Sullivan County Paving & Construction Inc: NYSDOT bid record
Sullivan County Paving & Construction Inc submitted 16 bids on New York State DOT contracts in the data, from 06 JAN 2022 to 05 FEB 2026, and was the low bidder on 4 of them (25%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $28,670,664
- Latest bid
- 05 FEB 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 5 | 2 | 40% |
| 2023 | 2 | 0 | 0% |
| 2024 | 3 | 0 | 0% |
| 2025 | 3 | 0 | 0% |
| 2026 | 3 | 2 | 67% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 09 | 9 | 3 | 33% |
| Region 08 | 7 | 1 | 14% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 16 | 16 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 16 | 16 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 16 | 16 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 15 | 15 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 14 | 14 (100%) | $1.00 | $1.00 |
| Pavement Density Quality Adjustment to Asphalt Items | 404.0002 | QUALITY UNIT | 7 | 7 (100%) | $120.00 | $110.00 |
| Longitudinal Joint Density Quality Adjustment to Asphalt Items | 404.0003 | QUALITY UNIT | 7 | 7 (100%) | $120.00 | $110.00 |
| Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.000013 | QUALITY UNIT | 5 | 5 (100%) | $100.00 | $90.00 |
| Plant Production Quality Adjustment to Asphalt Items | 404.000011 | QUALITY UNIT | 5 | 5 (100%) | $75.00 | $85.00 |
| 404.0001 | TON | 5 | 5 (100%) | $120.00 | $95.00 | |
| Clean, Grade and Shape Existing Roadside Section | 621.05 | LF | 5 | 5 (100%) | $3.00 | $8.00 |
| 203.24010017 | 7 | 4 (57%) | $75.00 | $90.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Bothar Construction LLC | 5 | 2 of 5 |
| Callanan Industries Inc | 5 | 3 of 5 |
| Yonkers Contracting Company Inc | 4 | 1 of 4 |
| Jrcruz Corp | 4 | 1 of 4 |
| Lancaster Development and Tully Construction Co LLC | 3 | 0 of 3 |
| J D'Annunzio & Sons Inc | 3 | 1 of 3 |
| Argenio Brothers Inc | 2 | 2 of 2 |
| Elq Industries Inc | 2 | 0 of 2 |
| D A Collins Construction Co Inc | 2 | 0 of 2 |
| Economy Paving Co Inc | 2 | 1 of 2 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 FEB 2026 | D265651 | Region 08 | PAVEMENT RESURFACING - Route 17 | 1 of 6 | $18,980,041 | Low, 9.0% under the second |
| 22 JAN 2026 | D265674 | Region 09 | RETAINING WALL IMPROVEMENT - NY Route 52 | 1 of 5 | $3,447,579 | Low, 4.0% under the second |
| 22 JAN 2026 | D265676 | Region 08 | PAVEMENT PREVENTATIVE MAINTENANCE - Segments of Route 17M | 3 of 4 | $15,605,590 | +12% |
| 18 DEC 2025 | D265594 | Region 08 | BRIDGE REPLACEMENT - Route 17 over NYS Route 17K | 6 of 6 | $22,264,035 | +31% |
| 13 MAR 2025 | D265462 | Region 08 | ROUTE 52 - PAVING ST JOHN ROAD TO BONIFACE ROAD | 5 of 5 | $3,849,238 | +36% |
| 27 FEB 2025 | D265442 | Region 08 | PAVEMENT RESURFACING - Route 17 | 2 of 7 | $10,544,621 | +9.0% |
| 11 JUL 2024 | D265287 | Region 09 | NY 17 RESURFACING , EXIT 101 TO EXIT 102 | 3 of 4 | $8,598,322 | +11% |
| 23 MAY 2024 | D265244 | Region 09 | Route 52 & 55 Resurfacing, Liberty | 2 of 3 | $3,061,494 | +5.0% |
| 28 MAR 2024 | D265033 | Region 09 | BRIDGE REHABILITATION - Bridge Street over Delaware River | 5 of 6 | $22,677,674 | +27% |
| 06 APR 2023 | D265004 | Region 08 | PMI PAVING: ROUTE 17M ORANGE COUNTY | 2 of 4 | $5,825,344 | +1.0% |
| 02 FEB 2023 | D264953 | Region 08 | PMI PAVING & GUIDERAIL, I-84 ROUTE 747 TO ROUTE 32 | 2 of 7 | $14,189,554 | +3.0% |
| 20 OCT 2022 | D264868 | Region 09 | RT 97 SLOPE STABILIZATION | 1 of 4 | $3,283,205 | Low, 30% under the second |
| 06 OCT 2022 | D264864 | Region 09 | MEDIAN BARRIER INSTALLATION, NY Route 17, Exit 104-112. | 2 of 2 | $3,497,871 | +19% |
| 02 JUN 2022 | D264751 | Region 09 | RTE 17 EXIT 105 AND RTE 42 RAMP RECON, RTE 42 IMPROVEMENTS | 2 of 3 | $33,883,298 | +10% |
| 17 FEB 2022 | D264646 | Region 09 | RT 42 AT COUNTY ROADS 52 & 53, SAFETY IMPROVEMENTS. | 1 of 3 | $2,959,839 | Low, 1.0% under the second |
| 06 JAN 2022 | D264711 | Region 09 | RT 17 OVER DEBRUCE & WILLOWEMOC, SCOUR REPAIR | 3 of 3 | $2,198,995 | +29% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.