NYSDOT contract D265768 bid tabulation
BRIDGE PROJECT - North Genesee Street Gateway, City of Utica. Let by New York State DOT on June 25, 2026, Oneida, Region 02. 4 bids received; low bid $62,519,104 by Cci Companies Inc.
- Owner
- New York State DOT
- Letting
- 25 JUN 2026
- Pay items
- 437
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Cci Companies Inc | $62,519,104 | Low |
| 2 | Lancaster Development and Tully Construction Co LLC | $77,868,474 | +25% |
| 3 | Cold Spring Construction Company | $80,095,185 | +28% |
| 4 | Sealand Contractors Corp. | $84,390,001 | +35% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Cci Companies Inc | 2. Lancaster Development and Tully Construction Co LLC | 3. Cold Spring Construction Company | 4. Sealand Contractors Corp. |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $92,272 | $6,590.00 | $5,000.00 | $50,000 |
| 2 | Clearing and Grubbing (201.07) | ACRE | 0.20 | $130,336 | $33,000 | $25,000 | $55,000 |
| 3 | (202.010001) | LS | 1 | $70,000 | $289,000 | $100,000 | $140,000 |
| 4 | (202.120001) | LS | 1 | $610,000 | $987,000 | $1,500,000 | $830,000 |
| 5 | (202.120002) | LS | 1 | $710,000 | $1,374,000 | $1,500,000 | $1,150,000 |
| 6 | Removal of Substructures (202.19) | CY | 2,314 | $125.00 | $537.00 | $250.00 | $450.00 |
| 7 | Unclassified Excavation and Disposal (203.02) | CY | 15,400 | $75.00 | $67.50 | $57.00 | $80.00 |
| 8 | Embankment In Place (203.03) | CY | 12,790 | $40.00 | $45.00 | $57.00 | $90.00 |
| 9 | Select Granular Fill (203.07) | CY | 7,000 | $45.00 | $75.00 | $60.00 | $100.00 |
| 10 | (203.08010017) | 434 | $210.00 | $149.00 | $148.00 | $260.00 | |
| 11 | Surface Settlement Gauges (203.10) | EACH | 4 | $1,500.00 | $1,090.00 | $800.00 | $7,000.00 |
| 12 | Applying Water (203.1601) | PDD | 5 | $1,600.00 | $1,810.00 | $2,100.00 | $1,500.00 |
| 13 | Select Structural Fill (203.21) | CY | 2,055 | $110.00 | $85.20 | $135.00 | $140.00 |
| 14 | (203.24010017) | 13 | $64.01 | $165.00 | $135.00 | $500.00 | |
| 15 | (203.98080015) | 13,500 | $9.46 | $4.30 | $7.50 | $7.00 | |
| 16 | Controlled Low Strength Material (CLSM) (204.01) | CY | 10 | $770.33 | $685.00 | $500.00 | $2,000.00 |
| 17 | (205.0201) | LS | 1 | $25,000 | $78,400 | $30,000 | $32,000 |
| 18 | Field Organic Vapor Monitoring of Contaminated Soil (205.03) | HR | 80 | $175.00 | $231.00 | $100.00 | $185.00 |
| 19 | (205.050201) | TON | 380 | $226.03 | $121.00 | $115.00 | $100.00 |
| 20 | Structure Excavation (206.01) | CY | 24,000 | $95.00 | $68.00 | $55.00 | $80.00 |
| 21 | Trench and Culvert Excavation (206.0201) | CY | 9,295 | $80.00 | $79.00 | $95.00 | $110.00 |
| 22 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 10,000 | $24.00 | $30.70 | $40.00 | $61.00 |
| 23 | Test Pit Excavation (206.05) | EACH | 10 | $3,000.00 | $2,080.00 | $2,500.00 | $3,500.00 |
| 24 | Geotextile Drainage (207.22) | SY | 260 | $7.93 | $4.55 | $7.50 | $12.00 |
| 25 | Geotextile Stabilization (207.24) | SY | 15,500 | $3.12 | $2.80 | $2.20 | $3.25 |
| 26 | Prefabricated Composite Structural Drain (207.26) | SY | 281 | $26.00 | $40.50 | $28.00 | $35.00 |
| 27 | Prefabricated Composite Integral Abutment Drain (207.27) | SY | 640 | $26.00 | $38.50 | $30.20 | $35.00 |
| 28 | (208.01000409) | 30 | $355.80 | $213.00 | $175.00 | $300.00 | |
| 29 | (208.01000709) | 1 | $4,727.00 | $224.00 | $150.00 | $600.00 | |
| 30 | Seed and Mulch – Temporary (209.1003) | SY | 2,700 | $1.25 | $1.60 | $0.90 | $1.30 |
| 31 | Check Dam, (Ditch Bottom Width 0.0 to 3′), Stone – Permanent (209.110601) | EACH | 3 | $2,733.25 | $1,880.00 | $525.00 | $3,000.00 |
| 32 | Turbidity Curtain – Temporary (209.1501) | LF | 1,855 | $25.00 | $48.20 | $47.00 | $35.00 |
| 33 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 3,600 | $4.25 | $7.90 | $4.25 | $5.15 |
| 34 | Rolled Erosion Control Product, Class II Type D, Intermediate (209.1904) | SY | 440 | $6.00 | $8.80 | $6.00 | $5.30 |
| 35 | Stabilized Construction Access (209.22) | SY | 4,000 | $18.79 | $69.60 | $19.00 | $85.00 |
| 36 | (209.23010009) | 8,000 | $8.43 | $12.10 | $9.00 | $11.00 | |
| 37 | (210.29050002) | 150,000 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 38 | Removal and Disposal of Bond Breaker/Filler ACM (BV14) (210.3312) | SF | 264 | $150.00 | $112.00 | $90.00 | $100.00 |
| 39 | Subbase Course, Type 2 (304.12) | CY | 9,335 | $83.31 | $128.00 | $115.00 | $110.00 |
| 40 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 1 | $105.00 | $105.00 | $105.00 | $105.00 |
| 41 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 88 | $105.00 | $105.00 | $105.00 | $105.00 |
| 42 | (404.1262) | TON | 3,500 | $150.00 | $200.00 | $124.50 | $195.00 |
| 43 | (404.2589) | TON | 3,500 | $130.00 | $165.00 | $123.50 | $210.00 |
| 44 | (404.3789) | TON | 5,100 | $125.00 | $128.00 | $118.00 | $150.00 |
| 45 | (407.01040009) | 2,700 | $4.00 | $21.50 | $11.00 | $27.00 | |
| 46 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 25,600 | $0.90 | $1.30 | $0.50 | $2.30 |
| 47 | (490.17011018) | 15,800 | $5.46 | $8.50 | $5.75 | $7.50 | |
| 48 | PCC Foundation for Pavement, PEM Concrete (503.1013) | CY | 140 | $1,027.86 | $1,170.00 | $600.00 | $1,250.00 |
| 49 | Cast-In-Place Concrete Piles (551.11) | LF | 26,250 | $90.00 | $179.00 | $51.00 | $135.00 |
| 50 | Furnishing Equipment for Driving Piles (551.13) | LS | 1 | $1,800,000 | $86,100 | $5,000,000 | $1,800,000 |
| 51 | Splices for CIP Piles (551.15) | EACH | 180 | $11.00 | $545.00 | $0.01 | $1.00 |
| 52 | Performance Concrete Quality Adjustment - Cast In Place Piles (551.9902) | QUALITY UNIT | 1 | $6.31 | $6.31 | $6.31 | $6.31 |
| 53 | Temporary Steel Sheeting (552.13) | SF | 1,554 | $95.00 | $150.00 | $125.00 | $100.00 |
| 54 | Shields and Shoring (552.17) | SF | 110,100 | $1.00 | $0.16 | $1.00 | $2.00 |
| 55 | (553.010001) | EACH | 1 | $155,000 | $922,000 | $3,000,000 | $200,000 |
| 56 | (553.010002) | EACH | 1 | $155,000 | $865,000 | $1,500,000 | $200,000 |
| 57 | (553.010003) | EACH | 1 | $125,000 | $361,000 | $750,000 | $200,000 |
| 58 | (553.010004) | EACH | 1 | $125,000 | $372,000 | $750,000 | $200,000 |
| 59 | (553.010005) | EACH | 1 | $185,000 | $857,000 | $750,000 | $50,000 |
| 60 | (553.010006) | EACH | 1 | $125,000 | $746,000 | $750,000 | $50,000 |
| 61 | (553.010007) | EACH | 1 | $150,000 | $319,000 | $750,000 | $50,000 |
| 62 | (553.010008) | EACH | 1 | $90,000 | $325,000 | $750,000 | $50,000 |
| 63 | (553.030001) | EACH | 1 | $90,000 | $59,000 | $1.00 | $10,000 |
| 64 | (554.3001) | SF | 5,290 | $90.00 | $125.00 | $55.00 | $125.00 |
| 65 | Fill Type Retaining Wall (0 – 6 ft.) (554.40) | SF | 280 | $125.00 | $158.00 | $200.00 | $160.00 |
| 66 | Footing Concrete, Performance (555.0011) | CY | 372 | $1,000.00 | $1,050.00 | $1,250.00 | $2,200.00 |
| 67 | Concrete for Structures, Performance (555.0021) | CY | 1,327 | $1,200.00 | $1,850.00 | $1,300.00 | $2,900.00 |
| 68 | (555.72940001) | 5,250 | $50.00 | $62.30 | $40.00 | $32.00 | |
| 69 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $5.50 | $5.50 | $5.50 | $5.50 |
| 70 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $6.00 | $6.00 | $6.00 | $6.00 |
| 71 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 225,608 | $2.25 | $2.40 | $2.70 | $3.00 |
| 72 | Stainless Steel Bar Reinforcement for Structures (556.0205) | LB | 33,339 | $4.10 | $5.40 | $4.50 | $5.00 |
| 73 | Stud Shear Connectors for Bridges (556.03) | EACH | 25,200 | $4.50 | $7.50 | $7.50 | $6.50 |
| 74 | (557.1012) | SY | 975 | $620.00 | $1,210.00 | $725.00 | $725.00 |
| 75 | (557.1112) | SY | 4,678 | $660.00 | $912.00 | $675.00 | $1,000.00 |
| 76 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 5,577 | $0.10 | $17.90 | $0.01 | $1.00 |
| 77 | Sidewalks and Safety Walks (557.30) | SY | 1,557 | $185.00 | $303.00 | $275.00 | $375.00 |
| 78 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $13.72 | $13.72 | $13.72 | $13.72 |
| 79 | Performance Concrete Quality Adjustment – Sidewalks and Safety Walks (557.9902) | QUALITY UNIT | 1 | $6.00 | $6.00 | $6.00 | $6.00 |
| 80 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 3,540 | $8.00 | $14.30 | $12.00 | $8.20 |
| 81 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 32,794 | $0.40 | $1.60 | $1.05 | $1.65 |
| 82 | Protective Sealing of New Structural Concrete (559.02) | SF | 28,498 | $0.50 | $5.40 | $1.70 | $5.00 |
| 83 | (559.90010011) | 1,223 | $6.00 | $49.00 | $13.00 | $70.00 | |
| 84 | (564.0501) | LS | 1 | $4,000,000 | $4,091,000 | $5,500,000 | $3,900,000 |
| 85 | (564.0502) | LS | 1 | $7,000,000 | $6,816,000 | $9,150,000 | $6,550,000 |
| 86 | Type M.R. Expansion Bearing (Over 900 k) (565.1525) | EACH | 10 | $13,000 | $17,400 | $13,000 | $20,000 |
| 87 | Rubber Impregnated Woven Cotton-Polyester Fabric (565.30) | EACH | 40 | $1,000.00 | $1,640.00 | $1,210.00 | $2,100.00 |
| 88 | Armorless Bridge Joint (567.60) | LF | 340 | $260.00 | $638.00 | $275.00 | $510.00 |
| 89 | Steel Bridge Railing (Four-Rail) (568.51) | LF | 1,044 | $315.00 | $421.00 | $340.00 | $410.00 |
| 90 | (568.51010003) | 1,044 | $115.00 | $138.00 | $110.00 | $116.00 | |
| 91 | Transition Bridge Railing (568.70) | LF | 288 | $190.00 | $233.00 | $185.00 | $227.00 |
| 92 | (568.70010003) | 256 | $96.00 | $120.00 | $96.00 | $101.00 | |
| 93 | Lead-Exposure Control Plan (570.01) | LS | 1 | $200.00 | $2,500.00 | $100.00 | $2,000.00 |
| 94 | Medical Testing (570.02) | DOL | 4,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 95 | Personal-Exposure-Monitoring Sample Analysis (570.03) | DOL | 4,500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 96 | Decontamination Facilities (570.04) | CALENDAR WEEK | 4 | $700.00 | $624.00 | $250.00 | $500.00 |
| 97 | (570.09) | LS | 1 | $500.00 | $1.25 | $1.00 | $1.00 |
| 98 | (570.10) | LS | 1 | $600.00 | $1.25 | $1.00 | $1.00 |
| 99 | Disposal of Hazardous Paint Removal Waste Containing Lead (571.03) | LB | 400 | $3.40 | $12.50 | $2.00 | $10.00 |
| 100 | (572.00020101) | LS | 1 | $950,000 | $1,044,000 | $900,000 | $970,000 |
| 101 | (572.00020201) | LS | 1 | $1,000,000 | $1,119,000 | $1,000,000 | $1,040,000 |
| 102 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 10 | $35.00 | $192.00 | $85.00 | $250.00 |
| 103 | (603.171416) | EACH | 3 | $1,500.00 | $981.00 | $8,000.00 | $1,500.00 |
| 104 | Concrete Collars (603.77) | EACH | 10 | $2,500.00 | $4,670.00 | $1,500.00 | $6,500.00 |
| 105 | (603.97000002) | 23 | $750.00 | $285.00 | $750.00 | $1,400.00 | |
| 106 | (603.9812) | LF | 115 | $65.00 | $61.00 | $75.00 | $225.00 |
| 107 | (603.9815) | LF | 690 | $95.00 | $76.70 | $100.00 | $130.00 |
| 108 | (603.9818) | LF | 510 | $125.00 | $92.40 | $150.00 | $140.00 |
| 109 | (603.9824) | LF | 290 | $80.00 | $122.00 | $100.00 | $240.00 |
| 110 | (603.9830) | LF | 30 | $160.00 | $161.00 | $200.00 | $300.00 |
| 111 | (603.99220015) | 215 | $40.00 | $79.80 | $50.00 | $220.00 | |
| 112 | (603.99230015) | 120 | $55.00 | $82.90 | $70.00 | $300.00 | |
| 113 | (603.99250015) | 260 | $55.00 | $102.00 | $75.00 | $310.00 | |
| 114 | (604.070201) | EACH | 16 | $3,800.00 | $1,520.00 | $4,250.00 | $9,500.00 |
| 115 | (604.070202) | EACH | 11 | $6,700.00 | $6,080.00 | $7,500.00 | $11,500 |
| 116 | (604.070203) | EACH | 1 | $22,500 | $10,800 | $14,500 | $22,000 |
| 117 | (604.070204) | EACH | 3 | $2,500.00 | $3,320.00 | $6,000.00 | $7,000.00 |
| 118 | (604.07260011) | 26 | $2,500.00 | $1,620.00 | $2,500.00 | $2,000.00 | |
| 119 | (604.300632) | LF | 12 | $1,300.00 | $816.00 | $1,500.00 | $3,200.00 |
| 120 | (604.300673) | LF | 61 | $1,000.00 | $788.00 | $1,100.00 | $3,300.00 |
| 121 | (604.301873) | LF | 35 | $850.00 | $599.00 | $1,100.00 | $3,300.00 |
| 122 | (605.03010015) | 6,900 | $20.00 | $37.50 | $39.01 | $36.00 | |
| 123 | Underdrain Filter, Type II (605.1001) | CY | 40 | $30.00 | $195.00 | $145.00 | $300.00 |
| 124 | (605.1601) | LF | 150 | $11.00 | $13.50 | $7.00 | $40.00 |
| 125 | Box Beam Guide Railing (606.10) | LF | 340 | $52.50 | $65.60 | $58.00 | $65.00 |
| 126 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 196 | $59.00 | $73.70 | $59.00 | $70.00 |
| 127 | Box Beam Guide Railing (Shop Mitered) (606.100003) | LF | 24 | $140.00 | $175.00 | $140.00 | $170.00 |
| 128 | Box Beam End Piece (606.120101) | EACH | 3 | $775.00 | $968.00 | $775.00 | $900.00 |
| 129 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 8 | $2,150.00 | $2,690.00 | $2,150.00 | $2,650.00 |
| 130 | Single-Slope Concrete Median Barrier (Optional) (606.3041) | LF | 20 | $250.00 | $334.00 | $275.00 | $1,500.00 |
| 131 | Single-Slope Concrete Median Barrier (Ramped Terminal) (606.3045) | EACH | 1 | $12,000 | $9,460.00 | $10,000 | $30,000 |
| 132 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 790 | $20.00 | $5.95 | $10.00 | $6.00 |
| 133 | Removing and Disposing Concrete Barrier (606.75) | LF | 41 | $120.00 | $56.50 | $30.00 | $200.00 |
| 134 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 9 | $1,500.00 | $219.00 | $300.00 | $200.00 |
| 135 | Transition between Standard (NJ) Concrete Barrier and Single-Slope Concrete Barrier (606.9001) | EACH | 1 | $13,000 | $9,130.00 | $10,000 | $30,000 |
| 136 | (607.08000010) | 300 | $105.00 | $128.00 | $102.50 | $110.00 | |
| 137 | (607.41010010) | 5,250 | $12.00 | $4.00 | $5.00 | $6.00 | |
| 138 | Concrete Sidewalks and Driveways (608.0101) | CY | 60 | $1,100.00 | $1,640.00 | $1,075.00 | $2,500.00 |
| 139 | (608.01020005) | 138 | $1,400.00 | $2,820.00 | $2,125.00 | $3,500.00 | |
| 140 | (608.01060415) | 34,300 | $19.00 | $25.90 | $22.50 | $35.00 | |
| 141 | (608.01060615) | 5,800 | $35.00 | $34.10 | $32.50 | $48.00 | |
| 142 | (608.01070415) | 13,000 | $25.00 | $27.40 | $25.50 | $115.00 | |
| 143 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 800 | $280.00 | $299.00 | $339.00 | $370.00 |
| 144 | (608.10080008) | 500 | $60.00 | $66.30 | $48.00 | $70.00 | |
| 145 | Surface-Applied Detectable Warning Units (608.20) | SY | 11 | $300.00 | $573.00 | $460.00 | $850.00 |
| 146 | Stone Curb – Near Vertical Face (NVF) (609.0212) | LF | 7,010 | $80.00 | $97.30 | $75.00 | $98.00 |
| 147 | Stone Curb – Bridge (Type F1) (609.0302) | LF | 2,344 | $50.00 | $73.70 | $45.50 | $95.00 |
| 148 | (609.0401) | LF | 1,200 | $70.00 | $77.00 | $62.00 | $160.00 |
| 149 | (609.0403) | LF | 160 | $60.00 | $104.00 | $96.00 | $175.00 |
| 150 | Compost (610.10) | CY | 145 | $175.00 | $144.00 | $125.00 | $280.00 |
| 151 | Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101) | CY | 34 | $125.00 | $162.00 | $100.00 | $132.00 |
| 152 | Permeable Weed Control Landscape Fabric (610.1201) | SY | 145 | $14.00 | $18.20 | $3.00 | $15.00 |
| 153 | Topsoil - Roadside (610.1402) | CY | 1,379 | $145.00 | $182.00 | $39.00 | $230.00 |
| 154 | (610.15180208) | 2,346 | $7.50 | $1.30 | $3.00 | $18.00 | |
| 155 | Turf Establishment -Lawns (610.1602) | SY | 11,020 | $1.10 | $2.90 | $1.20 | $1.10 |
| 156 | Turf Establishment – Nurse Crops (610.1606) | SY | 230 | $0.50 | $2.15 | $1.00 | $0.53 |
| 157 | Wildflower Seeding (610.17) | SY | 230 | $8.00 | $10.30 | $5.00 | $8.50 |
| 158 | Sodding (610.18) | SY | 100 | $24.00 | $31.00 | $20.00 | $56.00 |
| 159 | Watering Vegetation (610.19) | 1,000 GALLONS | 320 | $10.00 | $13.00 | $30.00 | $10.00 |
| 160 | Mowing (610.21) | SY | 41,060 | $0.40 | $0.45 | $0.40 | $0.38 |
| 161 | (611.0161) | EACH | 25 | $620.00 | $798.00 | $850.00 | $640.00 |
| 162 | (611.0171) | EACH | 1 | $800.00 | $1,030.00 | $1,065.00 | $830.00 |
| 163 | (611.0201) | EACH | 15 | $610.00 | $789.00 | $700.00 | $635.00 |
| 164 | (611.0241) | EACH | 11 | $620.00 | $804.00 | $450.00 | $645.00 |
| 165 | (611.0351) | EACH | 3 | $656.00 | $851.00 | $600.00 | $685.00 |
| 166 | (611.0361) | EACH | 2 | $743.00 | $964.00 | $600.00 | $775.00 |
| 167 | (611.0432) | EACH | 134 | $70.00 | $90.20 | $95.00 | $72.00 |
| 168 | (611.0442) | EACH | 22 | $75.00 | $97.10 | $110.00 | $78.00 |
| 169 | (611.0481) | EACH | 5 | $385.00 | $499.00 | $450.00 | $400.00 |
| 170 | (611.0531) | EACH | 24 | $105.00 | $136.00 | $135.00 | $110.00 |
| 171 | (611.0541) | EACH | 30 | $111.00 | $144.00 | $135.00 | $115.00 |
| 172 | (611.0721) | EACH | 270 | $20.50 | $26.30 | $35.00 | $21.00 |
| 173 | (611.0742) | EACH | 30 | $30.00 | $37.20 | $45.00 | $30.00 |
| 174 | (611.19010024) | 25 | $185.00 | $239.00 | $67.50 | $185.00 | |
| 175 | (611.19020024) | 1 | $240.00 | $309.00 | $100.00 | $239.00 | |
| 176 | (611.19030024) | 5 | $200.00 | $255.00 | $67.50 | $197.00 | |
| 177 | (611.19040024) | 26 | $25.00 | $28.90 | $13.50 | $22.50 | |
| 178 | (611.19050024) | 54 | $34.00 | $43.50 | $4.05 | $34.00 | |
| 179 | (611.19070024) | 291 | $9.00 | $11.00 | $2.70 | $8.50 | |
| 180 | Rodent Guard (611.21) | EACH | 40 | $20.00 | $25.90 | $4.40 | $21.00 |
| 181 | Care of Trees up to 12” Diam. at Breast Height – Pruning (614.0411) | EACH | 1 | $1,100.00 | $1,320.00 | $1,000.00 | $500.00 |
| 182 | Improvement of Vegetated Areas (614.05) | SY | 8 | $100.00 | $344.00 | $350.00 | $700.00 |
| 183 | (614.060204) | EACH | 11 | $1,100.00 | $923.00 | $700.00 | $1,100.00 |
| 184 | (614.060304) | EACH | 7 | $1,750.00 | $1,850.00 | $1,400.00 | $2,100.00 |
| 185 | (614.060404) | EACH | 3 | $2,250.00 | $3,690.00 | $2,800.00 | $2,700.00 |
| 186 | (615.01010110) | 4 | $3,500.00 | $2,530.00 | $3,100.00 | $3,700.00 | |
| 187 | (615.02060124) | 1 | $5,200.00 | $1,100.00 | $725.00 | $1,900.00 | |
| 188 | (615.03070108) | 5 | $1,250.00 | $2,090.00 | $1,400.00 | $3,800.00 | |
| 189 | (615.03070208) | 2 | $1,650.00 | $1,100.00 | $1,400.00 | $1,000.00 | |
| 190 | (615.08010005) | 5 | $7,800.00 | $4,180.00 | $5,000.00 | $4,500.00 | |
| 191 | (615.08020005) | 1 | $5,500.00 | $4,070.00 | $4,000.00 | $3,800.00 | |
| 192 | (615.10010108) | 5 | $14,000 | $7,310.00 | $8,000.00 | $2,400.00 | |
| 193 | (615.10010208) | 2 | $7,500.00 | $2,490.00 | $8,000.00 | $3,100.00 | |
| 194 | (615.99060104) | 2 | $9,000.00 | $2,520.00 | $2,750.00 | $4,000.00 | |
| 195 | (616.08000024) | 300 | $13.00 | $15.20 | $15.00 | $12.20 | |
| 196 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $1,000,000 | $2,649,000 | $2,500,000 | $4,040,762 |
| 197 | Type III Construction Barricades (619.04) | EACH | 20 | $550.00 | $219.00 | $125.00 | $600.00 |
| 198 | Temporary Business Signs (619.0701) | SF | 900 | $26.00 | $60.00 | $16.00 | $75.00 |
| 199 | (619.080102) | LF | 19,600 | $1.50 | $1.70 | $1.35 | $1.45 |
| 200 | (619.080106) | LF | 2,600 | $1.70 | $1.85 | $1.50 | $3.80 |
| 201 | (619.080202) | EACH | 52 | $140.00 | $156.00 | $125.00 | $135.00 |
| 202 | (619.080206) | EACH | 9 | $140.00 | $156.00 | $125.00 | $275.00 |
| 203 | (619.100101) | LF | 2,201 | $0.85 | $0.94 | $0.75 | $0.80 |
| 204 | (619.100102) | LF | 18,800 | $1.00 | $1.25 | $1.00 | $1.05 |
| 205 | (619.100104) | LF | 3,700 | $3.50 | $4.35 | $5.25 | $7.65 |
| 206 | (619.100202) | EACH | 46 | $250.00 | $306.00 | $245.00 | $260.00 |
| 207 | (619.100204) | EACH | 9 | $140.00 | $156.00 | $350.00 | $405.00 |
| 208 | (619.10060020) | 2 | $33,500 | $3,200.00 | $15,000 | $40,000 | |
| 209 | (619.110713) | EACH | 8 | $14,000 | $30,300 | $23,000 | $27,000 |
| 210 | (619.110733) | EACH | 2 | $45,000 | $44,400 | $23,000 | $45,000 |
| 211 | (619.130101) | EACH | 1 | $45,000 | $53,800 | $65,000 | $53,000 |
| 212 | Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613) | MONTH | 28 | $195.00 | $250.00 | $375.00 | $2,450.00 |
| 213 | Temporary Positive Barrier – Category 4 (Pinning Permitted) (619.1714) | LF | 620 | $25.00 | $108.00 | $55.00 | $90.00 |
| 214 | Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715) | LF | 620 | $35.00 | $122.00 | $50.00 | $140.00 |
| 215 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 108 | $135.00 | $96.50 | $50.00 | $160.00 |
| 216 | Traffic Control Supervisor (619.25) | MONTH | 48 | $10,000 | $10,000 | $0.01 | $28,000 |
| 217 | Stone Filling (Medium) (620.04) | CY | 15 | $350.00 | $191.00 | $170.00 | $500.00 |
| 218 | Stone Filling (Heavy) (620.05) | CY | 5,058 | $150.00 | $140.00 | $135.00 | $330.00 |
| 219 | Bedding Material, Type 1 (620.0801) | CY | 1,216 | $202.00 | $178.00 | $140.00 | $255.00 |
| 220 | Bedding Material, Type 2 (620.0802) | CY | 818 | $180.00 | $180.00 | $140.00 | $245.00 |
| 221 | Concrete Block Slope Paving (620.09) | SY | 375 | $450.00 | $592.00 | $450.00 | $510.00 |
| 222 | Cleaning Closed Drainage Systems (621.03) | LF | 3,660 | $5.50 | $11.80 | $5.25 | $5.50 |
| 223 | Cleaning Drainage Structures (621.04) | EACH | 14 | $310.00 | $574.00 | $350.00 | $325.00 |
| 224 | (621.51000015) | 550 | $18.00 | $27.40 | $22.00 | $50.00 | |
| 225 | Crushed Stone (In-Place Measure) (623.12) | CY | 43 | $220.00 | $201.00 | $160.00 | $250.00 |
| 226 | (624.01) | 200 | $57.00 | $97.40 | $86.00 | $120.00 | |
| 227 | Survey Operations (625.01) | LS | 1 | $350,000 | $924,213 | $900,000 | $300,000 |
| 228 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 36 | $550.00 | $568.00 | $350.00 | $550.00 |
| 229 | Permanent Survey Markers (625.06) | EACH | 2 | $6,000.00 | $1,620.00 | $1,550.00 | $5,600.00 |
| 230 | (625.130001) | EACH | 1 | $35,000 | $140,000 | $60,000 | $40,000 |
| 231 | (625.130002) | EACH | 1 | $35,000 | $140,000 | $60,000 | $40,000 |
| 232 | (625.160001) | EACH | 1 | $41,000 | $140,000 | $85,000 | $6,000.00 |
| 233 | (625.170001) | EACH | 1 | $2,600.00 | $1,630.00 | $12,500 | $10,000 |
| 234 | (627.50140008) | 17,100 | $15.00 | $5.90 | $9.00 | $10.00 | |
| 235 | Field Laboratory (637.01) | EACH | 1 | $12,000 | $112,000 | $12,000 | $2,500.00 |
| 236 | Concrete Cylinder Curing Equipment (637.04) | EACH | 2 | $2,363.50 | $7,280.00 | $325.00 | $10,000 |
| 237 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 36 | $6,000.00 | $9,310.00 | $3,150.00 | $5,500.00 |
| 238 | Rain Gauge (637.26) | EACH | 1 | $600.00 | $74.90 | $100.00 | $400.00 |
| 239 | Office Technology and Supplies (637.34) | DOL | 4,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 240 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 241 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 242 | (639.21010011) | LS | 1 | $210,000 | $200,000 | $200,000 | $200,000 |
| 243 | (640.25000010) | 140 | $5.66 | $6.25 | $5.00 | $5.50 | |
| 244 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 1,250 | $46.98 | $51.80 | $41.50 | $48.00 |
| 245 | Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103) | SF | 39 | $46.98 | $51.80 | $41.50 | $48.00 |
| 246 | Type A Sign Posts (645.81) | EACH | 210 | $254.71 | $281.00 | $225.00 | $265.00 |
| 247 | (645.81090003) | 26 | $72.45 | $79.90 | $64.00 | $68.00 | |
| 248 | (645.830202) | EACH | 2 | $4,245.23 | $4,680.00 | $3,750.00 | $4,400.00 |
| 249 | Reference Marker Panel (646.21) | EACH | 14 | $50.10 | $55.30 | $44.25 | $47.00 |
| 250 | (647.01000102) | 1 | $2,460.05 | $1,980.00 | $3,500.00 | $3,000.00 | |
| 251 | (647.01000202) | 1 | $2,460.05 | $1,980.00 | $3,500.00 | $5,000.00 | |
| 252 | (647.01000302) | 1 | $2,460.05 | $1,980.00 | $3,500.00 | $5,000.00 | |
| 253 | (647.01000402) | 1 | $2,460.05 | $9,100.00 | $3,500.00 | $6,000.00 | |
| 254 | (647.18010108) | 1 | $2,623.10 | $11,200 | $15,000 | $6,000.00 | |
| 255 | (647.18010208) | 1 | $2,623.10 | $11,200 | $15,000 | $6,000.00 | |
| 256 | (647.18010308) | 1 | $2,623.10 | $4,210.00 | $15,000 | $6,000.00 | |
| 257 | (647.18010408) | 1 | $2,623.10 | $4,210.00 | $15,000 | $6,000.00 | |
| 258 | (647.18010508) | 1 | $2,623.10 | $11,300 | $15,000 | $9,000.00 | |
| 259 | (647.18010608) | 1 | $5,246.20 | $11,300 | $15,000 | $12,500 | |
| 260 | (647.18010708) | 1 | $2,623.10 | $11,600 | $15,000 | $6,000.00 | |
| 261 | (647.18010808) | 1 | $2,623.10 | $11,300 | $15,000 | $6,000.00 | |
| 262 | (647.18010908) | 1 | $2,623.10 | $11,300 | $15,000 | $6,000.00 | |
| 263 | (647.18011008) | 1 | $2,623.10 | $11,300 | $15,000 | $6,000.00 | |
| 264 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 1 | $226.42 | $250.00 | $200.00 | $240.00 |
| 265 | Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41) | EACH | 23 | $45.28 | $50.00 | $40.00 | $45.00 |
| 266 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 104 | $50.94 | $56.20 | $45.00 | $50.00 |
| 267 | Remove and Dispose Type B Ground Mounted Sign Support and Foundation (647.65) | EACH | 3 | $583.01 | $643.00 | $515.00 | $550.00 |
| 268 | (655.05010010) | 2 | $4,928.54 | $1,950.00 | $4,650.00 | $7,000.00 | |
| 269 | (655.05020010) | 4 | $3,169.59 | $2,640.00 | $3,250.00 | $3,500.00 | |
| 270 | (655.07010010) | 2 | $4,107.78 | $3,460.00 | $4,000.00 | $4,200.00 | |
| 271 | (655.07030010) | 2 | $5,961.22 | $4,010.00 | $4,500.00 | $4,700.00 | |
| 272 | Cast Frame F1, UnMountable Curb Box CU1 & Reticuline Grate G1 (655.0704) | EACH | 10 | $5,384.57 | $3,430.00 | $4,000.00 | $4,200.00 |
| 273 | Cast Frame F3, UnMountable Curb Box CU3 & Reticuline Grate G3 (655.0706) | EACH | 20 | $4,886.03 | $3,970.00 | $4,500.00 | $4,700.00 |
| 274 | Telescoping Manhole Frame & Cover (655.1302) | EACH | 25 | $4,731.86 | $3,730.00 | $4,500.00 | $4,500.00 |
| 275 | (657.03480005) | 1 | $45,005 | $43,100 | $75,000 | $36,000 | |
| 276 | (660.78060001) | 560 | $329.46 | $220.00 | $250.00 | $220.00 | |
| 277 | (662.01000107) | LS | 1 | $7,867.82 | $8,900.00 | $5,500.00 | $7,600.00 |
| 278 | (662.01000207) | LS | 1 | $28,301 | $32,000 | $5,500.00 | $8,500.00 |
| 279 | (662.01000307) | LS | 1 | $63,848 | $72,200 | $5,500.00 | $38,000 |
| 280 | (662.01000407) | LS | 1 | $49,471 | $55,900 | $5,500.00 | $70,000 |
| 281 | (662.01000507) | LS | 1 | $64,414 | $72,800 | $5,500.00 | $124,000 |
| 282 | (662.01000607) | LS | 1 | $7,924.41 | $8,960.00 | $5,500.00 | $40,000 |
| 283 | (662.01000707) | LS | 1 | $70,188 | $79,400 | $5,500.00 | $123,000 |
| 284 | (662.01000807) | LS | 1 | $33,509 | $37,900 | $5,500.00 | $42,500 |
| 285 | (662.01000907) | LS | 1 | $33,509 | $37,900 | $5,500.00 | $39,500 |
| 286 | (662.01001007) | LS | 1 | $76,527 | $86,500 | $5,500.00 | $133,000 |
| 287 | (662.01001107) | LS | 1 | $13,811 | $15,600 | $5,500.00 | $27,000 |
| 288 | (662.01001207) | LS | 1 | $46,754 | $52,900 | $5,500.00 | $59,500 |
| 289 | (662.78010002) | LS | 1 | $60,000 | $84,700 | $30,000 | $110,000 |
| 290 | (663.0104) | LF | 46 | $139.26 | $154.00 | $150.00 | $400.00 |
| 291 | (663.0106) | LF | 95 | $128.30 | $128.00 | $175.00 | $185.00 |
| 292 | (663.0108) | LF | 193 | $111.50 | $225.00 | $120.00 | $205.00 |
| 293 | (663.0110) | LF | 466 | $184.91 | $237.00 | $200.00 | $260.00 |
| 294 | (663.0120) | LF | 626 | $293.44 | $398.00 | $400.00 | $560.00 |
| 295 | (663.0124) | LF | 863 | $518.14 | $421.00 | $550.00 | $870.00 |
| 296 | (663.0130) | LF | 674 | $500.00 | $654.00 | $650.00 | $920.00 |
| 297 | (663.0524) | LF | 1,405 | $1,500.00 | $1,590.00 | $1,200.00 | $2,000.00 |
| 298 | (663.0604) | LF | 11 | $263.39 | $145.00 | $250.00 | $200.00 |
| 299 | (663.0607) | LF | 179 | $227.28 | $110.00 | $275.00 | $210.00 |
| 300 | (663.09040001) | 170 | $50.06 | $117.00 | $75.00 | $260.00 | |
| 301 | (663.09060001) | 660 | $32.10 | $70.00 | $12.00 | $120.00 | |
| 302 | (663.1004) | EACH | 1 | $2,010.42 | $4,820.00 | $3,000.00 | $3,000.00 |
| 303 | (663.1006) | EACH | 7 | $2,337.08 | $5,500.00 | $7,500.00 | $3,500.00 |
| 304 | (663.1008) | EACH | 2 | $5,000.00 | $6,390.00 | $10,000 | $4,400.00 |
| 305 | (663.1010) | EACH | 5 | $5,000.00 | $7,700.00 | $11,000 | $6,000.00 |
| 306 | (663.1020) | EACH | 6 | $40,000 | $43,000 | $40,000 | $36,000 |
| 307 | (663.1024) | EACH | 13 | $50,000 | $53,700 | $57,500 | $49,000 |
| 308 | (663.1030) | EACH | 10 | $75,000 | $69,700 | $80,000 | $75,000 |
| 309 | (663.1301) | EACH | 1 | $11,388 | $9,360.00 | $13,000 | $14,000 |
| 310 | (663.1302) | EACH | 1 | $11,388 | $9,360.00 | $13,000 | $14,000 |
| 311 | (663.1303) | EACH | 1 | $11,388 | $9,360.00 | $13,000 | $14,000 |
| 312 | (663.1304) | EACH | 1 | $11,388 | $9,360.00 | $13,000 | $14,000 |
| 313 | (663.1305) | EACH | 1 | $11,388 | $9,360.00 | $13,000 | $14,000 |
| 314 | (663.1306) | EACH | 1 | $11,388 | $9,360.00 | $13,000 | $14,000 |
| 315 | (663.1307) | EACH | 1 | $11,388 | $9,360.00 | $13,000 | $14,000 |
| 316 | (663.1804) | EACH | 1 | $1,935.24 | $1,580.00 | $3,000.00 | $1,500.00 |
| 317 | (663.1808) | EACH | 1 | $8,170.29 | $1,800.00 | $10,000 | $2,100.00 |
| 318 | (663.1810) | EACH | 5 | $4,124.76 | $2,000.00 | $5,000.00 | $2,300.00 |
| 319 | (663.1820) | EACH | 3 | $9,244.39 | $4,990.00 | $10,000 | $4,000.00 |
| 320 | (663.1830) | EACH | 3 | $22,451 | $5,350.00 | $25,000 | $11,000 |
| 321 | Iron Water Main Fittings (3 - 8 inch diameter) (663.2001) | LB | 600 | $4.80 | $15.50 | $5.00 | $25.00 |
| 322 | Iron Water Main Fittings (10 - 16 inch diameter) (663.2002) | LB | 1,310 | $10.42 | $13.30 | $13.00 | $25.00 |
| 323 | Iron Water Main Fittings (18 inch diameter and larger) (663.2003) | LB | 34,815 | $11.72 | $12.40 | $16.00 | $20.00 |
| 324 | (663.2104) | EACH | 2 | $586.39 | $180.00 | $650.00 | $700.00 |
| 325 | (663.2106) | EACH | 14 | $808.79 | $270.00 | $1,000.00 | $800.00 |
| 326 | (663.2108) | EACH | 16 | $856.50 | $291.00 | $1,150.00 | $1,000.00 |
| 327 | (663.2110) | EACH | 34 | $1,094.50 | $353.00 | $1,300.00 | $1,200.00 |
| 328 | (663.2120) | EACH | 35 | $2,863.08 | $960.00 | $3,000.00 | $2,000.00 |
| 329 | (663.2124) | EACH | 48 | $3,554.28 | $1,220.00 | $3,650.00 | $2,500.00 |
| 330 | (663.2130) | EACH | 35 | $9,394.98 | $3,040.00 | $10,250 | $5,500.00 |
| 331 | (663.2504) | EACH | 1 | $1,751.95 | $2,040.00 | $1,500.00 | $1,700.00 |
| 332 | (663.2507) | EACH | 4 | $1,355.12 | $2,670.00 | $1,500.00 | $2,300.00 |
| 333 | (663.2604) | EACH | 1 | $454.68 | $1,380.00 | $500.00 | $1,900.00 |
| 334 | (663.2606) | EACH | 4 | $365.75 | $1,750.00 | $600.00 | $2,700.00 |
| 335 | Adjust Existing Valve Box Elevation (663.33) | EACH | 9 | $750.98 | $348.00 | $1,000.00 | $2,000.00 |
| 336 | Adjust Existing Curb Box Elevation (663.35) | EACH | 7 | $965.55 | $285.00 | $600.00 | $900.00 |
| 337 | (663.4120) | LF | 1,350 | $101.70 | $79.00 | $75.00 | $120.00 |
| 338 | (663.4130) | LF | 600 | $117.34 | $90.00 | $100.00 | $170.00 |
| 339 | Remove and Dispose of Existing Water Valve & Valve Box (663.42) | EACH | 35 | $2,064.93 | $471.00 | $50.00 | $1,200.00 |
| 340 | Remove and Store Existing Hydrant (663.46) | EACH | 5 | $1,869.01 | $549.00 | $1,500.00 | $2,300.00 |
| 341 | (664.40600006) | 58 | $1,164.40 | $600.00 | $1,000.00 | $3,600.00 | |
| 342 | (664.40609608) | 9 | $11,753 | $8,550.00 | $10,000 | $17,500 | |
| 343 | (665.98000002) | LS | 1 | $100,867 | $114,000 | $50,000 | $139,000 |
| 344 | (670.0106) | EACH | 84 | $2,603.73 | $2,940.00 | $4,400.00 | $3,000.00 |
| 345 | (670.0109) | EACH | 6 | $3,622.59 | $4,100.00 | $6,000.00 | $3,700.00 |
| 346 | (670.01101302) | 24 | $1,245.27 | $1,410.00 | $1,500.00 | $455.00 | |
| 347 | (670.02404202) | 88 | $10,981 | $12,400 | $8,500.00 | $9,200.00 | |
| 348 | (670.03070008) | 18 | $724.52 | $1,150.00 | $1,100.00 | $675.00 | |
| 349 | (670.03214102) | 1 | $13,358 | $15,100 | $7,000.00 | $11,500 | |
| 350 | (670.1406) | EACH | 8 | $967.91 | $1,090.00 | $2,200.00 | $555.00 |
| 351 | (670.1530) | EACH | 9 | $2,909.39 | $3,290.00 | $4,750.00 | $3,300.00 |
| 352 | (670.1706) | EACH | 9 | $1,567.90 | $1,770.00 | $2,750.00 | $1,160.00 |
| 353 | Breakaway Transformer Base (Aluminum) (670.19) | EACH | 9 | $1,132.06 | $1,280.00 | $1,800.00 | $960.00 |
| 354 | (670.2602) | LF | 11,300 | $12.57 | $14.20 | $10.50 | $7.15 |
| 355 | (670.30013402) | 4 | $10,755 | $12,200 | $3,500.00 | $7,700.00 | |
| 356 | Pullboxes 5 to 7 1/2 cubic feet, inside volume (Lighting) (670.3006) | EACH | 32 | $1,777.33 | $2,010.00 | $2,500.00 | $2,450.00 |
| 357 | (670.42110002) | 8 | $23,320 | $26,400 | $17,000 | $22,000 | |
| 358 | Photoelectric Controls (670.60) | EACH | 24 | $616.97 | $698.00 | $1,600.00 | $54.00 |
| 359 | (670.7004) | LF | 43,300 | $3.68 | $4.15 | $2.00 | $3.60 |
| 360 | Ground Wire No. 6 AWG. (670.7501) | LF | 14,300 | $3.57 | $4.05 | $2.35 | $2.20 |
| 361 | Remove and Store Lamppost Assembly (670.80) | EACH | 10 | $616.97 | $698.00 | $1,500.00 | $1,200.00 |
| 362 | Remove and Dispose of Lamppost Assembly (670.81) | EACH | 18 | $803.76 | $909.00 | $1,300.00 | $900.00 |
| 363 | Remove Lamppost Foundation (670.82) | EACH | 29 | $803.76 | $909.00 | $1,400.00 | $770.00 |
| 364 | Relocate Lamppost Assembly (670.90) | EACH | 5 | $2,349.02 | $2,660.00 | $3,250.00 | $1,650.00 |
| 365 | (670.91000010) | 13 | $1,828.28 | $2,070.00 | $2,750.00 | $780.00 | |
| 366 | Performance Concrete Quality Adjustment (670.99) | QUALITY UNIT | 1 | $12.14 | $12.14 | $12.14 | $12.14 |
| 367 | (680.01990003) | 9 | $3,622.59 | $4,100.00 | $1,100.00 | $640.00 | |
| 368 | (680.02990003) | 4 | $3,622.59 | $4,100.00 | $1,700.00 | $1,000.00 | |
| 369 | (680.05010007) | 4 | $31,132 | $35,200 | $30,000 | $28,500 | |
| 370 | (680.05020007) | 2 | $5,332.00 | $6,030.00 | $6,000.00 | $4,900.00 | |
| 371 | (680.05040004) | 7 | $4,698.05 | $5,310.00 | $4,000.00 | $4,500.00 | |
| 372 | (680.06030110) | 22 | $226.42 | $256.00 | $45.00 | $410.00 | |
| 373 | (680.06040110) | 12 | $3,396.18 | $3,840.00 | $3,000.00 | $800.00 | |
| 374 | (680.10000007) | 2 | $7,935.74 | $8,970.00 | $8,500.00 | $5,850.00 | |
| 375 | (680.11131014) | 17 | $6,888.58 | $7,790.00 | $19,000 | $11,000 | |
| 376 | (680.11141014) | 5 | $9,209.30 | $10,400 | $21,000 | $12,700 | |
| 377 | Pole Excavation and Concrete Foundation (680.5001) | CY | 67 | $2,875.43 | $3,250.00 | $2,500.00 | $2,900.00 |
| 378 | Concrete Base for Controller Cabinet (680.5002) | EACH | 8 | $2,932.04 | $3,320.00 | $4,850.00 | $4,900.00 |
| 379 | Concrete Work Pad (5 feet x 5 feet x 4 inches) (680.5003) | EACH | 9 | $1,375.45 | $1,560.00 | $4,686.47 | $970.00 |
| 380 | (680.51000010) | 3 | $622.63 | $704.00 | $475.00 | $1,150.00 | |
| 381 | (680.510501) | EACH | 23 | $1,692.43 | $1,910.00 | $2,100.00 | $2,600.00 |
| 382 | (680.520106) | LF | 1,600 | $21.39 | $24.20 | $30.00 | $25.00 |
| 383 | (680.520108) | LF | 1,250 | $36.51 | $41.30 | $37.00 | $50.00 |
| 384 | (680.520110) | LF | 110 | $63.40 | $71.70 | $54.00 | $67.00 |
| 385 | Trenchless Installation Method for Conduit (680.5301) | LF | 329 | $137.64 | $128.00 | $185.00 | $105.00 |
| 386 | Emergency Pre-emption System (680.56) | EACH | 4 | $11,887 | $13,400 | $11,000 | $8,500.00 |
| 387 | (680.600832) | EACH | 1 | $21,962 | $24,800 | $22,000 | $11,500 |
| 388 | (680.601132) | EACH | 4 | $22,188 | $25,100 | $25,000 | $14,500 |
| 389 | (680.601231) | EACH | 1 | $22,754 | $25,700 | $30,000 | $14,400 |
| 390 | (680.601831) | EACH | 1 | $31,471 | $35,600 | $35,000 | $16,400 |
| 391 | (680.622162) | EACH | 1 | $37,018 | $41,900 | $32,000 | $29,800 |
| 392 | (680.632057) | EACH | 1 | $55,584 | $62,900 | $55,000 | $45,700 |
| 393 | (680.632065) | EACH | 1 | $57,509 | $65,000 | $55,000 | $48,000 |
| 394 | Dual Span Wire Assembly with Upper Tether Wire (680.7002) | EACH | 6 | $4,058.43 | $4,590.00 | $8,000.00 | $8,200.00 |
| 395 | Riser Assembly, 2-inch Diameter (680.700606) | EACH | 8 | $894.33 | $1,010.00 | $2,000.00 | $1,160.00 |
| 396 | (680.730314) | LF | 900 | $3.29 | $3.70 | $4.00 | $5.15 |
| 397 | (680.730514) | LF | 10,500 | $4.36 | $4.95 | $4.00 | $5.35 |
| 398 | (680.730714) | LF | 220 | $5.49 | $6.20 | $5.25 | $6.00 |
| 399 | (680.78000001) | LS | 1 | $14,264 | $16,100 | $25,000 | $48,000 |
| 400 | (680.79000001) | LS | 1 | $21,849 | $24,700 | $45,000 | $13,000 |
| 401 | Battery Backup System (680.80) | EACH | 4 | $7,018.77 | $7,940.00 | $8,000.00 | $9,200.00 |
| 402 | (680.80324515) | 8 | $2,716.95 | $3,070.00 | $3,750.00 | $2,950.00 | |
| 403 | (680.80324708) | 8 | $1,403.76 | $1,590.00 | $2,403.99 | $1,350.00 | |
| 404 | Install Ball/Arrow LED Traffic Signal Module (680.810308) | EACH | 114 | $84.90 | $96.00 | $400.00 | $29.00 |
| 405 | Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601) | EACH | 114 | $203.77 | $230.00 | $200.00 | $310.00 |
| 406 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 39 | $679.24 | $768.00 | $350.00 | $685.00 |
| 407 | Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105) | EACH | 1 | $350.94 | $397.00 | $375.00 | $210.00 |
| 408 | Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106) | EACH | 2 | $271.70 | $307.00 | $300.00 | $410.00 |
| 409 | Pedestrian Signal Bracket Mount Assembly (680.8141) | EACH | 1 | $339.62 | $384.00 | $500.00 | $630.00 |
| 410 | Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001) | EACH | 1 | $401.89 | $455.00 | $425.00 | $250.00 |
| 411 | (680.8151) | EACH | 1 | $1,641.48 | $1,860.00 | $2,000.00 | $1,550.00 |
| 412 | Backplates for Traffic Signal Heads (680.8199) | EACH | 47 | $373.58 | $423.00 | $500.00 | $350.00 |
| 413 | (680.8204) | EACH | 12 | $984.89 | $1,110.00 | $1,200.00 | $940.00 |
| 414 | (680.8207) | EACH | 9 | $939.61 | $1,060.00 | $1,150.00 | $1,200.00 |
| 415 | (680.82220002) | 4 | $5,094.26 | $5,760.00 | $9,500.00 | $5,500.00 | |
| 416 | (680.82400010) | 1 | $4,528.24 | $5,120.00 | $1,250.00 | $2,800.00 | |
| 417 | (680.94400008) | 4 | $2,320.72 | $2,620.00 | $7,500.00 | $4,050.00 | |
| 418 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 4 | $735.84 | $832.00 | $1,500.00 | $430.00 |
| 419 | (680.950306) | LF | 400 | $3.68 | $4.15 | $10.25 | $9.00 |
| 420 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $11.00 | $11.00 | $11.00 | $11.00 |
| 421 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 9,600 | $1.41 | $1.55 | $1.25 | $1.32 |
| 422 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 11,000 | $1.41 | $1.55 | $1.25 | $1.32 |
| 423 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 15,700 | $3.11 | $3.45 | $2.75 | $2.90 |
| 424 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 4,100 | $3.11 | $3.45 | $2.75 | $2.90 |
| 425 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 52 | $141.51 | $156.00 | $125.00 | $132.00 |
| 426 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 50 | $277.35 | $306.00 | $245.00 | $258.00 |
| 427 | (690.01000105) | LS | 1 | $100,000 | $87,400 | $70,000 | $100,000 |
| 428 | (690.01000205) | LS | 1 | $3,091.17 | $4,000.00 | $2,000.00 | $4,000.00 |
| 429 | (690.01000305) | LS | 1 | $62,695 | $71,800 | $10,000 | $65,000 |
| 430 | (690.01000405) | LS | 1 | $6,656.95 | $4,320.00 | $2,000.00 | $6,000.00 |
| 431 | (690.01000505) | LS | 1 | $22,000 | $25,500 | $35,000 | $30,000 |
| 432 | (691.04000020) | 168,000 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 433 | Field Change Payment (FCP) (697.03) | DOL | 1,669,056 | $1.00 | $1.00 | $1.00 | $1.00 |
| 434 | Asphalt Price Adjustment (698.04) | DOL | 3,621 | $1.00 | $1.00 | $1.00 | $1.00 |
| 435 | Fuel Price Adjustment (698.05) | DOL | 6,045 | $1.00 | $1.00 | $1.00 | $1.00 |
| 436 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 437 | Mobilization (699.040001) | LS | 1 | $2,400,000 | $2,987,741 | $3,080,000 | $3,245,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of June 25, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.