NYSDOT contract D265674 bid tabulation
RETAINING WALL IMPROVEMENT - NY Route 52. Let by New York State DOT on January 22, 2026, Sullivan, Region 09. 5 bids received; low bid $3,447,579 by Sullivan County Paving & Construction Inc.
- Owner
- New York State DOT
- Letting
- 22 JAN 2026
- Pay items
- 81
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Sullivan County Paving & Construction Inc | $3,447,579 | Low |
| 2 | Ground Control Excavating Inc. | $3,588,547 | +4.0% |
| 3 | Economy Paving Co Inc | $3,886,334 | +13% |
| 4 | Bothar Construction LLC | $4,000,000 | +16% |
| 5 | Northbrook Contracting Corp | $4,840,000 | +40% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sullivan County Paving & Construction Inc | 2. Ground Control Excavating Inc. | 3. Economy Paving Co Inc | 4. Bothar Construction LLC | 5. Northbrook Contracting Corp |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $20,519 | $40,000 | $75,000 | $86,993 | $60,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 1,734 | $173.13 | $75.00 | $40.00 | $92.00 | $130.00 |
| 3 | Embankment In Place (203.03) | CY | 59 | $104.00 | $125.00 | $10.00 | $28.00 | $125.00 |
| 4 | Trench and Culvert Excavation (206.0201) | CY | 175 | $97.50 | $80.00 | $10.00 | $96.00 | $100.00 |
| 5 | Geotextile Drainage (207.22) | SY | 394 | $19.50 | $45.00 | $1.00 | $3.30 | $40.00 |
| 6 | Prefabricated Composite Structural Drain (207.26) | SY | 633 | $19.50 | $30.00 | $25.00 | $25.30 | $40.00 |
| 7 | Seed and Mulch – Temporary (209.1003) | SY | 105 | $10.40 | $100.00 | $30.00 | $18.30 | $22.00 |
| 8 | Sediment Filter Log, 12″ (209.2301) | LF | 120 | $20.80 | $25.00 | $10.00 | $7.75 | $15.00 |
| 9 | Subbase Course, Optional Type (304.15) | CY | 340 | $123.50 | $75.00 | $110.00 | $120.00 | $150.00 |
| 10 | (404.0982) | TON | 67 | $260.00 | $258.00 | $295.00 | $238.00 | $650.00 |
| 11 | (404.0989) | TON | 39 | $260.00 | $268.00 | $275.00 | $228.40 | $600.00 |
| 12 | (404.2589) | TON | 225 | $260.00 | $258.00 | $195.00 | $197.40 | $500.00 |
| 13 | (407.01040009) | 70 | $13.00 | $50.00 | $10.00 | $11.00 | $140.00 | |
| 14 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 1,532 | $5.20 | $5.00 | $0.50 | $2.25 | $6.00 |
| 15 | (520.09000010) | 1,501 | $6.50 | $30.00 | $3.95 | $4.20 | $4.00 | |
| 16 | (552.2001) | LF | 542 | $187.50 | $245.00 | $325.00 | $217.00 | $200.00 |
| 17 | (552.2002) | LF | 1,153 | $187.50 | $245.00 | $325.00 | $217.00 | $200.00 |
| 18 | (552.2003) | LF | 378 | $187.50 | $245.00 | $325.00 | $217.00 | $200.00 |
| 19 | (552.2201) | LF | 564 | $349.09 | $245.00 | $325.00 | $250.00 | $240.00 |
| 20 | (552.2202) | LF | 1,195 | $319.87 | $245.00 | $325.00 | $169.25 | $245.00 |
| 21 | (552.2203) | LF | 395 | $351.93 | $245.00 | $325.00 | $214.25 | $245.00 |
| 22 | (552.230301) | SF | 2,152 | $90.00 | $112.50 | $125.00 | $160.25 | $167.00 |
| 23 | (552.230302) | SF | 4,578 | $90.00 | $112.50 | $125.00 | $160.25 | $167.00 |
| 24 | (552.230303) | SF | 1,399 | $90.00 | $112.50 | $125.00 | $170.25 | $202.00 |
| 25 | (559.91100006) | 8,292 | $1.00 | $12.50 | $4.75 | $5.00 | $6.00 | |
| 26 | (604.070901) | EACH | 1 | $3,000.00 | $6,500.00 | $2,000.00 | $1,700.00 | $2,000.00 |
| 27 | (604.070902) | EACH | 1 | $3,000.00 | $6,500.00 | $2,000.00 | $1,700.00 | $1,800.00 |
| 28 | (604.070903) | EACH | 1 | $3,000.00 | $6,500.00 | $2,000.00 | $1,700.00 | $1,800.00 |
| 29 | (604.070904) | EACH | 1 | $3,000.00 | $4,500.00 | $2,000.00 | $1,700.00 | $1,000.00 |
| 30 | Underdrain Filter, Type I (605.0901) | CY | 242 | $102.00 | $85.00 | $100.00 | $162.00 | $200.00 |
| 31 | (605.1702) | LF | 1,602 | $9.60 | $13.00 | $20.00 | $5.00 | $6.00 |
| 32 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 17 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 33 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 2 | $300.00 | $500.00 | $1,000.00 | $1,110.00 | $1,200.00 |
| 34 | Mycorrhizal Fungi (610.0701) | LB | 10 | $33.00 | $1,000.00 | $30.00 | $86.25 | $40.00 |
| 35 | Weed Removal (610.13) | SY | 336 | $1.10 | $15.00 | $1.00 | $11.50 | $22.00 |
| 36 | Topsoil - Roadside (610.1402) | CY | 38 | $150.00 | $150.00 | $100.00 | $139.00 | $200.00 |
| 37 | (610.16092924) | 336 | $3.30 | $75.00 | $5.00 | $11.00 | $15.00 | |
| 38 | Watering Vegetation (610.19) | 1,000 GALLONS | 37 | $11.00 | $75.00 | $10.00 | $258.75 | $920.00 |
| 39 | (611.0242) | EACH | 7 | $550.00 | $1,200.00 | $500.00 | $1,052.25 | $800.00 |
| 40 | (611.0351) | EACH | 4 | $550.00 | $1,200.00 | $500.00 | $1,477.75 | $900.00 |
| 41 | (611.0442) | EACH | 168 | $88.00 | $175.00 | $65.00 | $147.20 | $130.00 |
| 42 | (611.0452) | EACH | 6 | $132.00 | $1,200.00 | $150.00 | $157.55 | $175.00 |
| 43 | (611.19020024) | 7 | $22.00 | $1,000.00 | $10.00 | $315.10 | $482.00 | |
| 44 | (611.19030024) | 4 | $22.00 | $1,000.00 | $10.00 | $442.75 | $613.00 | |
| 45 | (611.19040024) | 174 | $3.30 | $150.00 | $2.50 | $44.85 | $223.00 | |
| 46 | Improvement of Vegetated Areas (614.05) | SY | 34 | $60.00 | $150.00 | $50.00 | $147.20 | $175.00 |
| 47 | (617.01010024) | 473 | $1.00 | $50.00 | $1.00 | $5.20 | $10.00 | |
| 48 | (617.10000024) | 112 | $144.00 | $60.00 | $10.00 | $57.00 | $185.00 | |
| 49 | (617.11000024) | LS | 1 | $5,000.00 | $1,500.00 | $1,000.00 | $3,370.00 | $4,000.00 |
| 50 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $150,000 | $45,000 | $300,000 | $360,000 | $505,000 |
| 51 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 288 | $1.00 | $35.00 | $10.00 | $7.50 | $25.00 |
| 52 | (619.100103) | LF | 6,400 | $3.00 | $5.00 | $5.50 | $6.35 | $15.00 |
| 53 | (619.130101) | EACH | 1 | $162,282 | $180,000 | $150,000 | $126,560 | $253,637 |
| 54 | Temporary Positive Barrier – Category 4 (Pinning Permitted) (619.1714) | LF | 1,060 | $56.25 | $95.00 | $75.00 | $85.00 | $145.00 |
| 55 | Temporary Impact Attenuator - Redirective (Test Level 2) (619.1802) | EACH | 5 | $6,000.00 | $7,500.00 | $3,000.00 | $7,000.00 | $8,400.00 |
| 56 | Stone Filling (Fine) (620.02) | CY | 12 | $144.00 | $125.00 | $195.00 | $322.00 | $500.00 |
| 57 | Asphalt Gutters, as Detailed (624.020601) | TON | 152 | $200.00 | $268.00 | $295.00 | $363.00 | $325.00 |
| 58 | Plant Production Quality Adjustment to 624.020601 (624.020610) | QUALITY UNIT | 8 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 59 | Survey Operations (625.01) | LS | 1 | $150,000 | $30,000 | $25,000 | $85,000 | $60,000 |
| 60 | Permanent Survey Markers (625.06) | EACH | 4 | $3,000.00 | $1,500.00 | $3,500.00 | $4,000.00 | $1,600.00 |
| 61 | (625.130001) | EACH | 1 | $18,000 | $20,000 | $50,000 | $38,000 | $3,000.00 |
| 62 | Field Laboratory (637.01) | EACH | 1 | $4,000.00 | $2,500.00 | $1,000.00 | $3,200.00 | $22,000 |
| 63 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $1,500.00 | $5,000.00 | $10,000 | $4,400.00 | $2,000.00 |
| 64 | Engineer’s Field Office – Type 1 (637.11) | MONTH | 12 | $4,000.00 | $1,000.00 | $3,000.00 | $3,200.00 | $3,000.00 |
| 65 | Construction Testing supplies – Consumables (637.36) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 66 | (637.41000115) | 12 | $300.00 | $1,000.00 | $100.00 | $186.00 | $100.00 | |
| 67 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 2 | $145.00 | $750.00 | $150.00 | $143.75 | $150.00 |
| 68 | Type A Sign Posts (645.81) | EACH | 6 | $781.00 | $500.00 | $700.00 | $776.25 | $800.00 |
| 69 | Reference Marker Panel (646.21) | EACH | 1 | $185.00 | $5,000.00 | $175.00 | $184.00 | $190.00 |
| 70 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 8 | $127.00 | $500.00 | $115.00 | $126.50 | $135.00 |
| 71 | Steel Post, 2.0 lb/ft (646.32) | EACH | 13 | $295.00 | $100.00 | $255.00 | $293.25 | $300.00 |
| 72 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 3 | $450.00 | $1,000.00 | $400.00 | $448.50 | $500.00 |
| 73 | Relocate Sign Panel, Sign Panel Assembly Size II (30-100 Square Feet) (647.32) | EACH | 1 | $515.00 | $1,000.00 | $500.00 | $511.75 | $500.00 |
| 74 | (647.83001002) | 1 | $14.00 | $500.00 | $10.00 | $13.80 | $20.00 | |
| 75 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 3,040 | $2.00 | $10.00 | $2.00 | $1.95 | $4.00 |
| 76 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 3,040 | $2.00 | $10.00 | $2.00 | $1.95 | $4.00 |
| 77 | Field Change Payment (FCP) (697.03) | DOL | 133,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 78 | Asphalt Price Adjustment (698.04) | DOL | 235.95 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 79 | Fuel Price Adjustment (698.05) | DOL | 214 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 80 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 81 | Mobilization (699.040001) | LS | 1 | $128,737 | $135,000 | $149,444 | $150,000 | $183,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of January 22, 2026. Compiled by Mirage Metrics.