,000 | $180,000 |
| 89 | Mailboxes (619.27) | EACH | 13 | $400.00 | $350.00 | $325.00 |
| 90 | Stone Filling (Light) (620.03) | CY | 202 | $254.00 | $175.00 | $325.00 |
| 91 | Bedding Material, Type 1 (620.0801) | CY | 68 | $366.00 | $155.00 | $225.00 |
| 92 | Cleaning Culverts with Span of 50 in. or Less (621.01) | LF | 734 | $22.00 | $8.70 | $44.00 |
| 93 | Cleaning Culverts with Span of More Than 50 in. (621.02) | LF | 358 | $113.00 | $148.00 | $125.00 |
| 94 | Cleaning Closed Drainage Systems (621.03) | LF | 8,319 | $8.70 | $6.70 | $5.00 |
| 95 | Cleaning Drainage Structures (621.04) | EACH | 107 | $180.00 | $225.00 | $275.00 |
| 96 | Clean, Grade and Shape Existing Roadside Section (621.05) | LF | 1,384 | $22.00 | $13.00 | $8.00 |
| 97 | (621.51000015) | 319 | $57.00 | $19.00 | $12.00 | |
| 98 | (621.51950006) | 1,958 | $27.00 | $6.00 | $14.00 | |
| 99 | (624.0109) | SF | 20 | $164.00 | $300.00 | $180.00 |
| 100 | Asphalt Gutter (624.020101) | TON | 6 | $1,635.00 | $600.00 | $750.00 |
| 101 | Plant Production Quality Adjustment to 624.020101 (624.020110) | QUALITY UNIT | 1 | $105.00 | $105.00 | $105.00 |
| 102 | (624.02890001) | 871 | $18.00 | $13.00 | $7.00 | |
| 103 | Survey Operations (625.01) | LS | 1 | $60,000 | $68,000 | $130,000 |
| 104 | Concrete Right of Way Markers Type L (Low) (625.04) | EACH | 6 | $1,700.00 | $1,600.00 | $1,400.00 |
| 105 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 19 | $195.00 | $370.00 | $250.00 |
| 106 | (627.50140008) | 11,812 | $11.00 | $6.50 | $8.00 | |
| 107 | Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403) | SY | 80 | $160.00 | $170.00 | $300.00 |
| 108 | Stress Relieving Pavement Repairs (633.16) | SY | 240 | $240.00 | $170.00 | $330.00 |
| 109 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $1,900.00 | $10,000 | $350.00 |
| 110 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 18 | $2,800.00 | $2,400.00 | $2,800.00 |
| 111 | Office Technology and Supplies (637.34) | DOL | 1,000 | $1.00 | $1.00 | $1.00 |
| 112 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 113 | (640.11020004) | 7,890 | $2.10 | $2.00 | $2.05 | |
| 114 | (640.12020004) | 4,816 | $2.10 | $2.00 | $2.05 | |
| 115 | White Paint Reflectorized Pavement Stripes – 20 mils (640.20) | LF | 21,616 | $0.25 | $0.26 | $0.26 |
| 116 | Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21) | LF | 25,285 | $0.25 | $0.26 | $0.26 |
| 117 | White Paint Reflectorized Pavement Symbols - 20 mils (640.23) | EACH | 17 | $110.00 | $105.00 | $105.00 |
| 118 | (642.31610008) | 3,200 | $2.00 | $1.85 | $1.80 | |
| 119 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 1,130 | $38.00 | $37.00 | $38.00 |
| 120 | Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103) | SF | 62 | $33.00 | $32.00 | $40.00 |
| 121 | Overhead Sign Panels (645.61) | SF | 107 | $80.00 | $170.00 | $71.00 |
| 122 | Type A Sign Posts (645.81) | EACH | 147 | $208.00 | $200.00 | $210.00 |
| 123 | Type A Sign Posts with Extra Embedment (645.8104) | EACH | 10 | $330.00 | $315.00 | $245.00 |
| 124 | High-Capacity Type A Sign Posts with Soil Plates Only (645.8106) | EACH | 6 | $1,300.00 | $1,260.00 | $1,250.00 |
| 125 | Breakaway Wooden Sign Posts (645.82) | EACH | 5 | $500.00 | $350.00 | $675.00 |
| 126 | Reference Marker Panel (646.21) | EACH | 38 | $33.00 | $32.00 | $33.00 |
| 127 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 94 | $11.00 | $11.00 | $12.00 |
| 128 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 76 | $22.00 | $21.00 | $17.00 |
| 129 | Steel Post, 2.0 lb/ft (646.32) | EACH | 173 | $71.00 | $68.00 | $73.00 |
| 130 | Brackets for Barrier and Multidirectional Mounting (646.50) | EACH | 35 | $109.00 | $105.00 | $71.00 |
| 131 | Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41) | EACH | 4 | $120.00 | $116.00 | $7.00 |
| 132 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 132 | $66.00 | $63.00 | $7.00 |
| 133 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62) | EACH | 2 | $330.00 | $315.00 | $13.00 |
| 134 | (647.83001002) | 38 | $27.00 | $27.00 | $5.25 | |
| 135 | Milled-In Audible Roadway Delineators (MIARDs) (649.01) | LF | 11,400 | $1.10 | $0.64 | $0.42 |
| 136 | Secondary Highway Audible Roadway Delineators (SHARDs) (649.21) | LF | 11,793 | $1.10 | $0.64 | $0.42 |
| 137 | Pavement Ride Quality Adjustment to Asphalt Level 2 (653.1020) | QUALITY UNIT | 116 | $105.00 | $105.00 | $105.00 |
| 138 | Welded Frame & Reticuline Grate 11 (655.1111) | EACH | 93 | $1,900.00 | $4,500.00 | $2,500.00 |
| 139 | Welded Frame & Reticuline Grate 22 (655.1122) | EACH | 7 | $1,800.00 | $3,500.00 | $1,600.00 |
| 140 | Manhole Frame & Cover (655.1202) | EACH | 4 | $800.00 | $2,000.00 | $1,150.00 |
| 141 | (662.60010004) | 5,000 | $1.00 | $1.00 | $1.00 | |
| 142 | (662.60030008) | 15 | $1,800.00 | $1,300.00 | $1,300.00 | |
| 143 | (663.0108) | LF | 233 | $160.00 | $195.00 | $260.00 |
| 144 | (663.1008) | EACH | 2 | $3,500.00 | $4,000.00 | $4,000.00 |
| 145 | (663.160808) | EACH | 1 | $13,500 | $10,000 | $8,500.00 |
| 146 | Iron Water Main Fittings (3 - 8 inch diameter) (663.2001) | LB | 689 | $16.00 | $22.00 | $30.00 |
| 147 | (663.2108) | EACH | 21 | $127.00 | $200.00 | $80.00 |
| 148 | (663.2308) | LF | 233 | $7.00 | $4.00 | $10.00 |
| 149 | (663.240803) | 233 | $130.00 | $160.00 | $125.00 | |
| 150 | Adjust Existing Valve Box Elevation (663.33) | EACH | 8 | $1,800.00 | $1,200.00 | $1,050.00 |
| 151 | Disconnect and Cap Existing Water Main (663.40) | EACH | 4 | $3,550.00 | $2,000.00 | $2,500.00 |
| 152 | (663.4108) | LF | 131 | $90.00 | $50.00 | $90.00 |
| 153 | (670.0106) | EACH | 2 | $5,300.00 | $5,050.00 | $8,000.00 |
| 154 | (670.1130) | EACH | 2 | $5,400.00 | $2,070.00 | $3,500.00 |
| 155 | (670.1315) | EACH | 2 | $730.00 | $1,075.00 | $3,000.00 |
| 156 | (670.1418) | EACH | 2 | $2,450.00 | $1,200.00 | $4,000.00 |
| 157 | Breakaway Transformer Base (Aluminum) (670.19) | EACH | 2 | $1,300.00 | $1,400.00 | $2,000.00 |
| 158 | (670.2602) | LF | 46 | $22.00 | $7.50 | $23.00 |
| 159 | (670.7004) | LF | 306 | $9.00 | $4.00 | $4.00 |
| 160 | (670.7006) | LF | 192 | $5.00 | $2.10 | $5.00 |
| 161 | (670.75050011) | 102 | $9.00 | $4.75 | $6.25 | |
| 162 | (670.75070011) | 96 | $5.00 | $2.10 | $5.75 | |
| 163 | (670.77000105) | 2 | $900.00 | $185.00 | $5,000.00 | |
| 164 | (670.77000205) | 4 | $500.00 | $205.00 | $1,000.00 | |
| 165 | (670.98000705) | 2 | $78.00 | $14,200 | $1,000.00 | |
| 166 | Performance Concrete Quality Adjustment (670.99) | QUALITY UNIT | 1 | $17.91 | $17.91 | $17.91 |
| 167 | (680.05010007) | 4 | $25,000 | $27,600 | $30,000 | |
| 168 | (680.05020007) | 2 | $5,000.00 | $5,400.00 | $6,000.00 | |
| 169 | (680.05040004) | 9 | $4,300.00 | $3,800.00 | $5,000.00 | |
| 170 | Pole Excavation and Concrete Foundation (680.5001) | CY | 35 | $3,000.00 | $4,000.00 | $2,650.00 |
| 171 | Concrete Base for Controller Cabinet (680.5002) | EACH | 4 | $3,800.00 | $3,300.00 | $5,000.00 |
| 172 | Concrete Work Pad (5 feet x 5 feet x 4 inches) (680.5003) | EACH | 4 | $700.00 | $730.00 | $3,500.00 |
| 173 | (680.51030009) | 1 | $750.00 | $870.00 | $2,700.00 | |
| 174 | (680.510301) | EACH | 6 | $2,200.00 | $2,250.00 | $3,500.00 |
| 175 | (680.510401) | EACH | 2 | $3,300.00 | $2,520.00 | $4,000.00 |
| 176 | (680.51100010) | 10 | $380.00 | $240.00 | $475.00 | |
| 177 | (680.520106) | LF | 187 | $41.00 | $18.00 | $55.00 |
| 178 | (680.520510) | LF | 141 | $66.00 | $40.50 | $22.00 |
| 179 | (680.520706) | LF | 523 | $31.00 | $8.30 | $17.00 |
| 180 | (680.520708) | LF | 100 | $32.00 | $28.00 | $27.00 |
| 181 | Trenchless Installation Method for Conduit (680.5301) | LF | 807 | $92.00 | $100.00 | $120.00 |
| 182 | (680.621856) | EACH | 1 | $27,000 | $31,000 | $30,000 |
| 183 | (680.622044) | EACH | 1 | $19,000 | $18,800 | $22,000 |
| 184 | (680.622046) | EACH | 2 | $19,000 | $19,000 | $22,000 |
| 185 | (680.622054) | EACH | 1 | $28,000 | $31,000 | $30,000 |
| 186 | (680.632038) | EACH | 1 | $26,000 | $27,000 | $30,000 |
| 187 | (680.6708) | EACH | 20 | $1,600.00 | $1,360.00 | $1,500.00 |
| 188 | Single Span Wire Assembly (680.7001) | EACH | 2 | $5,900.00 | $2,500.00 | $5,000.00 |
| 189 | Dual Span Wire Assembly with Upper Tether Wire (680.7002) | EACH | 1 | $9,900.00 | $5,320.00 | $10,000 |
| 190 | Riser Assembly, 2-inch Diameter (680.700606) | EACH | 3 | $1,100.00 | $580.00 | $2,500.00 |
| 191 | (680.730514) | LF | 8,975 | $4.75 | $4.15 | $3.00 |
| 192 | (680.730714) | LF | 385 | $7.75 | $6.50 | $9.00 |
| 193 | (680.78010005) | 10 | $600.00 | $240.00 | $500.00 | |
| 194 | (680.78100108) | LS | 1 | $13,000 | $9,200.00 | $12,000 |
| 195 | (680.78100208) | LS | 1 | $2,800.00 | $2,800.00 | $12,000 |
| 196 | (680.78100308) | LS | 1 | $9,900.00 | $9,600.00 | $12,000 |
| 197 | (680.78100408) | LS | 1 | $2,600.00 | $2,900.00 | $12,000 |
| 198 | (680.78100508) | LS | 1 | $14,000 | $9,900.00 | $12,000 |
| 199 | (680.78100608) | LS | 1 | $6,900.00 | $2,750.00 | $12,000 |
| 200 | (680.78100708) | LS | 1 | $10,500 | $3,150.00 | $12,000 |
| 201 | (680.80324515) | 4 | $1,700.00 | $1,920.00 | $4,500.00 | |
| 202 | (680.80324603) | 4 | $1,280.00 | $1,250.00 | $2,800.00 | |
| 203 | (680.80620215) | 1 | $3,600.00 | $3,530.00 | $3,300.00 | |
| 204 | Traffic Signal Module - 12-inch, Red Ball, LED (680.810101) | EACH | 35 | $70.00 | $98.00 | $450.00 |
| 205 | Traffic Signal Module - 12-inch, Red Arrow, LED (680.810102) | EACH | 3 | $75.00 | $108.00 | $450.00 |
| 206 | Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103) | EACH | 36 | $70.00 | $98.00 | $450.00 |
| 207 | Traffic Signal Module - 12-inch, Yellow Arrow, LED (680.810104) | EACH | 8 | $75.00 | $108.00 | $450.00 |
| 208 | Traffic Signal Module - 12-inch, Green Ball, LED (680.810105) | EACH | 32 | $70.00 | $98.00 | $450.00 |
| 209 | Traffic Signal Module - 12-inch, Green Arrow, LED (680.810106) | EACH | 3 | $75.00 | $108.00 | $450.00 |
| 210 | Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601) | EACH | 117 | $350.00 | $235.00 | $225.00 |
| 211 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 7 | $600.00 | $480.00 | $2,250.00 |
| 212 | Traffic Signal Bracket Assembly - 2 Way (680.8112) | EACH | 9 | $1,500.00 | $685.00 | $2,500.00 |
| 213 | (680.81210004) | 16 | $600.00 | $510.00 | $650.00 | |
| 214 | Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105) | EACH | 22 | $160.00 | $210.00 | $350.00 |
| 215 | Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106) | EACH | 44 | $700.00 | $290.00 | $300.00 |
| 216 | Pedestrian Signal Bracket Mount Assembly (680.8141) | EACH | 3 | $650.00 | $425.00 | $550.00 |
| 217 | Pedestrian Signal Post Top Mount Assembly (680.8142) | EACH | 19 | $500.00 | $320.00 | $525.00 |
| 218 | Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001) | EACH | 22 | $200.00 | $250.00 | $350.00 |
| 219 | (680.8151) | EACH | 22 | $1,200.00 | $1,210.00 | $1,500.00 |
| 220 | Backplates for Traffic Signal Heads (680.8199) | EACH | 42 | $450.00 | $315.00 | $425.00 |
| 221 | (680.8201) | EACH | 8 | $1,300.00 | $1,250.00 | $1,400.00 |
| 222 | (680.8205) | EACH | 2 | $800.00 | $705.00 | $1,300.00 |
| 223 | (680.8206) | EACH | 2 | $1,500.00 | $1,290.00 | $1,600.00 |
| 224 | Meter Pan (680.9402) | EACH | 4 | $1,500.00 | $2,270.00 | $3,250.00 |
| 225 | (680.94400008) | 2 | $4,000.00 | $5,400.00 | $7,250.00 | |
| 226 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 5 | $400.00 | $605.00 | $1,400.00 |
| 227 | (680.950106) | LF | 1,665 | $4.45 | $2.80 | $8.75 |
| 228 | (680.96030404) | 1 | $3,200.00 | $1,050.00 | $5,000.00 | |
| 229 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $10.00 | $10.00 | $10.00 |
| 230 | (683.92201208) | 1,313 | $3.10 | $3.00 | $8.00 | |
| 231 | (683.94000304) | 1,654 | $10.00 | $7.35 | $4.25 | |
| 232 | (683.95060104) | 2 | $300.00 | $2,500.00 | $3,500.00 | |
| 233 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 21,616 | $0.55 | $0.52 | $0.53 |
| 234 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 25,285 | $0.55 | $0.52 | $0.53 |
| 235 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 7,890 | $3.00 | $2.90 | $3.00 |
| 236 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 4,816 | $3.00 | $2.90 | $3.00 |
| 237 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 17 | $275.00 | $265.00 | $275.00 |
| 238 | (691.04000020) | 49,000 | $1.00 | $1.00 | $1.00 | |
| 239 | Field Change Payment (FCP) (697.03) | DOL | 400,000 | $1.00 | $1.00 | $1.00 |
| 240 | Asphalt Price Adjustment (698.04) | DOL | 15,454 | $1.00 | $1.00 | $1.00 |
| 241 | Fuel Price Adjustment (698.05) | DOL | 3,845 | $1.00 | $1.00 | $1.00 |
| 242 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 243 | Mobilization (699.040001) | LS | 1 | $422,000 | $448,000 | $494,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of January 8, 2026. Compiled by Mirage Metrics.