NYSDOT contract D265755 bid tabulation
Route 14 from Route 31 to Former Village of Lyons North Line. Let by New York State DOT on April 9, 2026, Wayne, Region 04. 3 bids received; low bid $4,720,000 by Seneca Stone Corp.
- Owner
- New York State DOT
- Letting
- 09 APR 2026
- Pay items
- 156
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Seneca Stone Corp | $4,720,000 | Low |
| 2 | Sealand Contractors Corp. | $6,123,000 | +30% |
| 3 | Villager Construction Inc | $6,515,450 | +38% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Seneca Stone Corp | 2. Sealand Contractors Corp. | 3. Villager Construction Inc |
|---|---|---|---|---|---|---|
| 1 | (201.07000004) | 246 | $20.00 | $10.00 | $7.00 | |
| 2 | (201.07010004) | 1 | $10,000 | $800.00 | $600.00 | |
| 3 | Unclassified Excavation and Disposal (203.02) | CY | 3,040 | $105.00 | $125.00 | $285.00 |
| 4 | Embankment In Place (203.03) | CY | 311 | $40.00 | $100.00 | $100.00 |
| 5 | Select Granular Fill (203.07) | CY | 75 | $60.00 | $125.00 | $65.00 |
| 6 | Trench and Culvert Excavation (206.0201) | CY | 153 | $100.00 | $125.00 | $145.00 |
| 7 | (206.03060005) | 294 | $42.00 | $29.00 | $45.00 | |
| 8 | Test Pit Excavation (206.05) | EACH | 4 | $1,600.00 | $2,000.00 | $1,600.00 |
| 9 | Seed and Mulch – Temporary (209.1003) | SY | 5,014 | $1.00 | $0.96 | $1.00 |
| 10 | Sediment Filter Log, 12″ (209.2301) | LF | 200 | $12.00 | $12.00 | $10.00 |
| 11 | Subbase Course, Type 2 (304.12) | CY | 1,663 | $170.00 | $165.00 | $390.00 |
| 12 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 1 | $105.00 | $105.00 | $105.00 |
| 13 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 54 | $105.00 | $105.00 | $105.00 |
| 14 | (404.0189) | TON | 359 | $100.00 | $200.00 | $195.00 |
| 15 | (404.1989) | TON | 167 | $200.00 | $360.00 | $275.00 |
| 16 | (404.3789) | TON | 225 | $190.00 | $330.00 | $270.00 |
| 17 | (406.0962) | TON | 3,218 | $150.00 | $162.00 | $172.00 |
| 18 | Diluted Tack Coat (407.0102) | GAL | 2,729 | $6.00 | $9.00 | $9.00 |
| 19 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 18,507 | $0.60 | $1.15 | $0.70 |
| 20 | (490.17011018) | 23,638 | $4.00 | $4.25 | $3.75 | |
| 21 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 6,071 | $10.00 | $11.00 | $9.00 |
| 22 | PCC Foundation for Pavement, PEM Concrete (503.1013) | CY | 43 | $600.00 | $1,100.00 | $895.00 |
| 23 | (520.51000006) | 34 | $100.00 | $200.00 | $50.00 | |
| 24 | Shields and Shoring (552.17) | SF | 1,090 | $2.00 | $2.00 | $0.10 |
| 25 | (567.64000001) | 40 | $200.00 | $500.00 | $200.00 | |
| 26 | (584.50010018) | 6,272 | $8.00 | $8.20 | $8.00 | |
| 27 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 14 | $150.00 | $150.00 | $55.00 |
| 28 | (603.6005) | LF | 18 | $500.00 | $650.00 | $500.00 |
| 29 | Concrete Collars (603.77) | EACH | 13 | $4,000.00 | $5,000.00 | $3,000.00 |
| 30 | (603.9812) | LF | 21 | $200.00 | $550.00 | $400.00 |
| 31 | (604.070401) | EACH | 16 | $3,000.00 | $5,000.00 | $3,500.00 |
| 32 | (604.070402) | EACH | 28 | $3,000.00 | $4,400.00 | $3,200.00 |
| 33 | (604.300211) | LF | 4.40 | $2,500.00 | $2,700.00 | $1,250.00 |
| 34 | (604.300311) | LF | 3.20 | $2,500.00 | $3,300.00 | $1,700.00 |
| 35 | (604.300411) | LF | 11 | $2,500.00 | $3,000.00 | $1,520.00 |
| 36 | (604.301522) | LF | 8.70 | $2,600.00 | $2,400.00 | $1,680.00 |
| 37 | (604.302122) | LF | 3.40 | $2,000.00 | $3,400.00 | $1,360.00 |
| 38 | Concrete Sidewalks and Driveways (608.0101) | CY | 633 | $1,100.00 | $1,500.00 | $1,450.00 |
| 39 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 331 | $350.00 | $360.00 | $430.00 |
| 40 | (608.21000003) | 64 | $700.00 | $550.00 | $450.00 | |
| 41 | Stone Curb – Near Vertical Face (NVF) (609.0212) | LF | 400 | $75.00 | $150.00 | $115.00 |
| 42 | Stone Curb – Bridge (Type F1) (609.0302) | LF | 43 | $250.00 | $260.00 | $215.00 |
| 43 | (609.0401) | LF | 2,961 | $70.00 | $135.00 | $115.00 |
| 44 | Resetting Existing Curb (609.15) | LF | 43 | $65.00 | $225.00 | $130.00 |
| 45 | Turf Establishment – Performance (610.1605) | SY | 5,078 | $13.00 | $18.50 | $10.00 |
| 46 | Watering Vegetation (610.19) | 1,000 GALLONS | 30 | $100.00 | $100.00 | $250.00 |
| 47 | (611.0151) | EACH | 1 | $2,000.00 | $1,050.00 | $920.00 |
| 48 | (611.0201) | EACH | 18 | $800.00 | $820.00 | $860.00 |
| 49 | (611.19010024) | 1 | $500.00 | $325.00 | $220.00 | |
| 50 | (611.19020024) | 18 | $250.00 | $235.00 | $195.00 | |
| 51 | (614.060504) | EACH | 14 | $3,800.00 | $5,300.00 | $4,200.00 |
| 52 | (614.060604) | EACH | 3 | $5,500.00 | $6,100.00 | $4,900.00 |
| 53 | (614.060704) | EACH | 1 | $10,000 | $7,700.00 | $6,200.00 |
| 54 | Pre-Existing Stump Removal up to 24” diameter at 6 inches above grade (614.0701) | EACH | 2 | $500.00 | $300.00 | $220.00 |
| 55 | Pre-Existing Stump Removal over 48” diameter at 6 inches above grade (614.0703) | EACH | 1 | $1,000.00 | $600.00 | $440.00 |
| 56 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $450,000 | $643,369 | $628,243 |
| 57 | Type III Construction Barricades (619.04) | EACH | 94 | $50.00 | $250.00 | $120.00 |
| 58 | (619.080101) | LF | 488 | $1.00 | $5.50 | $1.10 |
| 59 | (619.0901) | LF | 13,404 | $0.35 | $0.48 | $0.50 |
| 60 | (619.111211) | WEEK | 8 | $1,000.00 | $1,500.00 | $1,000.00 |
| 61 | Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613) | MONTH | 24 | $450.00 | $163.00 | $475.00 |
| 62 | Pavement Patching (Force Acount) (619.2601) | DOL | 20,000 | $1.00 | $1.00 | $1.00 |
| 63 | Pavement Patching (Tonnage) (619.2602) | TON | 5 | $750.00 | $1,000.00 | $650.00 |
| 64 | Cleaning Drainage Structures (621.04) | EACH | 16 | $500.00 | $700.00 | $350.00 |
| 65 | Crushed Stone (In-Place Measure) (623.12) | CY | 3 | $500.00 | $300.00 | $90.00 |
| 66 | Survey Operations (625.01) | LS | 1 | $65,000 | $54,000 | $75,000 |
| 67 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 45 | $250.00 | $220.00 | $230.00 |
| 68 | Permanent Survey Markers (625.06) | EACH | 6 | $1,000.00 | $3,000.00 | $3,500.00 |
| 69 | (627.50140008) | 3,448 | $5.00 | $6.00 | $7.25 | |
| 70 | Removal and Repair of Deteriorated Asphalt Pavement – Greater than 4 Square Yards and less than 20 Square Yards (633.1402) | SY | 100 | $130.00 | $350.00 | $500.00 |
| 71 | Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403) | SY | 400 | $120.00 | $275.00 | $200.00 |
| 72 | Cleaning and Preparation of Pavement Surfaces-Lines (635.0103) | LF | 200 | $1.00 | $11.00 | $1.10 |
| 73 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $2,500.00 | $11,000 | $3,500.00 |
| 74 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 21 | $2,500.00 | $2,500.00 | $2,000.00 |
| 75 | Office Technology and Supplies (637.34) | DOL | 1,000 | $1.00 | $1.00 | $1.00 |
| 76 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 77 | (640.11020004) | 13,300 | $1.75 | $3.95 | $2.00 | |
| 78 | (640.12020004) | 250 | $1.75 | $3.95 | $2.00 | |
| 79 | White Paint Reflectorized Pavement Stripes – 20 mils (640.20) | LF | 13,900 | $0.40 | $0.51 | $0.40 |
| 80 | Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21) | LF | 13,200 | $0.40 | $0.51 | $0.40 |
| 81 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 4 | $80.00 | $50.00 | $90.00 |
| 82 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 207 | $40.00 | $41.00 | $45.00 |
| 83 | Overhead Sign Panels (645.61) | SF | 30 | $90.00 | $255.00 | $100.00 |
| 84 | Type A Sign Posts (645.81) | EACH | 34 | $215.00 | $205.00 | $235.00 |
| 85 | (645.81090003) | 24 | $50.00 | $75.00 | $55.00 | |
| 86 | Breakaway Wooden Sign Posts (645.82) | EACH | 1 | $500.00 | $350.00 | $550.00 |
| 87 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 6 | $11.00 | $25.00 | $12.00 |
| 88 | Steel Post, 2.0 lb/ft (646.32) | EACH | 6 | $65.00 | $115.00 | $70.00 |
| 89 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 3 | $220.00 | $150.00 | $245.00 |
| 90 | Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41) | EACH | 1 | $80.00 | $125.00 | $90.00 |
| 91 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 6 | $80.00 | $48.00 | $85.00 |
| 92 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 37 | $60.00 | $48.00 | $65.00 |
| 93 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 1,211 | $4.50 | $5.00 | $4.00 |
| 94 | Welded Frame & Rectangular Grate 6 (655.1006) | EACH | 12 | $500.00 | $600.00 | $500.00 |
| 95 | Welded Frame & Rectangular Grate 11 (655.1011) | EACH | 4 | $800.00 | $750.00 | $2,000.00 |
| 96 | Welded Frame & Rectangular Grate 22 (655.1022) | EACH | 2 | $600.00 | $1,100.00 | $2,300.00 |
| 97 | (662.60010004) | 1,000 | $1.00 | $1.00 | $1.00 | |
| 98 | Relocate Existing Hydrant (663.31) | EACH | 2 | $5,000.00 | $7,000.00 | $4,100.00 |
| 99 | Adjust Existing Valve Box Elevation (663.33) | EACH | 40 | $300.00 | $950.00 | $450.00 |
| 100 | Adjust Existing Hydrant Elevation (663.34) | EACH | 3 | $3,000.00 | $2,500.00 | $2,300.00 |
| 101 | (665.98000002) | LS | 1 | $70,000 | $115,000 | $76,000 |
| 102 | (670.7004) | LF | 748 | $3.50 | $6.85 | $4.00 |
| 103 | Ground Wire No. 6 AWG. (670.7501) | LF | 374 | $2.00 | $6.85 | $2.00 |
| 104 | (680.05010007) | 1 | $30,000 | $36,000 | $32,000 | |
| 105 | (680.05020007) | 1 | $5,000.00 | $5,400.00 | $5,400.00 | |
| 106 | Pole Excavation and Concrete Foundation (680.5001) | CY | 7.40 | $3,200.00 | $2,300.00 | $3,500.00 |
| 107 | Concrete Base for Controller Cabinet (680.5002) | EACH | 1 | $4,200.00 | $2,700.00 | $4,500.00 |
| 108 | Concrete Work Pad (5 feet x 5 feet x 4 inches) (680.5003) | EACH | 1 | $1,000.00 | $700.00 | $1,000.00 |
| 109 | (680.510301) | EACH | 4 | $2,300.00 | $2,150.00 | $2,500.00 |
| 110 | (680.510401) | EACH | 1 | $2,900.00 | $2,600.00 | $3,000.00 |
| 111 | (680.520106) | LF | 23 | $30.00 | $40.00 | $32.00 |
| 112 | (680.520510) | LF | 36 | $16.00 | $30.00 | $17.00 |
| 113 | (680.520706) | LF | 213 | $7.00 | $8.00 | $7.00 |
| 114 | (680.520708) | LF | 58 | $10.00 | $18.00 | $10.00 |
| 115 | Trenchless Installation Method for Conduit (680.5301) | LF | 402 | $100.00 | $72.00 | $110.00 |
| 116 | (680.622040) | EACH | 1 | $16,000 | $15,600 | $17,000 |
| 117 | (680.622042) | EACH | 1 | $18,000 | $15,800 | $20,000 |
| 118 | (680.622054) | EACH | 1 | $25,000 | $27,800 | $26,000 |
| 119 | (680.622148) | EACH | 1 | $24,000 | $20,600 | $25,000 |
| 120 | Dual Span Wire Assembly with Upper Tether Wire (680.7002) | EACH | 1 | $7,500.00 | $3,400.00 | $8,000.00 |
| 121 | Riser Assembly, 2-inch Diameter (680.700606) | EACH | 1 | $1,100.00 | $605.00 | $1,150.00 |
| 122 | (680.730514) | LF | 3,290 | $5.00 | $4.95 | $5.50 |
| 123 | (680.730714) | LF | 787 | $6.00 | $7.35 | $5.75 |
| 124 | (680.78100108) | LS | 1 | $14,000 | $5,600.00 | $15,000 |
| 125 | (680.78100208) | LS | 1 | $1,500.00 | $1,600.00 | $1,650.00 |
| 126 | (680.80324515) | 1 | $2,800.00 | $1,900.00 | $2,900.00 | |
| 127 | (680.80324603) | 1 | $1,400.00 | $1,350.00 | $1,500.00 | |
| 128 | (680.80620215) | 1 | $2,600.00 | $6,200.00 | $2,600.00 | |
| 129 | Traffic Signal Module - 12-inch, Red Ball, LED (680.810101) | EACH | 12 | $120.00 | $106.00 | $125.00 |
| 130 | Traffic Signal Module - 12-inch, Red Arrow, LED (680.810102) | EACH | 3 | $115.00 | $122.00 | $120.00 |
| 131 | Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103) | EACH | 12 | $120.00 | $106.00 | $125.00 |
| 132 | Traffic Signal Module - 12-inch, Yellow Arrow, LED (680.810104) | EACH | 6 | $115.00 | $122.00 | $120.00 |
| 133 | Traffic Signal Module - 12-inch, Green Ball, LED (680.810105) | EACH | 8 | $120.00 | $106.00 | $125.00 |
| 134 | Traffic Signal Module - 12-inch, Green Arrow, LED (680.810106) | EACH | 1 | $115.00 | $121.00 | $120.00 |
| 135 | Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601) | EACH | 42 | $250.00 | $235.00 | $265.00 |
| 136 | Traffic Signal Bracket Assembly - 2 Way (680.8112) | EACH | 2 | $950.00 | $825.00 | $985.00 |
| 137 | Traffic Signal Bracket Assembly - 4 Way (680.8114) | EACH | 1 | $1,400.00 | $1,295.00 | $1,400.00 |
| 138 | (680.81210004) | 11 | $650.00 | $565.00 | $685.00 | |
| 139 | Backplates for Traffic Signal Heads (680.8199) | EACH | 19 | $330.00 | $290.00 | $355.00 |
| 140 | (680.8205) | EACH | 2 | $850.00 | $710.00 | $880.00 |
| 141 | (680.8206) | EACH | 1 | $900.00 | $935.00 | $910.00 |
| 142 | Meter Pan (680.9402) | EACH | 1 | $2,000.00 | $1,450.00 | $1,800.00 |
| 143 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 1 | $400.00 | $685.00 | $420.00 |
| 144 | (680.950106) | LF | 397 | $3.50 | $2.60 | $4.00 |
| 145 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $11.00 | $11.00 | $11.00 |
| 146 | (683.94000304) | 804 | $7.00 | $5.40 | $7.00 | |
| 147 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 13,900 | $0.70 | $1.00 | $0.75 |
| 148 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 13,200 | $0.70 | $1.00 | $0.75 |
| 149 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 13,300 | $2.50 | $5.15 | $2.50 |
| 150 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 740 | $2.50 | $5.15 | $2.50 |
| 151 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 4 | $300.00 | $265.00 | $250.00 |
| 152 | Field Change Payment (FCP) (697.03) | DOL | 175,000 | $1.00 | $1.00 | $1.00 |
| 153 | Asphalt Price Adjustment (698.04) | DOL | 2,817 | $1.00 | $1.00 | $1.00 |
| 154 | Fuel Price Adjustment (698.05) | DOL | 407 | $1.00 | $1.00 | $1.00 |
| 155 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 156 | Mobilization (699.040001) | LS | 1 | $175,733 | $235,000 | $240,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of April 9, 2026. Compiled by Mirage Metrics.