BRIDGE PROJECT - North Genesee Street Gateway, City of Utica. Let by New York State DOT on June 25, 2026, Oneida, Region 02. 4 bids received; low bid $62,519,104 by Cci Companies Inc.

Owner
New York State DOT
Letting
25 JUN 2026
Pay items
437
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Cci Companies Inc$62,519,104Low
2Lancaster Development and Tully Construction Co LLC$77,868,474+25%
3Cold Spring Construction Company$80,095,185+28%
4Sealand Contractors Corp.$84,390,001+35%
NYSDOT contract D265768: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Cci Companies Inc2. Lancaster Development and Tully Construction Co LLC3. Cold Spring Construction Company4. Sealand Contractors Corp.
1Clearing and Grubbing (201.06)LS1$92,272$6,590.00$5,000.00$50,000
2Clearing and Grubbing (201.07)ACRE0.20$130,336$33,000$25,000$55,000
3 (202.010001)LS1$70,000$289,000$100,000$140,000
4 (202.120001)LS1$610,000$987,000$1,500,000$830,000
5 (202.120002)LS1$710,000$1,374,000$1,500,000$1,150,000
6Removal of Substructures (202.19)CY2,314$125.00$537.00$250.00$450.00
7Unclassified Excavation and Disposal (203.02)CY15,400$75.00$67.50$57.00$80.00
8Embankment In Place (203.03)CY12,790$40.00$45.00$57.00$90.00
9Select Granular Fill (203.07)CY7,000$45.00$75.00$60.00$100.00
10 (203.08010017)434$210.00$149.00$148.00$260.00
11Surface Settlement Gauges (203.10)EACH4$1,500.00$1,090.00$800.00$7,000.00
12Applying Water (203.1601)PDD5$1,600.00$1,810.00$2,100.00$1,500.00
13Select Structural Fill (203.21)CY2,055$110.00$85.20$135.00$140.00
14 (203.24010017)13$64.01$165.00$135.00$500.00
15 (203.98080015)13,500$9.46$4.30$7.50$7.00
16Controlled Low Strength Material (CLSM) (204.01)CY10$770.33$685.00$500.00$2,000.00
17 (205.0201)LS1$25,000$78,400$30,000$32,000
18Field Organic Vapor Monitoring of Contaminated Soil (205.03)HR80$175.00$231.00$100.00$185.00
19 (205.050201)TON380$226.03$121.00$115.00$100.00
20Structure Excavation (206.01)CY24,000$95.00$68.00$55.00$80.00
21Trench and Culvert Excavation (206.0201)CY9,295$80.00$79.00$95.00$110.00
22Conduit Excavation and Backfill including Surface Restoration (206.03)LF10,000$24.00$30.70$40.00$61.00
23Test Pit Excavation (206.05)EACH10$3,000.00$2,080.00$2,500.00$3,500.00
24Geotextile Drainage (207.22)SY260$7.93$4.55$7.50$12.00
25Geotextile Stabilization (207.24)SY15,500$3.12$2.80$2.20$3.25
26Prefabricated Composite Structural Drain (207.26)SY281$26.00$40.50$28.00$35.00
27Prefabricated Composite Integral Abutment Drain (207.27)SY640$26.00$38.50$30.20$35.00
28 (208.01000409)30$355.80$213.00$175.00$300.00
29 (208.01000709)1$4,727.00$224.00$150.00$600.00
30Seed and Mulch – Temporary (209.1003)SY2,700$1.25$1.60$0.90$1.30
31Check Dam, (Ditch Bottom Width 0.0 to 3′), Stone – Permanent (209.110601)EACH3$2,733.25$1,880.00$525.00$3,000.00
32Turbidity Curtain – Temporary (209.1501)LF1,855$25.00$48.20$47.00$35.00
33Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301)SY3,600$4.25$7.90$4.25$5.15
34Rolled Erosion Control Product, Class II Type D, Intermediate (209.1904)SY440$6.00$8.80$6.00$5.30
35Stabilized Construction Access (209.22)SY4,000$18.79$69.60$19.00$85.00
36 (209.23010009)8,000$8.43$12.10$9.00$11.00
37 (210.29050002)150,000$1.00$1.00$1.00$1.00
38Removal and Disposal of Bond Breaker/Filler ACM (BV14) (210.3312)SF264$150.00$112.00$90.00$100.00
39Subbase Course, Type 2 (304.12)CY9,335$83.31$128.00$115.00$110.00
40Pavement Density Quality Adjustment to Asphalt Items (404.0002)QUALITY UNIT1$105.00$105.00$105.00$105.00
41Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003)QUALITY UNIT88$105.00$105.00$105.00$105.00
42 (404.1262)TON3,500$150.00$200.00$124.50$195.00
43 (404.2589)TON3,500$130.00$165.00$123.50$210.00
44 (404.3789)TON5,100$125.00$128.00$118.00$150.00
45 (407.01040009)2,700$4.00$21.50$11.00$27.00
46Asphalt Pavement Joint Adhesive (418.7603)LF25,600$0.90$1.30$0.50$2.30
47 (490.17011018)15,800$5.46$8.50$5.75$7.50
48PCC Foundation for Pavement, PEM Concrete (503.1013)CY140$1,027.86$1,170.00$600.00$1,250.00
49Cast-In-Place Concrete Piles (551.11)LF26,250$90.00$179.00$51.00$135.00
50Furnishing Equipment for Driving Piles (551.13)LS1$1,800,000$86,100$5,000,000$1,800,000
51Splices for CIP Piles (551.15)EACH180$11.00$545.00$0.01$1.00
52Performance Concrete Quality Adjustment - Cast In Place Piles (551.9902)QUALITY UNIT1$6.31$6.31$6.31$6.31
53Temporary Steel Sheeting (552.13)SF1,554$95.00$150.00$125.00$100.00
54Shields and Shoring (552.17)SF110,100$1.00$0.16$1.00$2.00
55 (553.010001)EACH1$155,000$922,000$3,000,000$200,000
56 (553.010002)EACH1$155,000$865,000$1,500,000$200,000
57 (553.010003)EACH1$125,000$361,000$750,000$200,000
58 (553.010004)EACH1$125,000$372,000$750,000$200,000
59 (553.010005)EACH1$185,000$857,000$750,000$50,000
60 (553.010006)EACH1$125,000$746,000$750,000$50,000
61 (553.010007)EACH1$150,000$319,000$750,000$50,000
62 (553.010008)EACH1$90,000$325,000$750,000$50,000
63 (553.030001)EACH1$90,000$59,000$1.00$10,000
64 (554.3001)SF5,290$90.00$125.00$55.00$125.00
65Fill Type Retaining Wall (0 – 6 ft.) (554.40)SF280$125.00$158.00$200.00$160.00
66Footing Concrete, Performance (555.0011)CY372$1,000.00$1,050.00$1,250.00$2,200.00
67Concrete for Structures, Performance (555.0021)CY1,327$1,200.00$1,850.00$1,300.00$2,900.00
68 (555.72940001)5,250$50.00$62.30$40.00$32.00
69Performance Concrete Quality Adjustment – Footing Concrete (555.9901)QUALITY UNIT1$5.50$5.50$5.50$5.50
70Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT1$6.00$6.00$6.00$6.00
71Epoxy-Coated Bar Reinforcement for Structures (556.0202)LB225,608$2.25$2.40$2.70$3.00
72Stainless Steel Bar Reinforcement for Structures (556.0205)LB33,339$4.10$5.40$4.50$5.00
73Stud Shear Connectors for Bridges (556.03)EACH25,200$4.50$7.50$7.50$6.50
74 (557.1012)SY975$620.00$1,210.00$725.00$725.00
75 (557.1112)SY4,678$660.00$912.00$675.00$1,000.00
76Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29)SY5,577$0.10$17.90$0.01$1.00
77Sidewalks and Safety Walks (557.30)SY1,557$185.00$303.00$275.00$375.00
78Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901)QUALITY UNIT1$13.72$13.72$13.72$13.72
79Performance Concrete Quality Adjustment – Sidewalks and Safety Walks (557.9902)QUALITY UNIT1$6.00$6.00$6.00$6.00
80Longitudinal Sawcut Grooving of Structural Slab Surface (558.02)SY3,540$8.00$14.30$12.00$8.20
81Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01)SF32,794$0.40$1.60$1.05$1.65
82Protective Sealing of New Structural Concrete (559.02)SF28,498$0.50$5.40$1.70$5.00
83 (559.90010011)1,223$6.00$49.00$13.00$70.00
84 (564.0501)LS1$4,000,000$4,091,000$5,500,000$3,900,000
85 (564.0502)LS1$7,000,000$6,816,000$9,150,000$6,550,000
86Type M.R. Expansion Bearing (Over 900 k) (565.1525)EACH10$13,000$17,400$13,000$20,000
87Rubber Impregnated Woven Cotton-Polyester Fabric (565.30)EACH40$1,000.00$1,640.00$1,210.00$2,100.00
88Armorless Bridge Joint (567.60)LF340$260.00$638.00$275.00$510.00
89Steel Bridge Railing (Four-Rail) (568.51)LF1,044$315.00$421.00$340.00$410.00
90 (568.51010003)1,044$115.00$138.00$110.00$116.00
91Transition Bridge Railing (568.70)LF288$190.00$233.00$185.00$227.00
92 (568.70010003)256$96.00$120.00$96.00$101.00
93Lead-Exposure Control Plan (570.01)LS1$200.00$2,500.00$100.00$2,000.00
94Medical Testing (570.02)DOL4,000$1.00$1.00$1.00$1.00
95Personal-Exposure-Monitoring Sample Analysis (570.03)DOL4,500$1.00$1.00$1.00$1.00
96Decontamination Facilities (570.04)CALENDAR WEEK4$700.00$624.00$250.00$500.00
97 (570.09)LS1$500.00$1.25$1.00$1.00
98 (570.10)LS1$600.00$1.25$1.00$1.00
99Disposal of Hazardous Paint Removal Waste Containing Lead (571.03)LB400$3.40$12.50$2.00$10.00
100 (572.00020101)LS1$950,000$1,044,000$900,000$970,000
101 (572.00020201)LS1$1,000,000$1,119,000$1,000,000$1,040,000
102Drilling and Grouting Bolts or Reinforcing Bars (586.0201)EACH10$35.00$192.00$85.00$250.00
103 (603.171416)EACH3$1,500.00$981.00$8,000.00$1,500.00
104Concrete Collars (603.77)EACH10$2,500.00$4,670.00$1,500.00$6,500.00
105 (603.97000002)23$750.00$285.00$750.00$1,400.00
106 (603.9812)LF115$65.00$61.00$75.00$225.00
107 (603.9815)LF690$95.00$76.70$100.00$130.00
108 (603.9818)LF510$125.00$92.40$150.00$140.00
109 (603.9824)LF290$80.00$122.00$100.00$240.00
110 (603.9830)LF30$160.00$161.00$200.00$300.00
111 (603.99220015)215$40.00$79.80$50.00$220.00
112 (603.99230015)120$55.00$82.90$70.00$300.00
113 (603.99250015)260$55.00$102.00$75.00$310.00
114 (604.070201)EACH16$3,800.00$1,520.00$4,250.00$9,500.00
115 (604.070202)EACH11$6,700.00$6,080.00$7,500.00$11,500
116 (604.070203)EACH1$22,500$10,800$14,500$22,000
117 (604.070204)EACH3$2,500.00$3,320.00$6,000.00$7,000.00
118 (604.07260011)26$2,500.00$1,620.00$2,500.00$2,000.00
119 (604.300632)LF12$1,300.00$816.00$1,500.00$3,200.00
120 (604.300673)LF61$1,000.00$788.00$1,100.00$3,300.00
121 (604.301873)LF35$850.00$599.00$1,100.00$3,300.00
122 (605.03010015)6,900$20.00$37.50$39.01$36.00
123Underdrain Filter, Type II (605.1001)CY40$30.00$195.00$145.00$300.00
124 (605.1601)LF150$11.00$13.50$7.00$40.00
125Box Beam Guide Railing (606.10)LF340$52.50$65.60$58.00$65.00
126Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002)LF196$59.00$73.70$59.00$70.00
127Box Beam Guide Railing (Shop Mitered) (606.100003)LF24$140.00$175.00$140.00$170.00
128Box Beam End Piece (606.120101)EACH3$775.00$968.00$775.00$900.00
129Box Beam Guide Railing End Assembly Type IIA (606.120201)EACH8$2,150.00$2,690.00$2,150.00$2,650.00
130Single-Slope Concrete Median Barrier (Optional) (606.3041)LF20$250.00$334.00$275.00$1,500.00
131Single-Slope Concrete Median Barrier (Ramped Terminal) (606.3045)EACH1$12,000$9,460.00$10,000$30,000
132Removing and Disposing Box Beam Guide Railing (606.73)LF790$20.00$5.95$10.00$6.00
133Removing and Disposing Concrete Barrier (606.75)LF41$120.00$56.50$30.00$200.00
134Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920)EACH9$1,500.00$219.00$300.00$200.00
135Transition between Standard (NJ) Concrete Barrier and Single-Slope Concrete Barrier (606.9001)EACH1$13,000$9,130.00$10,000$30,000
136 (607.08000010)300$105.00$128.00$102.50$110.00
137 (607.41010010)5,250$12.00$4.00$5.00$6.00
138Concrete Sidewalks and Driveways (608.0101)CY60$1,100.00$1,640.00$1,075.00$2,500.00
139 (608.01020005)138$1,400.00$2,820.00$2,125.00$3,500.00
140 (608.01060415)34,300$19.00$25.90$22.50$35.00
141 (608.01060615)5,800$35.00$34.10$32.50$48.00
142 (608.01070415)13,000$25.00$27.40$25.50$115.00
143Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON800$280.00$299.00$339.00$370.00
144 (608.10080008)500$60.00$66.30$48.00$70.00
145Surface-Applied Detectable Warning Units (608.20)SY11$300.00$573.00$460.00$850.00
146Stone Curb – Near Vertical Face (NVF) (609.0212)LF7,010$80.00$97.30$75.00$98.00
147Stone Curb – Bridge (Type F1) (609.0302)LF2,344$50.00$73.70$45.50$95.00
148 (609.0401)LF1,200$70.00$77.00$62.00$160.00
149 (609.0403)LF160$60.00$104.00$96.00$175.00
150Compost (610.10)CY145$175.00$144.00$125.00$280.00
151Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101)CY34$125.00$162.00$100.00$132.00
152Permeable Weed Control Landscape Fabric (610.1201)SY145$14.00$18.20$3.00$15.00
153Topsoil - Roadside (610.1402)CY1,379$145.00$182.00$39.00$230.00
154 (610.15180208)2,346$7.50$1.30$3.00$18.00
155Turf Establishment -Lawns (610.1602)SY11,020$1.10$2.90$1.20$1.10
156Turf Establishment – Nurse Crops (610.1606)SY230$0.50$2.15$1.00$0.53
157Wildflower Seeding (610.17)SY230$8.00$10.30$5.00$8.50
158Sodding (610.18)SY100$24.00$31.00$20.00$56.00
159Watering Vegetation (610.19)1,000 GALLONS320$10.00$13.00$30.00$10.00
160Mowing (610.21)SY41,060$0.40$0.45$0.40$0.38
161 (611.0161)EACH25$620.00$798.00$850.00$640.00
162 (611.0171)EACH1$800.00$1,030.00$1,065.00$830.00
163 (611.0201)EACH15$610.00$789.00$700.00$635.00
164 (611.0241)EACH11$620.00$804.00$450.00$645.00
165 (611.0351)EACH3$656.00$851.00$600.00$685.00
166 (611.0361)EACH2$743.00$964.00$600.00$775.00
167 (611.0432)EACH134$70.00$90.20$95.00$72.00
168 (611.0442)EACH22$75.00$97.10$110.00$78.00
169 (611.0481)EACH5$385.00$499.00$450.00$400.00
170 (611.0531)EACH24$105.00$136.00$135.00$110.00
171 (611.0541)EACH30$111.00$144.00$135.00$115.00
172 (611.0721)EACH270$20.50$26.30$35.00$21.00
173 (611.0742)EACH30$30.00$37.20$45.00$30.00
174 (611.19010024)25$185.00$239.00$67.50$185.00
175 (611.19020024)1$240.00$309.00$100.00$239.00
176 (611.19030024)5$200.00$255.00$67.50$197.00
177 (611.19040024)26$25.00$28.90$13.50$22.50
178 (611.19050024)54$34.00$43.50$4.05$34.00
179 (611.19070024)291$9.00$11.00$2.70$8.50
180Rodent Guard (611.21)EACH40$20.00$25.90$4.40$21.00
181Care of Trees up to 12” Diam. at Breast Height – Pruning (614.0411)EACH1$1,100.00$1,320.00$1,000.00$500.00
182Improvement of Vegetated Areas (614.05)SY8$100.00$344.00$350.00$700.00
183 (614.060204)EACH11$1,100.00$923.00$700.00$1,100.00
184 (614.060304)EACH7$1,750.00$1,850.00$1,400.00$2,100.00
185 (614.060404)EACH3$2,250.00$3,690.00$2,800.00$2,700.00
186 (615.01010110)4$3,500.00$2,530.00$3,100.00$3,700.00
187 (615.02060124)1$5,200.00$1,100.00$725.00$1,900.00
188 (615.03070108)5$1,250.00$2,090.00$1,400.00$3,800.00
189 (615.03070208)2$1,650.00$1,100.00$1,400.00$1,000.00
190 (615.08010005)5$7,800.00$4,180.00$5,000.00$4,500.00
191 (615.08020005)1$5,500.00$4,070.00$4,000.00$3,800.00
192 (615.10010108)5$14,000$7,310.00$8,000.00$2,400.00
193 (615.10010208)2$7,500.00$2,490.00$8,000.00$3,100.00
194 (615.99060104)2$9,000.00$2,520.00$2,750.00$4,000.00
195 (616.08000024)300$13.00$15.20$15.00$12.20
196Basic Work Zone Traffic Control (619.01)LS1$1,000,000$2,649,000$2,500,000$4,040,762
197Type III Construction Barricades (619.04)EACH20$550.00$219.00$125.00$600.00
198Temporary Business Signs (619.0701)SF900$26.00$60.00$16.00$75.00
199 (619.080102)LF19,600$1.50$1.70$1.35$1.45
200 (619.080106)LF2,600$1.70$1.85$1.50$3.80
201 (619.080202)EACH52$140.00$156.00$125.00$135.00
202 (619.080206)EACH9$140.00$156.00$125.00$275.00
203 (619.100101)LF2,201$0.85$0.94$0.75$0.80
204 (619.100102)LF18,800$1.00$1.25$1.00$1.05
205 (619.100104)LF3,700$3.50$4.35$5.25$7.65
206 (619.100202)EACH46$250.00$306.00$245.00$260.00
207 (619.100204)EACH9$140.00$156.00$350.00$405.00
208 (619.10060020)2$33,500$3,200.00$15,000$40,000
209 (619.110713)EACH8$14,000$30,300$23,000$27,000
210 (619.110733)EACH2$45,000$44,400$23,000$45,000
211 (619.130101)EACH1$45,000$53,800$65,000$53,000
212Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613)MONTH28$195.00$250.00$375.00$2,450.00
213Temporary Positive Barrier – Category 4 (Pinning Permitted) (619.1714)LF620$25.00$108.00$55.00$90.00
214Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715)LF620$35.00$122.00$50.00$140.00
215Warning Lights on Temporary Positive Barriers (619.1719)EACH108$135.00$96.50$50.00$160.00
216Traffic Control Supervisor (619.25)MONTH48$10,000$10,000$0.01$28,000
217Stone Filling (Medium) (620.04)CY15$350.00$191.00$170.00$500.00
218Stone Filling (Heavy) (620.05)CY5,058$150.00$140.00$135.00$330.00
219Bedding Material, Type 1 (620.0801)CY1,216$202.00$178.00$140.00$255.00
220Bedding Material, Type 2 (620.0802)CY818$180.00$180.00$140.00$245.00
221Concrete Block Slope Paving (620.09)SY375$450.00$592.00$450.00$510.00
222Cleaning Closed Drainage Systems (621.03)LF3,660$5.50$11.80$5.25$5.50
223Cleaning Drainage Structures (621.04)EACH14$310.00$574.00$350.00$325.00
224 (621.51000015)550$18.00$27.40$22.00$50.00
225Crushed Stone (In-Place Measure) (623.12)CY43$220.00$201.00$160.00$250.00
226 (624.01)200$57.00$97.40$86.00$120.00
227Survey Operations (625.01)LS1$350,000$924,213$900,000$300,000
228Steel Pin and Cap Right of Way Markers (625.05)EACH36$550.00$568.00$350.00$550.00
229Permanent Survey Markers (625.06)EACH2$6,000.00$1,620.00$1,550.00$5,600.00
230 (625.130001)EACH1$35,000$140,000$60,000$40,000
231 (625.130002)EACH1$35,000$140,000$60,000$40,000
232 (625.160001)EACH1$41,000$140,000$85,000$6,000.00
233 (625.170001)EACH1$2,600.00$1,630.00$12,500$10,000
234 (627.50140008)17,100$15.00$5.90$9.00$10.00
235Field Laboratory (637.01)EACH1$12,000$112,000$12,000$2,500.00
236Concrete Cylinder Curing Equipment (637.04)EACH2$2,363.50$7,280.00$325.00$10,000
237Engineer’s Field Office – Type 3 (637.13)MONTH36$6,000.00$9,310.00$3,150.00$5,500.00
238Rain Gauge (637.26)EACH1$600.00$74.90$100.00$400.00
239Office Technology and Supplies (637.34)DOL4,000$1.00$1.00$1.00$1.00
240Partnering Workshop (637.35)DOL5,000$1.00$1.00$1.00$1.00
241Construction Testing supplies – Consumables (637.36)DOL100$1.00$1.00$1.00$1.00
242 (639.21010011)LS1$210,000$200,000$200,000$200,000
243 (640.25000010)140$5.66$6.25$5.00$5.50
244Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF1,250$46.98$51.80$41.50$48.00
245Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103)SF39$46.98$51.80$41.50$48.00
246Type A Sign Posts (645.81)EACH210$254.71$281.00$225.00$265.00
247 (645.81090003)26$72.45$79.90$64.00$68.00
248 (645.830202)EACH2$4,245.23$4,680.00$3,750.00$4,400.00
249Reference Marker Panel (646.21)EACH14$50.10$55.30$44.25$47.00
250 (647.01000102)1$2,460.05$1,980.00$3,500.00$3,000.00
251 (647.01000202)1$2,460.05$1,980.00$3,500.00$5,000.00
252 (647.01000302)1$2,460.05$1,980.00$3,500.00$5,000.00
253 (647.01000402)1$2,460.05$9,100.00$3,500.00$6,000.00
254 (647.18010108)1$2,623.10$11,200$15,000$6,000.00
255 (647.18010208)1$2,623.10$11,200$15,000$6,000.00
256 (647.18010308)1$2,623.10$4,210.00$15,000$6,000.00
257 (647.18010408)1$2,623.10$4,210.00$15,000$6,000.00
258 (647.18010508)1$2,623.10$11,300$15,000$9,000.00
259 (647.18010608)1$5,246.20$11,300$15,000$12,500
260 (647.18010708)1$2,623.10$11,600$15,000$6,000.00
261 (647.18010808)1$2,623.10$11,300$15,000$6,000.00
262 (647.18010908)1$2,623.10$11,300$15,000$6,000.00
263 (647.18011008)1$2,623.10$11,300$15,000$6,000.00
264Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH1$226.42$250.00$200.00$240.00
265Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41)EACH23$45.28$50.00$40.00$45.00
266Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH104$50.94$56.20$45.00$50.00
267Remove and Dispose Type B Ground Mounted Sign Support and Foundation (647.65)EACH3$583.01$643.00$515.00$550.00
268 (655.05010010)2$4,928.54$1,950.00$4,650.00$7,000.00
269 (655.05020010)4$3,169.59$2,640.00$3,250.00$3,500.00
270 (655.07010010)2$4,107.78$3,460.00$4,000.00$4,200.00
271 (655.07030010)2$5,961.22$4,010.00$4,500.00$4,700.00
272Cast Frame F1, UnMountable Curb Box CU1 & Reticuline Grate G1 (655.0704)EACH10$5,384.57$3,430.00$4,000.00$4,200.00
273Cast Frame F3, UnMountable Curb Box CU3 & Reticuline Grate G3 (655.0706)EACH20$4,886.03$3,970.00$4,500.00$4,700.00
274Telescoping Manhole Frame & Cover (655.1302)EACH25$4,731.86$3,730.00$4,500.00$4,500.00
275 (657.03480005)1$45,005$43,100$75,000$36,000
276 (660.78060001)560$329.46$220.00$250.00$220.00
277 (662.01000107)LS1$7,867.82$8,900.00$5,500.00$7,600.00
278 (662.01000207)LS1$28,301$32,000$5,500.00$8,500.00
279 (662.01000307)LS1$63,848$72,200$5,500.00$38,000
280 (662.01000407)LS1$49,471$55,900$5,500.00$70,000
281 (662.01000507)LS1$64,414$72,800$5,500.00$124,000
282 (662.01000607)LS1$7,924.41$8,960.00$5,500.00$40,000
283 (662.01000707)LS1$70,188$79,400$5,500.00$123,000
284 (662.01000807)LS1$33,509$37,900$5,500.00$42,500
285 (662.01000907)LS1$33,509$37,900$5,500.00$39,500
286 (662.01001007)LS1$76,527$86,500$5,500.00$133,000
287 (662.01001107)LS1$13,811$15,600$5,500.00$27,000
288 (662.01001207)LS1$46,754$52,900$5,500.00$59,500
289 (662.78010002)LS1$60,000$84,700$30,000$110,000
290 (663.0104)LF46$139.26$154.00$150.00$400.00
291 (663.0106)LF95$128.30$128.00$175.00$185.00
292 (663.0108)LF193$111.50$225.00$120.00$205.00
293 (663.0110)LF466$184.91$237.00$200.00$260.00
294 (663.0120)LF626$293.44$398.00$400.00$560.00
295 (663.0124)LF863$518.14$421.00$550.00$870.00
296 (663.0130)LF674$500.00$654.00$650.00$920.00
297 (663.0524)LF1,405$1,500.00$1,590.00$1,200.00$2,000.00
298 (663.0604)LF11$263.39$145.00$250.00$200.00
299 (663.0607)LF179$227.28$110.00$275.00$210.00
300 (663.09040001)170$50.06$117.00$75.00$260.00
301 (663.09060001)660$32.10$70.00$12.00$120.00
302 (663.1004)EACH1$2,010.42$4,820.00$3,000.00$3,000.00
303 (663.1006)EACH7$2,337.08$5,500.00$7,500.00$3,500.00
304 (663.1008)EACH2$5,000.00$6,390.00$10,000$4,400.00
305 (663.1010)EACH5$5,000.00$7,700.00$11,000$6,000.00
306 (663.1020)EACH6$40,000$43,000$40,000$36,000
307 (663.1024)EACH13$50,000$53,700$57,500$49,000
308 (663.1030)EACH10$75,000$69,700$80,000$75,000
309 (663.1301)EACH1$11,388$9,360.00$13,000$14,000
310 (663.1302)EACH1$11,388$9,360.00$13,000$14,000
311 (663.1303)EACH1$11,388$9,360.00$13,000$14,000
312 (663.1304)EACH1$11,388$9,360.00$13,000$14,000
313 (663.1305)EACH1$11,388$9,360.00$13,000$14,000
314 (663.1306)EACH1$11,388$9,360.00$13,000$14,000
315 (663.1307)EACH1$11,388$9,360.00$13,000$14,000
316 (663.1804)EACH1$1,935.24$1,580.00$3,000.00$1,500.00
317 (663.1808)EACH1$8,170.29$1,800.00$10,000$2,100.00
318 (663.1810)EACH5$4,124.76$2,000.00$5,000.00$2,300.00
319 (663.1820)EACH3$9,244.39$4,990.00$10,000$4,000.00
320 (663.1830)EACH3$22,451$5,350.00$25,000$11,000
321Iron Water Main Fittings (3 - 8 inch diameter) (663.2001)LB600$4.80$15.50$5.00$25.00
322Iron Water Main Fittings (10 - 16 inch diameter) (663.2002)LB1,310$10.42$13.30$13.00$25.00
323Iron Water Main Fittings (18 inch diameter and larger) (663.2003)LB34,815$11.72$12.40$16.00$20.00
324 (663.2104)EACH2$586.39$180.00$650.00$700.00
325 (663.2106)EACH14$808.79$270.00$1,000.00$800.00
326 (663.2108)EACH16$856.50$291.00$1,150.00$1,000.00
327 (663.2110)EACH34$1,094.50$353.00$1,300.00$1,200.00
328 (663.2120)EACH35$2,863.08$960.00$3,000.00$2,000.00
329 (663.2124)EACH48$3,554.28$1,220.00$3,650.00$2,500.00
330 (663.2130)EACH35$9,394.98$3,040.00$10,250$5,500.00
331 (663.2504)EACH1$1,751.95$2,040.00$1,500.00$1,700.00
332 (663.2507)EACH4$1,355.12$2,670.00$1,500.00$2,300.00
333 (663.2604)EACH1$454.68$1,380.00$500.00$1,900.00
334 (663.2606)EACH4$365.75$1,750.00$600.00$2,700.00
335Adjust Existing Valve Box Elevation (663.33)EACH9$750.98$348.00$1,000.00$2,000.00
336Adjust Existing Curb Box Elevation (663.35)EACH7$965.55$285.00$600.00$900.00
337 (663.4120)LF1,350$101.70$79.00$75.00$120.00
338 (663.4130)LF600$117.34$90.00$100.00$170.00
339Remove and Dispose of Existing Water Valve & Valve Box (663.42)EACH35$2,064.93$471.00$50.00$1,200.00
340Remove and Store Existing Hydrant (663.46)EACH5$1,869.01$549.00$1,500.00$2,300.00
341 (664.40600006)58$1,164.40$600.00$1,000.00$3,600.00
342 (664.40609608)9$11,753$8,550.00$10,000$17,500
343 (665.98000002)LS1$100,867$114,000$50,000$139,000
344 (670.0106)EACH84$2,603.73$2,940.00$4,400.00$3,000.00
345 (670.0109)EACH6$3,622.59$4,100.00$6,000.00$3,700.00
346 (670.01101302)24$1,245.27$1,410.00$1,500.00$455.00
347 (670.02404202)88$10,981$12,400$8,500.00$9,200.00
348 (670.03070008)18$724.52$1,150.00$1,100.00$675.00
349 (670.03214102)1$13,358$15,100$7,000.00$11,500
350 (670.1406)EACH8$967.91$1,090.00$2,200.00$555.00
351 (670.1530)EACH9$2,909.39$3,290.00$4,750.00$3,300.00
352 (670.1706)EACH9$1,567.90$1,770.00$2,750.00$1,160.00
353Breakaway Transformer Base (Aluminum) (670.19)EACH9$1,132.06$1,280.00$1,800.00$960.00
354 (670.2602)LF11,300$12.57$14.20$10.50$7.15
355 (670.30013402)4$10,755$12,200$3,500.00$7,700.00
356Pullboxes 5 to 7 1/2 cubic feet, inside volume (Lighting) (670.3006)EACH32$1,777.33$2,010.00$2,500.00$2,450.00
357 (670.42110002)8$23,320$26,400$17,000$22,000
358Photoelectric Controls (670.60)EACH24$616.97$698.00$1,600.00$54.00
359 (670.7004)LF43,300$3.68$4.15$2.00$3.60
360Ground Wire No. 6 AWG. (670.7501)LF14,300$3.57$4.05$2.35$2.20
361Remove and Store Lamppost Assembly (670.80)EACH10$616.97$698.00$1,500.00$1,200.00
362Remove and Dispose of Lamppost Assembly (670.81)EACH18$803.76$909.00$1,300.00$900.00
363Remove Lamppost Foundation (670.82)EACH29$803.76$909.00$1,400.00$770.00
364Relocate Lamppost Assembly (670.90)EACH5$2,349.02$2,660.00$3,250.00$1,650.00
365 (670.91000010)13$1,828.28$2,070.00$2,750.00$780.00
366Performance Concrete Quality Adjustment (670.99)QUALITY UNIT1$12.14$12.14$12.14$12.14
367 (680.01990003)9$3,622.59$4,100.00$1,100.00$640.00
368 (680.02990003)4$3,622.59$4,100.00$1,700.00$1,000.00
369 (680.05010007)4$31,132$35,200$30,000$28,500
370 (680.05020007)2$5,332.00$6,030.00$6,000.00$4,900.00
371 (680.05040004)7$4,698.05$5,310.00$4,000.00$4,500.00
372 (680.06030110)22$226.42$256.00$45.00$410.00
373 (680.06040110)12$3,396.18$3,840.00$3,000.00$800.00
374 (680.10000007)2$7,935.74$8,970.00$8,500.00$5,850.00
375 (680.11131014)17$6,888.58$7,790.00$19,000$11,000
376 (680.11141014)5$9,209.30$10,400$21,000$12,700
377Pole Excavation and Concrete Foundation (680.5001)CY67$2,875.43$3,250.00$2,500.00$2,900.00
378Concrete Base for Controller Cabinet (680.5002)EACH8$2,932.04$3,320.00$4,850.00$4,900.00
379Concrete Work Pad (5 feet x 5 feet x 4 inches) (680.5003)EACH9$1,375.45$1,560.00$4,686.47$970.00
380 (680.51000010)3$622.63$704.00$475.00$1,150.00
381 (680.510501)EACH23$1,692.43$1,910.00$2,100.00$2,600.00
382 (680.520106)LF1,600$21.39$24.20$30.00$25.00
383 (680.520108)LF1,250$36.51$41.30$37.00$50.00
384 (680.520110)LF110$63.40$71.70$54.00$67.00
385Trenchless Installation Method for Conduit (680.5301)LF329$137.64$128.00$185.00$105.00
386Emergency Pre-emption System (680.56)EACH4$11,887$13,400$11,000$8,500.00
387 (680.600832)EACH1$21,962$24,800$22,000$11,500
388 (680.601132)EACH4$22,188$25,100$25,000$14,500
389 (680.601231)EACH1$22,754$25,700$30,000$14,400
390 (680.601831)EACH1$31,471$35,600$35,000$16,400
391 (680.622162)EACH1$37,018$41,900$32,000$29,800
392 (680.632057)EACH1$55,584$62,900$55,000$45,700
393 (680.632065)EACH1$57,509$65,000$55,000$48,000
394Dual Span Wire Assembly with Upper Tether Wire (680.7002)EACH6$4,058.43$4,590.00$8,000.00$8,200.00
395Riser Assembly, 2-inch Diameter (680.700606)EACH8$894.33$1,010.00$2,000.00$1,160.00
396 (680.730314)LF900$3.29$3.70$4.00$5.15
397 (680.730514)LF10,500$4.36$4.95$4.00$5.35
398 (680.730714)LF220$5.49$6.20$5.25$6.00
399 (680.78000001)LS1$14,264$16,100$25,000$48,000
400 (680.79000001)LS1$21,849$24,700$45,000$13,000
401Battery Backup System (680.80)EACH4$7,018.77$7,940.00$8,000.00$9,200.00
402 (680.80324515)8$2,716.95$3,070.00$3,750.00$2,950.00
403 (680.80324708)8$1,403.76$1,590.00$2,403.99$1,350.00
404Install Ball/Arrow LED Traffic Signal Module (680.810308)EACH114$84.90$96.00$400.00$29.00
405Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601)EACH114$203.77$230.00$200.00$310.00
406Traffic Signal Bracket Assembly - 1 Way (680.8111)EACH39$679.24$768.00$350.00$685.00
407Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105)EACH1$350.94$397.00$375.00$210.00
408Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106)EACH2$271.70$307.00$300.00$410.00
409Pedestrian Signal Bracket Mount Assembly (680.8141)EACH1$339.62$384.00$500.00$630.00
410Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001)EACH1$401.89$455.00$425.00$250.00
411 (680.8151)EACH1$1,641.48$1,860.00$2,000.00$1,550.00
412Backplates for Traffic Signal Heads (680.8199)EACH47$373.58$423.00$500.00$350.00
413 (680.8204)EACH12$984.89$1,110.00$1,200.00$940.00
414 (680.8207)EACH9$939.61$1,060.00$1,150.00$1,200.00
415 (680.82220002)4$5,094.26$5,760.00$9,500.00$5,500.00
416 (680.82400010)1$4,528.24$5,120.00$1,250.00$2,800.00
417 (680.94400008)4$2,320.72$2,620.00$7,500.00$4,050.00
418Install Electrical Disconnect/Generator Transfer Switch (680.9499)EACH4$735.84$832.00$1,500.00$430.00
419 (680.950306)LF400$3.68$4.15$10.25$9.00
420Performance Concrete Quality Adjustment (680.99)QUALITY UNIT1$11.00$11.00$11.00$11.00
421White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF9,600$1.41$1.55$1.25$1.32
422Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF11,000$1.41$1.55$1.25$1.32
423White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104)LF15,700$3.11$3.45$2.75$2.90
424Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204)LF4,100$3.11$3.45$2.75$2.90
425White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304)EACH52$141.51$156.00$125.00$132.00
426White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404)EACH50$277.35$306.00$245.00$258.00
427 (690.01000105)LS1$100,000$87,400$70,000$100,000
428 (690.01000205)LS1$3,091.17$4,000.00$2,000.00$4,000.00
429 (690.01000305)LS1$62,695$71,800$10,000$65,000
430 (690.01000405)LS1$6,656.95$4,320.00$2,000.00$6,000.00
431 (690.01000505)LS1$22,000$25,500$35,000$30,000
432 (691.04000020)168,000$1.00$1.00$1.00$1.00
433Field Change Payment (FCP) (697.03)DOL1,669,056$1.00$1.00$1.00$1.00
434Asphalt Price Adjustment (698.04)DOL3,621$1.00$1.00$1.00$1.00
435Fuel Price Adjustment (698.05)DOL6,045$1.00$1.00$1.00$1.00
436Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00
437Mobilization (699.040001)LS1$2,400,000$2,987,741$3,080,000$3,245,000
NYSDOT contract D265768: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of June 25, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy