NYSDOT contract D265736 bid tabulation
I86 CRACK & SEAT, OWEGO TO APALACHIN. Let by New York State DOT on March 12, 2026, Tioga, Region 09. 2 bids received; low bid $53,173,398 by Dalrymple Gravel & Contracting Co Inc.
- Owner
- New York State DOT
- Letting
- 12 MAR 2026
- Pay items
- 196
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Dalrymple Gravel & Contracting Co Inc | $53,173,398 | Low |
| 2 | Lancaster Development and Tully Construction Co LLC | $57,990,239 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Dalrymple Gravel & Contracting Co Inc | 2. Lancaster Development and Tully Construction Co LLC |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $250,000 | $19,200 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 158,484 | $20.00 | $37.00 |
| 3 | Embankment In Place (203.03) | CY | 52,058 | $28.00 | $22.00 |
| 4 | Select Granular Fill (203.07) | CY | 297 | $55.00 | $12.00 |
| 5 | (203.24010017) | 3,625 | $40.00 | $43.00 | |
| 6 | (203.51990006) | 501 | $15.00 | $15.70 | |
| 7 | Trench and Culvert Excavation (206.0201) | CY | 13,024 | $10.00 | $50.00 |
| 8 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 360 | $33.00 | $41.10 |
| 9 | Geotextile Bedding (207.20) | SY | 7,610 | $5.00 | $1.85 |
| 10 | Geotextile Drainage (207.22) | SY | 3,827 | $3.00 | $3.00 |
| 11 | Mulch – Temporary (209.100101) | SY | 260,400 | $0.60 | $0.78 |
| 12 | Seed and Mulch – Temporary (209.1003) | SY | 65,100 | $0.75 | $0.99 |
| 13 | Silt Fence - Temporary (209.13) | LF | 500 | $5.00 | $9.45 |
| 14 | Drainage Structure Inlet Protection, Prefabricated – Temporary (209.1703) | LF | 156 | $40.00 | $16.90 |
| 15 | Rolled Erosion Control Product, Class I Type C, Short Term (209.1803) | SY | 65,100 | $4.75 | $6.45 |
| 16 | Rolled Erosion Control Product, Class II Type A, Intermediate (209.1901) | SY | 19 | $25.00 | $45.40 |
| 17 | Soil Stabilizers, Class IV Type C (209.2103) | SY | 173,543 | $0.60 | $0.95 |
| 18 | (209.23010009) | 62,012 | $9.00 | $11.30 | |
| 19 | Subbase Course, Optional Type (304.15) | CY | 61,412 | $60.00 | $69.10 |
| 20 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 3,521 | $100.00 | $100.00 |
| 21 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 588 | $100.00 | $100.00 |
| 22 | (404.0189) | TON | 24,580 | $95.00 | $144.00 |
| 23 | (404.1959) | TON | 47,522 | $110.00 | $112.00 |
| 24 | (404.3769) | TON | 29,510 | $110.00 | $123.00 |
| 25 | (404.4389) | TON | 1,932 | $135.00 | $136.00 |
| 26 | (404.4489) | TON | 4,473 | $135.00 | $200.00 |
| 27 | (407.01040009) | 37,360 | $5.00 | $2.90 | |
| 28 | (416.02000009) | 47,512 | $6.00 | $9.00 | |
| 29 | (416.21010009) | 78,380 | $3.30 | $3.30 | |
| 30 | (416.30010009) | 4,750 | $5.00 | $5.20 | |
| 31 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 179,046 | $0.40 | $0.25 |
| 32 | (421.09520109) | 22,896 | $145.00 | $183.00 | |
| 33 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 83,986 | $4.00 | $5.00 |
| 34 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 1,324 | $20.00 | $17.50 |
| 35 | (502.65960005) | 83,976 | $1.00 | $1.55 | |
| 36 | Concrete for Structures, Performance (555.0021) | CY | 2 | $5,000.00 | $5,180.00 |
| 37 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $7.00 | $7.00 |
| 38 | Transition Bridge Railing (568.70) | LF | 544 | $220.00 | $269.00 |
| 39 | (603.6010) | LF | 11 | $800.00 | $700.00 |
| 40 | (603.7310) | EACH | 2 | $7,500.00 | $10,000 |
| 41 | Concrete Collars (603.77) | EACH | 2 | $5,000.00 | $10,000 |
| 42 | (604.070901) | EACH | 1 | $1,500.00 | $3,460.00 |
| 43 | (604.070902) | EACH | 1 | $1,500.00 | $3,460.00 |
| 44 | (604.070903) | EACH | 1 | $1,500.00 | $3,460.00 |
| 45 | (604.070904) | EACH | 1 | $1,500.00 | $3,460.00 |
| 46 | (604.070905) | EACH | 1 | $1,500.00 | $3,460.00 |
| 47 | Underdrain Filter, Type I (605.0901) | CY | 12,084 | $60.00 | $70.00 |
| 48 | (605.1701) | LF | 123,200 | $10.00 | $1.30 |
| 49 | Anchorage Unit for 3-Cable Guide Railing (TL-2) (606.0201) | EACH | 2 | $3,800.00 | $4,640.00 |
| 50 | Anchorage Units for Cable Median Barrier (606.0310) | EACH | 5 | $3,800.00 | $4,640.00 |
| 51 | Box Beam Guide Railing (606.10) | LF | 39,391 | $45.00 | $54.90 |
| 52 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 1,493 | $57.00 | $69.60 |
| 53 | Box Beam Median Barrier (606.11) | LF | 22,909 | $62.00 | $75.70 |
| 54 | Box Beam End Piece (606.120101) | EACH | 23 | $830.00 | $1,010.00 |
| 55 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 2 | $4,300.00 | $5,250.00 |
| 56 | Box Beam Guide Railing End Assembly Type I with 18 ft Extension (606.120103) | EACH | 19 | $5,200.00 | $6,350.00 |
| 57 | Box Beam End Assembly Type III (606.1203) | EACH | 8 | $6,000.00 | $7,330.00 |
| 58 | Box Beam Median Barrier End Assembly, Type C (606.1403) | EACH | 7 | $12,000 | $14,700 |
| 59 | HPBO (Mod.) Corrugated Beam Guide Railing (606.2701) | LF | 507 | $32.00 | $39.10 |
| 60 | Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing (606.2703) | EACH | 2 | $2,700.00 | $3,300.00 |
| 61 | Single-Slope Concrete Median Barrier (Optional) (606.3041) | LF | 59 | $425.00 | $247.00 |
| 62 | I-Beam Posts for Existing Box Beam Guide Railing (606.4809) | EACH | 15 | $120.00 | $147.00 |
| 63 | Resetting Box Beam Guide Railing (606.53) | LF | 605 | $21.00 | $25.60 |
| 64 | Resetting Box Beam Median Barrier (606.54) | LF | 565 | $29.00 | $35.40 |
| 65 | Resetting Precast Concrete Barrier (606.57) | LF | 74 | $75.00 | $91.50 |
| 66 | Resetting Box Beam Guide Rail Energy-Absorbing Terminal (606.5921) | EACH | 2 | $4,100.00 | $5,010.00 |
| 67 | Removing and Storing Box Beam Guide Railing (606.63) | LF | 19,943 | $8.00 | $9.75 |
| 68 | Removing and Storing HPBO (Mod.) Corrugated Beam Guide Railing (606.66) | LF | 5,706 | $9.00 | $11.00 |
| 69 | Removing and Storing Weak- and Heavy-Post Corrugated Beam Terminals (606.6911) | EACH | 6 | $320.00 | $391.00 |
| 70 | Removing and Storing Box Beam Guide Railing End Assembly (606.6920) | EACH | 37 | $40.00 | $48.80 |
| 71 | Removing and Storing Box Beam Median Barrier End Assembly-Type C (606.6932) | EACH | 3 | $110.00 | $134.00 |
| 72 | Removing and Disposing Cable Guide Railing (606.70) | LF | 11,290 | $2.00 | $2.45 |
| 73 | Removing and Disposing HPBO (Mod.) Corrugated Beam Guide Railing (606.7101) | LF | 507 | $3.00 | $3.65 |
| 74 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 561 | $3.00 | $3.65 |
| 75 | Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79) | EACH | 27 | $320.00 | $391.00 |
| 76 | Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910) | EACH | 6 | $320.00 | $391.00 |
| 77 | Removing and Disposing Weak- and Heavy-Post Corrugated Beam Energy-Absorbing Terminals (606.7911) | EACH | 6 | $650.00 | $794.00 |
| 78 | Removing and Disposing Box Beam Energy-Absorbing Terminal (606.7921) | EACH | 8 | $180.00 | $220.00 |
| 79 | Removing and Disposing Box Beam Median Barrier End Assembly-Type C (606.7932) | EACH | 1 | $180.00 | $220.00 |
| 80 | Removing and Disposing Anchorage Units for HPBO(Mod) Corrugated Beam Guide Railing (606.7941) | EACH | 2 | $320.00 | $391.00 |
| 81 | (606.85020001) | 2 | $220.00 | $269.00 | |
| 82 | Transition from Box Beam Guide Rail to Full-Section Single-Slope Concrete Barrier (One- or Two-Way Operation) (606.8806) | EACH | 4 | $15,000 | $15,300 |
| 83 | Right-of Way Fencing (607.19) | LF | 1,056 | $28.00 | $28.00 |
| 84 | (607.31020010) | 1,169 | $60.00 | $80.00 | |
| 85 | (607.41010010) | 1,000 | $5.50 | $7.95 | |
| 86 | (607.99980007) | 1,058 | $13.00 | $20.00 | |
| 87 | Concrete Sidewalks and Driveways (608.0101) | CY | 1 | $7,500.00 | $5,970.00 |
| 88 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 250 | $750.00 | $900.00 |
| 89 | Compost (610.10) | CY | 1,558 | $50.00 | $73.20 |
| 90 | Weed Removal (610.13) | SY | 465,148 | $0.50 | $0.63 |
| 91 | Topsoil - Roadside (610.1402) | CY | 17,177 | $100.00 | $130.00 |
| 92 | (610.15120208) | 18,999 | $1.00 | $0.61 | |
| 93 | Turf Establishment - Roadside (610.1601) | SY | 123,283 | $0.98 | $2.50 |
| 94 | Turf Establishment – Nurse Crops (610.1606) | SY | 44,488 | $0.12 | $0.93 |
| 95 | (610.16093424) | 45,210 | $1.56 | $4.55 | |
| 96 | Watering Vegetation (610.19) | 1,000 GALLONS | 10,083 | $0.50 | $0.50 |
| 97 | Mowing (610.21) | SY | 98,071 | $0.20 | $0.25 |
| 98 | Improvement of Vegetated Areas (614.05) | SY | 450 | $12.00 | $37.80 |
| 99 | (617.01010024) | 10,000 | $1.25 | $1.90 | |
| 100 | (617.10000024) | 290 | $100.00 | $56.10 | |
| 101 | (617.11000024) | LS | 1 | $5,000.00 | $1,520.00 |
| 102 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $3,490,000 | $2,500,000 |
| 103 | Type III Construction Barricades (619.04) | EACH | 299 | $150.00 | $160.00 |
| 104 | (619.080101) | LF | 527,652 | $0.24 | $0.27 |
| 105 | (619.080102) | LF | 229,126 | $0.35 | $0.27 |
| 106 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 7,037 | $10.75 | $5.20 |
| 107 | (619.100101) | LF | 527,652 | $0.23 | $0.38 |
| 108 | (619.100102) | LF | 183,284 | $0.29 | $0.38 |
| 109 | (619.100103) | LF | 41,340 | $8.75 | $4.45 |
| 110 | (619.111111) | EACH | 19 | $7,000.00 | $12,600 |
| 111 | Temporary Glare Screen (619.12) | LF | 26,695 | $15.00 | $7.90 |
| 112 | Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613) | MONTH | 31 | $200.00 | $249.00 |
| 113 | Temporary Positive Barrier – Category 3 (Pinning Prohibited) (619.1713) | LF | 86,420 | $50.00 | $21.40 |
| 114 | Temporary Impact Attenuator - Redirective (Test Level 3) (619.1803) | EACH | 28 | $9,000.00 | $18,600 |
| 115 | Temporary Rumble Strips (619.22) | LF | 1,728 | $15.00 | $19.80 |
| 116 | Pavement Patching (Force Acount) (619.2601) | DOL | 150,000 | $1.00 | $1.00 |
| 117 | Stone Filling (Light) (620.03) | CY | 142 | $135.00 | $203.00 |
| 118 | Stone Filling (Medium) (620.04) | CY | 95 | $150.00 | $220.00 |
| 119 | Bedding Material, Type 2 (620.0802) | CY | 32 | $150.00 | $299.00 |
| 120 | (621.05020004) | 112,320 | $0.50 | $1.35 | |
| 121 | Crushed Stone (In-Place Measure) (623.12) | CY | 426 | $225.00 | $242.00 |
| 122 | Survey Operations (625.01) | LS | 1 | $300,000 | $561,312 |
| 123 | (625.130001) | EACH | 1 | $40,000 | $75,900 |
| 124 | (625.130002) | EACH | 1 | $40,000 | $75,900 |
| 125 | (627.50140008) | 67,429 | $4.00 | $0.25 | |
| 126 | Cleaning Existing Pavement and/or Shoulder (633.11) | SY | 233,472 | $0.15 | $0.01 |
| 127 | Stress Relieving Pavement Repairs (633.16) | SY | 7,176 | $90.00 | $75.00 |
| 128 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $5,000.00 | $3,780.00 |
| 129 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 30 | $3,000.00 | $6,460.00 |
| 130 | Rain Gauge (637.26) | EACH | 1 | $100.00 | $73.30 |
| 131 | Office Technology and Supplies (637.34) | DOL | 2,000 | $1.00 | $1.00 |
| 132 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 |
| 133 | Construction Testing supplies – Consumables (637.36) | DOL | 1,000 | $1.00 | $1.00 |
| 134 | (637.41000115) | 30 | $75.00 | $122.00 | |
| 135 | (637.41000215) | 30 | $75.00 | $122.00 | |
| 136 | (637.41000315) | 30 | $75.00 | $122.00 | |
| 137 | (639.21010011) | LS | 1 | $200,000 | $200,000 |
| 138 | (642.31400024) | 1,350 | $13.50 | $17.00 | |
| 139 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 8 | $60.00 | $73.30 |
| 140 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 1,839 | $40.00 | $48.80 |
| 141 | Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103) | SF | 2,357 | $36.00 | $44.00 |
| 142 | Type A Sign Posts (645.81) | EACH | 235 | $225.00 | $275.00 |
| 143 | High-Capacity Type A Sign Posts with Soil Plates Only (645.8106) | EACH | 3 | $1,200.00 | $1,470.00 |
| 144 | (645.81090003) | 50 | $48.00 | $58.60 | |
| 145 | (645.830203) | EACH | 4 | $2,700.00 | $3,300.00 |
| 146 | (645.830602) | EACH | 24 | $5,800.00 | $7,080.00 |
| 147 | (645.830701) | EACH | 2 | $7,300.00 | $8,910.00 |
| 148 | (645.830802) | EACH | 16 | $9,000.00 | $11,000 |
| 149 | Reference Marker Panel (646.21) | EACH | 96 | $35.00 | $42.70 |
| 150 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 1,296 | $20.00 | $24.40 |
| 151 | Steel Post, 2.0 lb/ft (646.32) | EACH | 1,023 | $65.00 | $79.40 |
| 152 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 38 | $200.00 | $244.00 |
| 153 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 14 | $70.00 | $85.50 |
| 154 | Remove and Dispose Sign Panel, Sign Panel Assembly Size III (Over 100 Square Feet) (647.53) | EACH | 15 | $700.00 | $855.00 |
| 155 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 122 | $65.00 | $79.40 |
| 156 | Remove and Dispose High Capacity Type A Ground Mounted Sign Support and Foundation (647.64) | EACH | 3 | $320.00 | $391.00 |
| 157 | Remove and Dispose Type B Ground Mounted Sign Support and Foundation (647.65) | EACH | 43 | $310.00 | $378.00 |
| 158 | (647.83001002) | 96 | $30.00 | $36.60 | |
| 159 | Milled-In Audible Roadway Delineators (MIARDs) (649.01) | LF | 98,800 | $0.40 | $0.38 |
| 160 | Pavement Ride Quality Adjustment to Asphalt Level 1 (653.1010) | QUALITY UNIT | 1,708 | $100.00 | $100.00 |
| 161 | Concrete Foundation for Impact Attenuators (654.05) | CY | 5 | $5,000.00 | $5,350.00 |
| 162 | Remove and Dispose Impact Attenuator Systems (654.0701) | EACH | 1 | $1,250.00 | $1,390.00 |
| 163 | Expendable Impact Attenuator , TL 2, > 2 ft up to 5 ft Obstruction Width (654.5022) | EACH | 2 | $50,000 | $40,200 |
| 164 | (670.03020007) | 12 | $6,528.00 | $8,120.00 | |
| 165 | (680.05060004) | 2 | $17,045 | $21,200 | |
| 166 | (680.05070004) | 1 | $6,536.00 | $8,130.00 | |
| 167 | Pole Excavation and Concrete Foundation (680.5001) | CY | 1 | $10,000 | $13,100 |
| 168 | (680.510501) | EACH | 3 | $2,722.00 | $3,380.00 |
| 169 | (680.51100010) | 2 | $131.00 | $163.00 | |
| 170 | (680.520106) | LF | 370 | $17.61 | $21.90 |
| 171 | (680.520203) | LF | 90 | $11.24 | $14.00 |
| 172 | (680.520204) | LF | 60 | $11.24 | $14.00 |
| 173 | Trenchless Installation Method for Conduit (680.5301) | LF | 270 | $76.36 | $94.90 |
| 174 | Inductance Loop Installation (680.54) | LF | 218 | $21.60 | $26.90 |
| 175 | (680.70070010) | 1 | $6,938.00 | $8,630.00 | |
| 176 | Inductance Loop Wire (680.72) | LF | 644 | $0.23 | $0.29 |
| 177 | (680.77000001) | LS | 1 | $1,423.00 | $1,770.00 |
| 178 | Breakaway Transformer Base (680.8223) | EACH | 1 | $500.00 | $622.00 |
| 179 | (680.90920008) | 1 | $1,619.00 | $2,010.00 | |
| 180 | Watertight Disconnect Box (680.9401) | EACH | 2 | $754.00 | $937.00 |
| 181 | Ground Wire (680.9403) | LF | 540 | $2.61 | $3.25 |
| 182 | (680.950106) | LF | 540 | $3.91 | $4.85 |
| 183 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $15.00 | $15.00 |
| 184 | (683.06010013) | 1 | $6,538.00 | $8,130.00 | |
| 185 | (683.17002211) | 1 | $12,000 | $13,700 | |
| 186 | (683.93090104) | 2 | $74,500 | $92,600 | |
| 187 | (685.16010014) | 187,310 | $1.25 | $1.20 | |
| 188 | (685.17010014) | 85,510 | $1.25 | $1.20 | |
| 189 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 5,811 | $2.25 | $5.45 |
| 190 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 20 | $140.00 | $315.00 |
| 191 | (691.04000020) | 70,000 | $1.00 | $1.00 | |
| 192 | Field Change Payment (FCP) (697.03) | DOL | 2,130,000 | $1.00 | $1.00 |
| 193 | Asphalt Price Adjustment (698.04) | DOL | 184,784.45 | $1.00 | $1.00 |
| 194 | Fuel Price Adjustment (698.05) | DOL | 64,472 | $1.00 | $1.00 |
| 195 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 196 | Mobilization (699.040001) | LS | 1 | $2,000,000 | $2,225,032 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 12, 2026. Compiled by Mirage Metrics.