NYSDOT contract D265674 bid tabulation

RETAINING WALL IMPROVEMENT - NY Route 52. Let by New York State DOT on January 22, 2026, Sullivan, Region 09. 5 bids received; low bid $3,447,579 by Sullivan County Paving & Construction Inc.

Owner
New York State DOT
Letting
22 JAN 2026
Pay items
81
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Sullivan County Paving & Construction Inc$3,447,579Low
2Ground Control Excavating Inc.$3,588,547+4.0%
3Economy Paving Co Inc$3,886,334+13%
4Bothar Construction LLC$4,000,000+16%
5Northbrook Contracting Corp$4,840,000+40%
NYSDOT contract D265674: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Sullivan County Paving & Construction Inc2. Ground Control Excavating Inc.3. Economy Paving Co Inc4. Bothar Construction LLC5. Northbrook Contracting Corp
1Clearing and Grubbing (201.06)LS1$20,519$40,000$75,000$86,993$60,000
2Unclassified Excavation and Disposal (203.02)CY1,734$173.13$75.00$40.00$92.00$130.00
3Embankment In Place (203.03)CY59$104.00$125.00$10.00$28.00$125.00
4Trench and Culvert Excavation (206.0201)CY175$97.50$80.00$10.00$96.00$100.00
5Geotextile Drainage (207.22)SY394$19.50$45.00$1.00$3.30$40.00
6Prefabricated Composite Structural Drain (207.26)SY633$19.50$30.00$25.00$25.30$40.00
7Seed and Mulch – Temporary (209.1003)SY105$10.40$100.00$30.00$18.30$22.00
8Sediment Filter Log, 12″ (209.2301)LF120$20.80$25.00$10.00$7.75$15.00
9Subbase Course, Optional Type (304.15)CY340$123.50$75.00$110.00$120.00$150.00
10 (404.0982)TON67$260.00$258.00$295.00$238.00$650.00
11 (404.0989)TON39$260.00$268.00$275.00$228.40$600.00
12 (404.2589)TON225$260.00$258.00$195.00$197.40$500.00
13 (407.01040009)70$13.00$50.00$10.00$11.00$140.00
14Asphalt Pavement Joint Adhesive (418.7603)LF1,532$5.20$5.00$0.50$2.25$6.00
15 (520.09000010)1,501$6.50$30.00$3.95$4.20$4.00
16 (552.2001)LF542$187.50$245.00$325.00$217.00$200.00
17 (552.2002)LF1,153$187.50$245.00$325.00$217.00$200.00
18 (552.2003)LF378$187.50$245.00$325.00$217.00$200.00
19 (552.2201)LF564$349.09$245.00$325.00$250.00$240.00
20 (552.2202)LF1,195$319.87$245.00$325.00$169.25$245.00
21 (552.2203)LF395$351.93$245.00$325.00$214.25$245.00
22 (552.230301)SF2,152$90.00$112.50$125.00$160.25$167.00
23 (552.230302)SF4,578$90.00$112.50$125.00$160.25$167.00
24 (552.230303)SF1,399$90.00$112.50$125.00$170.25$202.00
25 (559.91100006)8,292$1.00$12.50$4.75$5.00$6.00
26 (604.070901)EACH1$3,000.00$6,500.00$2,000.00$1,700.00$2,000.00
27 (604.070902)EACH1$3,000.00$6,500.00$2,000.00$1,700.00$1,800.00
28 (604.070903)EACH1$3,000.00$6,500.00$2,000.00$1,700.00$1,800.00
29 (604.070904)EACH1$3,000.00$4,500.00$2,000.00$1,700.00$1,000.00
30Underdrain Filter, Type I (605.0901)CY242$102.00$85.00$100.00$162.00$200.00
31 (605.1702)LF1,602$9.60$13.00$20.00$5.00$6.00
32Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013)QUALITY UNIT17$100.00$100.00$100.00$100.00$100.00
33Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON2$300.00$500.00$1,000.00$1,110.00$1,200.00
34Mycorrhizal Fungi (610.0701)LB10$33.00$1,000.00$30.00$86.25$40.00
35Weed Removal (610.13)SY336$1.10$15.00$1.00$11.50$22.00
36Topsoil - Roadside (610.1402)CY38$150.00$150.00$100.00$139.00$200.00
37 (610.16092924)336$3.30$75.00$5.00$11.00$15.00
38Watering Vegetation (610.19)1,000 GALLONS37$11.00$75.00$10.00$258.75$920.00
39 (611.0242)EACH7$550.00$1,200.00$500.00$1,052.25$800.00
40 (611.0351)EACH4$550.00$1,200.00$500.00$1,477.75$900.00
41 (611.0442)EACH168$88.00$175.00$65.00$147.20$130.00
42 (611.0452)EACH6$132.00$1,200.00$150.00$157.55$175.00
43 (611.19020024)7$22.00$1,000.00$10.00$315.10$482.00
44 (611.19030024)4$22.00$1,000.00$10.00$442.75$613.00
45 (611.19040024)174$3.30$150.00$2.50$44.85$223.00
46Improvement of Vegetated Areas (614.05)SY34$60.00$150.00$50.00$147.20$175.00
47 (617.01010024)473$1.00$50.00$1.00$5.20$10.00
48 (617.10000024)112$144.00$60.00$10.00$57.00$185.00
49 (617.11000024)LS1$5,000.00$1,500.00$1,000.00$3,370.00$4,000.00
50Basic Work Zone Traffic Control (619.01)LS1$150,000$45,000$300,000$360,000$505,000
51Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803)LF288$1.00$35.00$10.00$7.50$25.00
52 (619.100103)LF6,400$3.00$5.00$5.50$6.35$15.00
53 (619.130101)EACH1$162,282$180,000$150,000$126,560$253,637
54Temporary Positive Barrier – Category 4 (Pinning Permitted) (619.1714)LF1,060$56.25$95.00$75.00$85.00$145.00
55Temporary Impact Attenuator - Redirective (Test Level 2) (619.1802)EACH5$6,000.00$7,500.00$3,000.00$7,000.00$8,400.00
56Stone Filling (Fine) (620.02)CY12$144.00$125.00$195.00$322.00$500.00
57Asphalt Gutters, as Detailed (624.020601)TON152$200.00$268.00$295.00$363.00$325.00
58Plant Production Quality Adjustment to 624.020601 (624.020610)QUALITY UNIT8$100.00$100.00$100.00$100.00$100.00
59Survey Operations (625.01)LS1$150,000$30,000$25,000$85,000$60,000
60Permanent Survey Markers (625.06)EACH4$3,000.00$1,500.00$3,500.00$4,000.00$1,600.00
61 (625.130001)EACH1$18,000$20,000$50,000$38,000$3,000.00
62Field Laboratory (637.01)EACH1$4,000.00$2,500.00$1,000.00$3,200.00$22,000
63Concrete Cylinder Curing Equipment (637.04)EACH1$1,500.00$5,000.00$10,000$4,400.00$2,000.00
64Engineer’s Field Office – Type 1 (637.11)MONTH12$4,000.00$1,000.00$3,000.00$3,200.00$3,000.00
65Construction Testing supplies – Consumables (637.36)DOL500$1.00$1.00$1.00$1.00$1.00
66 (637.41000115)12$300.00$1,000.00$100.00$186.00$100.00
67Ground-Mounted Sign Panels without Z-bars (645.5101)SF2$145.00$750.00$150.00$143.75$150.00
68Type A Sign Posts (645.81)EACH6$781.00$500.00$700.00$776.25$800.00
69Reference Marker Panel (646.21)EACH1$185.00$5,000.00$175.00$184.00$190.00
70Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23)EACH8$127.00$500.00$115.00$126.50$135.00
71Steel Post, 2.0 lb/ft (646.32)EACH13$295.00$100.00$255.00$293.25$300.00
72Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH3$450.00$1,000.00$400.00$448.50$500.00
73Relocate Sign Panel, Sign Panel Assembly Size II (30-100 Square Feet) (647.32)EACH1$515.00$1,000.00$500.00$511.75$500.00
74 (647.83001002)1$14.00$500.00$10.00$13.80$20.00
75White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF3,040$2.00$10.00$2.00$1.95$4.00
76Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF3,040$2.00$10.00$2.00$1.95$4.00
77Field Change Payment (FCP) (697.03)DOL133,000$1.00$1.00$1.00$1.00$1.00
78Asphalt Price Adjustment (698.04)DOL235.95$1.00$1.00$1.00$1.00$1.00
79Fuel Price Adjustment (698.05)DOL214$1.00$1.00$1.00$1.00$1.00
80Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00
81Mobilization (699.040001)LS1$128,737$135,000$149,444$150,000$183,000
NYSDOT contract D265674: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of January 22, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy