Seneca Stone Corp: NYSDOT bid record
Seneca Stone Corp submitted 13 bids on New York State DOT contracts in the data, from 20 JAN 2022 to 04 JUN 2026, and was the low bidder on 3 of them (23%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $13,402,602
- Latest bid
- 04 JUN 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 3 | 0 | 0% |
| 2023 | 3 | 0 | 0% |
| 2024 | 2 | 1 | 50% |
| 2025 | 1 | 0 | 0% |
| 2026 | 4 | 2 | 50% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 03 | 8 | 1 | 13% |
| Region 04 | 4 | 1 | 25% |
| Region 03, 04 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 13 | 13 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 13 | 13 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 13 | 13 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 13 | 13 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 13 | 13 (100%) | $1.00 | $1.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 13 | 13 (100%) | $1.00 | $1.00 |
| Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.000013 | QUALITY UNIT | 7 | 7 (100%) | $70.00 | $90.00 |
| Asphalt Pavement Joint Adhesive | 418.7603 | LF | 13 | 6 (46%) | $0.50 | $1.00 |
| 691.04000020 | 6 | 6 (100%) | $1.00 | $1.00 | ||
| Plant Production Quality Adjustment to Asphalt Items | 404.000011 | QUALITY UNIT | 6 | 6 (100%) | $85.00 | $85.00 |
| Partnering Workshop | 637.35 | DOL | 5 | 5 (100%) | $1.00 | $1.00 |
| Longitudinal Joint Density Quality Adjustment to Asphalt Items | 404.000031 | QUALITY UNIT | 5 | 5 (100%) | $85.00 | $85.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Sealand Contractors Corp. | 11 | 4 of 11 |
| Barrett Paving Materials Inc | 7 | 5 of 7 |
| Villager Construction Inc | 6 | 1 of 6 |
| Cold Spring Construction Company | 4 | 1 of 4 |
| Keeler Construction Co Inc | 3 | 2 of 3 |
| Suit-Kote Corporation | 3 | 2 of 3 |
| Rifenburg Construction Inc | 3 | 1 of 3 |
| Lancaster Development and Tully Construction Co LLC | 2 | 1 of 2 |
| Ramsey Constructors Inc | 1 | 0 of 1 |
| Bothar Construction LLC | 1 | 1 of 1 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 JUN 2026 | D265779 | Region 03 | PAVEMENT REHABILITATION - Routes NY-5 & US-20 | 4 of 5 | $24,400,000 | +20% |
| 07 MAY 2026 | D265767 | Region 03 | RESURFACING - Route 931G & Route 370 | 2 of 2 | $6,040,000 | +57% |
| 09 APR 2026 | D265755 | Region 04 | Route 14 from Route 31 to Former Village of Lyons North Line | 1 of 3 | $4,720,000 | Low, 30% under the second |
| 05 MAR 2026 | D265747 | Region 03 | PAVEMENT RESURFACING - Route 5 Bypass | 1 of 3 | $7,282,602 | Low, 10% under the second |
| 23 OCT 2025 | D265580 | Region 03 | HIGHWAY MILL & FILL - Rts I-81, SH 54-3, SH 57-6 & SH 57-8 | 3 of 3 | $13,100,000 | +17% |
| 24 OCT 2024 | D265327 | Region 03 | MAINTENANCE BY CONTRACT, PAVEMENT & SLOPE REPAIR | 2 of 4 | $23,280,000 | +19% |
| 11 JAN 2024 | D265166 | Region 03, 04 | RESURFACING - NY Rte. 5 & US Rte. 20 | 1 of 6 | $1,400,000 | Low, 3.0% under the second |
| 14 DEC 2023 | D265115 | Region 04 | ROUTES 5 & 20 CULVERT IMPROVEMENTS | 2 of 3 | $1,970,000 | +8.0% |
| 29 JUN 2023 | D265023 | Region 03 | INTERSECTION IMPROVEMENTS, Route 31, Town Of Cicero. | 8 of 10 | $10,380,000 | +24% |
| 18 MAY 2023 | D265025 | Region 04 | Route 31 from Wayne/Monroe County Line to Hamlet of Macedon | 2 of 5 | $4,980,000 | +1.0% |
| 19 MAY 2022 | D264808 | Region 03 | ROUTE 96A MBC, TOWNS OF FAYETTE & WATERLOO | 2 of 5 | $7,380,000 | +3.0% |
| 10 MAR 2022 | D264715 | Region 03 | MBC - ROUTE 366, EAST OF HOY RD. TO RTE. 13/366 INTERCHANGE | 5 of 5 | $6,700,460 | +54% |
| 20 JAN 2022 | D264701 | Region 04 | Pavement Resurfacing and Signal Improvements: Route 104. | 3 of 7 | $8,685,000 | +12% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.