NYSDOT contract D265580 bid tabulation
HIGHWAY MILL & FILL - Rts I-81, SH 54-3, SH 57-6 & SH 57-8. Let by New York State DOT on October 23, 2025, Onondaga, Region 03. 3 bids received; low bid $11,203,001 by Sealand Contractors Corp..
- Owner
- New York State DOT
- Letting
- 23 OCT 2025
- Pay items
- 35
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Sealand Contractors Corp. | $11,203,001 | Low |
| 2 | Barrett Paving Materials Inc | $11,500,000 | +3.0% |
| 3 | Seneca Stone Corp | $13,100,000 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sealand Contractors Corp. | 2. Barrett Paving Materials Inc | 3. Seneca Stone Corp |
|---|---|---|---|---|---|---|
| 1 | (203.24010017) | 320 | $225.00 | $76.80 | $80.00 | |
| 2 | (404.0189) | TON | 550 | $225.00 | $158.00 | $200.00 |
| 3 | (406.0952) | TON | 20,726 | $129.00 | $145.00 | $145.00 |
| 4 | (406.1959) | TON | 34,544 | $119.00 | $128.00 | $140.00 |
| 5 | Diluted Tack Coat (407.0102) | GAL | 38,810 | $7.50 | $1.98 | $5.00 |
| 6 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 182,751 | $0.75 | $0.81 | $0.50 |
| 7 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 214,056 | $5.75 | $2.60 | $5.00 |
| 8 | Production Cold-Mill Surface Planing of Bituminous Concrete (490.15) | SY | 16,956 | $6.00 | $2.60 | $4.00 |
| 9 | (617.11000024) | LS | 1 | $1,000.00 | $1,858.00 | $4,000.00 |
| 10 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $595,269 | $1,429,891 | $850,000 |
| 11 | Type III Construction Barricades (619.04) | EACH | 48 | $250.00 | $54.54 | $100.00 |
| 12 | (619.080102) | LF | 73,641 | $0.49 | $0.49 | $0.50 |
| 13 | (619.0901) | LF | 73,641 | $0.51 | $0.48 | $1.00 |
| 14 | (619.110712) | EACH | 12 | $15,000 | $2,500.00 | $25,000 |
| 15 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $175,000 | $95,000 | $600,000 |
| 16 | Traffic Control Supervisor (619.25) | MONTH | 10 | $16,000 | $15,300 | $40,000 |
| 17 | Cleaning Closed Drainage Systems (621.03) | LF | 4,431 | $8.00 | $7.50 | $12.00 |
| 18 | Cleaning Drainage Structures (621.04) | EACH | 90 | $230.00 | $600.00 | $600.00 |
| 19 | Survey Operations (625.01) | LS | 1 | $18,000 | $54,000 | $40,000 |
| 20 | Engineer’s Field Office – Type 1 (637.11) | MONTH | 10 | $2,800.00 | $5,400.00 | $3,000.00 |
| 21 | Office Technology and Supplies (637.34) | DOL | 250 | $1.00 | $1.00 | $1.00 |
| 22 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 23 | Milled-In Audible Roadway Delineators (MIARDs) (649.01) | LF | 26,562 | $1.00 | $1.00 | $0.60 |
| 24 | Pavement Ride Quality Adjustment to Asphalt Level 1 (653.1010) | QUALITY UNIT | 193 | $90.00 | $90.00 | $90.00 |
| 25 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 73,641 | $0.48 | $0.45 | $0.60 |
| 26 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 16,192 | $0.48 | $0.45 | $0.60 |
| 27 | (685.16010014) | 67,676 | $1.56 | $1.48 | $1.70 | |
| 28 | (685.17010014) | 34,686 | $1.56 | $1.48 | $1.80 | |
| 29 | White Epoxy Reflectorized Pavement Letters - 15 mil Portable/Hand Application (685.2303) | EACH | 8 | $90.00 | $80.00 | $100.00 |
| 30 | White Epoxy Reflectorized Pavement Symbols - 15 mil Portable/Hand Application (685.2403) | EACH | 8 | $150.00 | $135.00 | $150.00 |
| 31 | Field Change Payment (FCP) (697.03) | DOL | 472,000 | $1.00 | $1.00 | $1.00 |
| 32 | Asphalt Price Adjustment (698.04) | DOL | 10,000 | $1.00 | $1.00 | $1.00 |
| 33 | Fuel Price Adjustment (698.05) | DOL | 2,000 | $1.00 | $1.00 | $1.00 |
| 34 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 35 | Mobilization (699.040001) | LS | 1 | $430,000 | $435,065 | $501,866 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of October 23, 2025. Compiled by Mirage Metrics.