NYSDOT contract D265779 bid tabulation

PAVEMENT REHABILITATION - Routes NY-5 & US-20. Let by New York State DOT on June 4, 2026, Cayuga, Region 03. 5 bids received; low bid $20,322,842 by Heidelberg Materials Northeast LLC.

Owner
New York State DOT
Letting
04 JUN 2026
Pay items
226
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Heidelberg Materials Northeast LLC$20,322,842Low
2Barrett Paving Materials Inc$22,188,551+9.0%
3Cold Spring Construction Company$22,830,663+12%
4Seneca Stone Corp$24,400,000+20%
5Sealand Contractors Corp.$28,783,001+42%
NYSDOT contract D265779: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Heidelberg Materials Northeast LLC2. Barrett Paving Materials Inc3. Cold Spring Construction Company4. Seneca Stone Corp5. Sealand Contractors Corp.
1Unclassified Excavation and Disposal (203.02)CY6,248$60.00$107.00$55.00$170.00$190.00
2Embankment In Place (203.03)CY7$205.00$95.00$27.00$200.00$300.00
3Select Granular Fill (203.07)CY1,049$151.00$114.88$69.00$100.00$150.00
4 (203.24010017)117$73.00$60.00$63.00$100.00$180.00
5 (205.0201)LS1$4,800.00$1,384.00$5,000.00$2,000.00$3,500.00
6 (205.0202)LS1$4,800.00$1,320.00$4,000.00$2,000.00$3,500.00
7 (205.0203)LS1$4,800.00$1,385.00$5,000.00$2,000.00$3,500.00
8 (205.0204)LS1$3,200.00$636.00$1,500.00$2,000.00$2,500.00
9 (205.0205)LS1$4,800.00$1,770.00$7,000.00$2,000.00$5,000.00
10 (205.0206)LS1$2,300.00$515.00$800.00$1,000.00$2,500.00
11 (205.0207)LS1$2,300.00$632.00$800.00$1,000.00$2,500.00
12 (205.0208)LS1$3,200.00$582.00$1,500.00$1,000.00$2,500.00
13 (205.0209)LS1$3,200.00$616.00$1,500.00$1,000.00$2,500.00
14 (205.0210)LS1$2,300.00$482.00$800.00$1,000.00$2,500.00
15 (205.0211)LS1$4,800.00$1,340.00$5,000.00$2,000.00$3,500.00
16Field Organic Vapor Monitoring of Contaminated Soil (205.03)HR85$175.00$243.00$145.00$250.00$200.00
17 (205.050201)TON27$135.00$182.00$140.00$200.00$250.00
18 (205.050202)TON25$135.00$183.00$140.00$200.00$250.00
19 (205.050203)TON27$135.00$182.00$140.00$200.00$250.00
20 (205.050204)TON10$135.00$185.00$100.00$200.00$250.00
21 (205.050205)TON40$135.00$179.00$140.00$200.00$250.00
22 (205.050206)TON3$135.00$213.00$390.00$500.00$250.00
23 (205.050207)TON3$135.00$213.00$390.00$500.00$250.00
24 (205.050208)TON7$135.00$190.00$235.00$500.00$250.00
25 (205.050209)TON9$135.00$187.00$200.00$200.00$250.00
26 (205.050210)TON1$135.00$290.00$950.00$1,000.00$500.00
27 (205.050211)TON28$135.00$182.00$200.00$200.00$250.00
28Trench and Culvert Excavation (206.0201)CY2,558$47.00$77.00$51.00$70.00$100.00
29 (206.03200010)15$31.40$31.40$105.00$80.00$35.00
30Test Pit Excavation (206.05)EACH8$975.00$1,550.00$2,500.00$3,000.00$3,500.00
31Mulch – Temporary (209.100101)SY8,752$0.90$0.77$0.80$0.80$0.81
32Check Dam (Ditch Bottom Width >3′ to 6′), Gravel Bag – Temporary (209.110202)EACH2$673.00$453.19$1,400.00$2,000.00$2,000.00
33Drainage Structure Inlet Protection, Gravel Bag – Temporary (209.1702)CY1$1,600.00$513.19$950.00$1,000.00$3,000.00
34Drainage Structure Inlet Protection, Catch Basin Inserts for Trash, Sediment and Debris Removal – Temporary (209.1706)EACH3$603.00$207.58$475.00$500.00$700.00
35Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301)SY690$5.00$5.16$5.50$6.00$5.50
36 (209.23010009)1,090$9.75$8.24$8.75$10.00$14.00
37Subbase Course, Optional Type (304.15)CY3,828$156.00$190.00$155.00$210.00$205.00
38Pavement Density Quality Adjustment to Asphalt Items (404.0002)QUALITY UNIT1$110.00$110.00$110.00$110.00$110.00
39Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003)QUALITY UNIT641$110.00$110.00$110.00$110.00$110.00
40 (404.0189)TON2,501$114.00$161.11$155.00$110.00$215.00
41 (404.2569)TON631$340.00$220.00$340.00$200.00$500.00
42 (406.0962)TON10,159$143.00$170.00$175.00$150.00$188.00
43 (406.1969)TON16,978$124.40$149.00$144.00$140.00$164.00
44Diluted Tack Coat (407.0102)GAL25,239$2.10$2.35$3.85$5.00$10.90
45Asphalt Pavement Joint Adhesive (418.7603)LF224,177$0.28$0.30$0.80$0.50$0.80
46Production Cold Milling of Bituminous Concrete (490.10)SY102,104$4.15$5.00$3.75$3.00$6.70
47Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY21,405$7.80$10.90$10.00$10.00$14.00
48PCC Foundation for Pavement, PEM Concrete (503.1013)CY253$609.00$900.00$775.00$800.00$1,700.00
49Shields and Shoring (552.17)SF9,398$1.00$0.21$2.00$2.00$1.00
50Transition Bridge Railing (568.70)LF264$303.00$236.00$250.00$320.00$320.00
51 (602.3612)LF1,345$225.00$225.00$196.00$250.00$265.00
52 (602.3618)LF6,478$190.00$190.00$158.00$220.00$225.00
53 (602.3624)LF1,749$240.00$240.00$242.00$280.00$280.00
54 (602.3630)LF2,648$295.00$302.10$235.00$350.00$345.00
55 (602.3636)LF1,275$375.00$382.37$347.00$450.00$430.00
56 (602.3642)LF210$525.00$533.95$619.00$600.00$600.00
57 (602.3648)LF358$675.00$680.25$466.00$800.00$765.00
58 (602.36540003)345$775.00$780.45$669.00$950.00$875.00
59 (603.171016)EACH1$345.00$374.80$525.00$400.00$1,700.00
60 (603.171216)EACH2$387.00$405.95$550.00$500.00$1,800.00
61 (603.171416)EACH1$693.00$466.99$825.00$600.00$2,000.00
62 (603.171614)EACH1$926.00$648.76$1,025.00$800.00$2,600.00
63 (603.171814)EACH3$1,382.00$1,113.28$1,450.00$2,000.00$3,000.00
64 (603.172112)EACH1$3,747.00$3,252.40$3,500.00$5,000.00$7,500.00
65 (603.6003)LF521$64.25$79.00$180.00$200.00$155.00
66 (603.6005)LF461$110.00$120.00$290.00$220.00$215.00
67 (603.6102)LF56$97.00$83.00$245.00$250.00$135.00
68 (603.6701)LF148$118.00$117.00$244.00$300.00$205.00
69Concrete Collars (603.77)EACH3$2,400.00$2,285.00$3,500.00$6,000.00$7,000.00
70 (603.9815)LF27$66.00$82.00$135.00$250.00$120.00
71 (603.9818)LF391$42.00$54.00$155.00$150.00$130.00
72 (603.9824)LF593$59.00$72.00$175.00$170.00$190.00
73 (604.070301)EACH41$1,565.00$3,500.00$3,650.00$5,000.00$10,000
74 (604.070302)EACH24$1,040.00$880.00$850.00$2,000.00$2,000.00
75 (604.070303)EACH22$1,580.00$1,750.00$2,250.00$4,000.00$3,000.00
76 (604.300671)LF17$1,080.00$1,640.00$1,400.00$3,300.00$3,500.00
77 (604.301071)LF18$963.00$1,600.00$1,200.00$3,200.00$3,000.00
78 (604.4060)LF8$668.00$1,160.00$850.00$2,300.00$2,500.00
79Underdrain Filter, Type II (605.1001)CY101$252.00$370.00$78.00$60.00$200.00
80 (605.1601)LF1,523$14.45$14.00$23.00$20.00$20.00
81Box Beam Guide Railing (606.10)LF1,785$64.75$46.00$52.00$80.00$68.00
82Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002)LF79$71.60$100.00$56.00$90.00$80.00
83Box Beam End Piece (606.120101)EACH7$800.00$850.00$725.00$1,000.00$850.00
84Box Beam Guide Railing End Assembly Type I (606.120102)EACH3$5,475.00$4,140.00$4,400.00$7,000.00$5,800.00
85Box Beam Guide Railing End Assembly Type IIA (606.120201)EACH2$2,635.00$2,200.00$2,200.00$3,300.00$2,800.00
86 (606.12040015)1$5,805.00$4,305.00$4,500.00$7,000.00$6,100.00
87Removing and Disposing Box Beam Guide Railing (606.73)LF1,747$5.00$5.00$12.50$12.00$8.00
88Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920)EACH12$150.00$150.00$300.00$300.00$525.00
89 (607.3102)LF3,822$56.00$40.00$42.00$40.00$43.00
90Concrete Sidewalks and Driveways (608.0101)CY1,470$1,108.00$1,098.00$1,075.00$1,550.00$1,800.00
91 (608.01050109)22$6,020.00$3,900.00$10,000$6,000.00$10,500
92 (608.01050209)4$7,000.00$4,300.00$11,000$10,000$12,900
93 (608.01050309)6$7,930.00$4,600.00$11,500$12,000$16,000
94 (608.01050409)37$8,430.00$5,100.00$12,000$12,000$18,000
95 (608.01050509)3$8,600.00$4,600.00$12,250$15,000$20,000
96 (608.01050609)4$12,500$6,300.00$14,500$15,000$25,000
97 (608.01051209)1$7,835.00$5,220.00$12,000$20,000$28,000
98Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON923$312.00$300.00$310.00$300.00$500.00
99Stone Curb – Near Vertical Face (NVF) (609.0212)LF1,254$98.00$68.00$108.00$100.00$120.00
100Stone Curb – Mountable (MT) (609.0214)LF69$106.00$80.00$99.00$110.00$160.00
101Cast-in-Place Concrete Curb (As Detailed) (609.04)LF240$120.00$114.00$118.00$120.00$220.00
102Resetting Existing Curb (609.15)LF5,245$98.00$86.00$100.00$70.00$120.00
103Fertilizer (610.0501)LB60$5.00$30.00$31.00$9.00$32.00
104Moisture Retention Additive (610.08)LB12$25.00$25.00$27.00$20.00$27.00
105 (610.10020109)117$101.25$200.00$210.00$150.00$350.00
106Weed Removal (610.13)SY3,160$5.00$5.00$5.25$1.00$6.00
107Topsoil - Roadside (610.1402)CY241$145.00$125.00$140.00$140.00$250.00
108 (610.15040308)3,830$1.50$1.37$1.45$4.00$7.50
109Turf Establishment -Lawns (610.1602)SY9,862$1.25$1.15$1.20$2.00$1.20
110 (610.16030724)1,580$2.50$2.51$2.65$3.00$2.65
111Turf Establishment – Performance (610.1605)SY4,744$19.00$20.00$42.00$20.00$28.00
112Watering Vegetation (610.19)1,000 GALLONS140$30.00$50.00$52.00$50.00$50.00
113 (611.0141)EACH97$600.00$624.00$675.00$700.00$650.00
114 (611.0151)EACH23$630.00$669.00$725.00$700.00$700.00
115 (611.0212)EACH4$600.00$311.00$335.00$600.00$325.00
116 (611.0281)EACH7$550.00$579.00$625.00$650.00$605.00
117 (611.0291)EACH2$600.00$610.00$650.00$700.00$635.00
118 (611.0711)EACH126$40.00$38.00$41.00$40.00$39.50
119 (611.19010024)120$25.00$200.00$200.00$100.00$200.00
120 (611.19020024)13$25.00$183.00$180.00$100.00$183.00
121Rodent Guard (611.21)EACH133$3.76$20.00$21.00$15.00$22.00
122 (614.0162)4$250.00$250.00$1,050.00$300.00$265.00
123Care of Trees up to 12” Diam. at Breast Height – Pruning (614.0411)EACH42$82.50$82.50$90.00$200.00$225.00
124Care of Trees Over 12” to 24” Diam. at Breast Height - Pruning (614.0421)EACH106$195.00$195.00$210.00$400.00$450.00
125Care of Trees Over 24” to 36” Diam. at Breast Height - Pruning (614.0431)EACH5$515.00$515.00$550.00$1,000.00$700.00
126Care of Trees Over 60” Diam. at Breast Height – Pruning (614.0461)EACH1$1,250.00$1,250.00$1,350.00$2,000.00$1,150.00
127Improvement of Vegetated Areas (614.05)SY8,243$6.00$3.23$3.25$7.00$6.30
128 (614.060104)EACH9$325.00$365.66$350.00$400.00$500.00
129 (614.060204)EACH33$575.00$615.66$600.00$900.00$900.00
130 (614.060304)EACH32$1,000.00$1,040.64$1,050.00$1,500.00$1,600.00
131 (614.060402)EACH1$1,250.00$1,291.47$1,325.00$1,800.00$2,500.00
132 (614.060404)EACH19$1,500.00$1,540.71$1,575.00$2,200.00$2,900.00
133 (614.060504)EACH9$1,800.00$1,840.66$1,900.00$3,000.00$4,500.00
134 (614.060604)EACH1$3,000.00$3,041.47$3,150.00$5,000.00$6,500.00
135Pre-Existing Stump Removal up to 24” diameter at 6 inches above grade (614.0701)EACH5$625.00$665.50$650.00$500.00$900.00
136Pre-Existing Stump Removal over 24” to 48” diameter at 6 inches above grade (614.0702)EACH2$753.50$793.76$800.00$600.00$1,100.00
137Basic Work Zone Traffic Control (619.01)LS1$1,951,800$2,631,430$3,175,000$1,800,000$2,191,461
138 (619.080101)LF1,379$2.80$2.50$2.85$5.00$6.00
139 (619.080201)EACH10$100.00$125.00$100.00$100.00$110.00
140Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803)LF500$8.37$6.00$8.75$10.00$22.00
141 (619.0901)LF118,748$0.34$0.35$0.35$0.30$0.85
142 (619.110533)EACH2$22,000$7,215.00$27,000$50,000$45,000
143Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613)MONTH39$250.00$250.00$500.00$200.00$265.00
144Pavement Patching (Force Acount) (619.2601)DOL27,000$1.00$1.00$1.00$1.00$1.00
145Bedding Material, Type 2 (620.0802)CY128$177.00$123.00$225.00$100.00$400.00
146Cleaning Closed Drainage Systems (621.03)LF4,072$10.45$9.00$6.25$11.00$6.50
147Cleaning Drainage Structures (621.04)EACH183$773.00$710.00$300.00$900.00$265.00
148 (621.51000015)6,047$10.15$18.00$12.50$10.00$35.00
149Survey Operations (625.01)LS1$68,950$95,000$200,000$500,000$135,000
150Steel Pin and Cap Right of Way Markers (625.05)EACH21$339.00$658.67$500.00$600.00$525.00
151 (627.50140008)12,060$4.50$5.58$8.25$6.00$9.00
152Concrete Cylinder Curing Equipment (637.04)EACH1$5,000.00$1,900.00$300.00$4,000.00$10,000
153Engineer’s Field Office – Type 2 (637.12)MONTH30$3,500.00$3,975.00$2,600.00$3,500.00$2,500.00
154Rain Gauge (637.26)EACH1$300.00$100.00$100.00$300.00$350.00
155Office Technology and Supplies (637.34)DOL1,340$1.00$1.00$1.00$1.00$1.00
156Partnering Workshop (637.35)DOL5,000$1.00$1.00$1.00$1.00$1.00
157Construction Testing supplies – Consumables (637.36)DOL100$1.00$1.00$1.00$1.00$1.00
158 (637.41000115)30$1,550.00$190.00$165.00$200.00$50.00
159 (637.41000215)30$1,550.00$190.00$165.00$200.00$50.00
160 (637.41000315)30$1,550.00$190.00$165.00$200.00$50.00
161 (637.41000415)30$1,550.00$190.00$165.00$200.00$50.00
162Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF2,133$41.00$41.00$40.00$50.00$43.00
163Type A Sign Posts (645.81)EACH350$205.00$177.00$215.25$220.00$215.00
164Type A Sign Posts with Extra Embedment (645.8104)EACH8$211.00$333.00$215.00$420.00$225.00
165 (645.81090003)80$75.00$50.00$63.00$60.00$80.00
166Pole-Mounted Sign Support System (Band Mounting) (645.85)EACH8$253.00$430.00$93.00$550.00$265.00
167Reference Marker Panel (646.21)EACH46$34.00$33.00$45.00$40.00$36.00
168Steel Post, 2.0 lb/ft (646.32)EACH30$78.00$70.00$105.00$80.00$82.00
169Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41)EACH4$88.00$80.00$42.00$100.00$95.00
170Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51)EACH31$40.00$18.00$36.00$80.00$42.00
171Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH167$42.00$60.00$47.00$75.00$44.00
172Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62)EACH1$80.00$60.00$52.00$400.00$85.00
173 (647.83001002)27$11.00$325.00$8.25$20.00$12.00
174 (655.05170010)25$750.00$970.00$875.00$1,200.00$3,000.00
175Cast Frame F1, UnMountable Curb Box CU1 & Reticuline Grate G1 (655.0704)EACH7$1,950.00$2,200.00$2,000.00$1,500.00$3,200.00
176Cast Frame F2, UnMountable Curb Box CU2 & Reticuline Grate G2 (655.0705)EACH39$2,200.00$2,400.00$2,350.00$2,000.00$3,500.00
177Cast Frame F3, UnMountable Curb Box CU3 & Reticuline Grate G3 (655.0706)EACH1$2,600.00$2,700.00$2,650.00$2,300.00$4,000.00
178 (655.13000015)21$2,100.00$2,700.00$3,600.00$3,000.00$6,000.00
179 (660.65000101)15$1,550.00$1,700.00$1,625.00$4,000.00$5,500.00
180Adjust Existing Valve Box Elevation (663.33)EACH40$465.00$324.00$840.00$200.00$1,700.00
181 (670.0106)EACH2$2,536.00$2,536.00$4,100.00$2,000.00$2,700.00
182 (670.03090007)2$2,684.00$2,684.00$2,700.00$5,000.00$2,900.00
183Performance Concrete Quality Adjustment (670.99)QUALITY UNIT1$17.91$17.91$17.91$17.91$17.91
184 (680.05010007)9$29,035$29,035$30,000$40,000$30,500
185 (680.05020007)12$3,786.00$3,786.00$5,500.00$6,000.00$4,000.00
186 (680.05040004)7$3,272.00$3,272.00$4,000.00$5,000.00$3,450.00
187 (680.05080014)4$517.00$517.00$1,900.00$800.00$545.00
188Pole Excavation and Concrete Foundation (680.5001)CY1$5,734.00$5,734.00$5,500.00$5,000.00$6,050.00
189 (680.520106)LF15$17.11$17.11$105.00$40.00$18.00
190 (680.53010010)870$7.13$7.13$9.00$5.00$7.50
191 (680.670802)EACH1$1,601.00$1,601.00$3,000.00$2,400.00$1,700.00
192 (680.730714)LF2,125$5.10$5.10$7.50$8.00$5.35
193 (680.77000905)1$711.00$711.00$2,500.00$5,000.00$750.00
194 (680.79000105)1$5,140.00$5,140.00$3,500.00$5,500.00$5,400.00
195 (680.79000205)1$8,514.00$8,514.00$3,500.00$9,000.00$9,000.00
196 (680.79000305)1$9,801.00$9,801.00$3,500.00$9,000.00$10,300
197 (680.79000405)1$4,685.00$4,685.00$3,500.00$4,000.00$5,000.00
198 (680.79000505)1$4,685.00$4,685.00$3,500.00$4,000.00$5,000.00
199 (680.79000605)1$5,446.00$5,446.00$4,000.00$3,000.00$5,800.00
200 (680.79000705)1$5,595.00$5,595.00$3,500.00$2,400.00$5,900.00
201 (680.79000805)1$7,391.00$7,391.00$3,500.00$3,200.00$7,800.00
202 (680.79000905)1$7,687.00$7,687.00$4,000.00$4,300.00$8,100.00
203 (680.79001005)1$6,760.00$6,760.00$4,000.00$7,500.00$7,100.00
204 (680.79001105)1$4,237.00$4,237.00$4,000.00$5,800.00$4,500.00
205 (680.79001205)1$5,337.00$5,337.00$4,000.00$2,300.00$5,600.00
206 (680.79001305)1$5,337.00$5,337.00$4,000.00$2,200.00$5,600.00
207Battery Backup System (680.80)EACH2$6,702.00$6,702.00$10,000$10,000$7,050.00
208 (680.80324515)11$2,801.00$2,801.00$4,000.00$2,500.00$2,950.00
209 (680.80324603)8$1,213.00$1,213.00$2,500.00$1,600.00$1,280.00
210Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105)EACH8$186.00$186.00$375.00$300.00$195.00
211Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106)EACH16$390.00$390.00$275.00$350.00$410.00
212Pedestrian Signal Bracket Mount Assembly (680.8141)EACH3$588.00$588.00$600.00$750.00$620.00
213Pedestrian Signal Post Top Mount Assembly (680.8142)EACH3$486.00$486.00$625.00$1,100.00$510.00
214Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001)EACH8$227.00$227.00$350.00$350.00$240.00
215 (680.8151)EACH92$1,253.00$1,253.00$2,000.00$1,500.00$1,320.00
216Performance Concrete Quality Adjustment (680.99)QUALITY UNIT1$4.00$4.00$4.00$4.00$4.00
217White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF54,173$1.54$2.50$1.60$3.00$2.85
218Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF9,835$0.97$1.15$1.00$2.50$2.21
219White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304)EACH212$89.85$125.00$90.00$95.00$85.00
220White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404)EACH94$232.43$255.00$240.00$280.00$310.00
221 (691.04000020)84,000$1.00$1.00$1.00$1.00$1.00
222Field Change Payment (FCP) (697.03)DOL820,000$1.00$1.00$1.00$1.00$1.00
223Asphalt Price Adjustment (698.04)DOL21,450$1.00$1.00$1.00$1.00$1.00
224Fuel Price Adjustment (698.05)DOL2,452$1.00$1.00$1.00$1.00$1.00
225Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00
226Mobilization (699.040001)LS1$750,000$843,000$878,000$934,166$1,107,000
NYSDOT contract D265779: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of June 4, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy