NYSDOT contract D265676 bid tabulation
PAVEMENT PREVENTATIVE MAINTENANCE - Segments of Route 17M. Let by New York State DOT on January 22, 2026, Orange, Region 08. 4 bids received; low bid $13,939,047 by Crisdel Group Inc.
- Owner
- New York State DOT
- Letting
- 22 JAN 2026
- Pay items
- 82
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Crisdel Group Inc | $13,939,047 | Low |
| 2 | Yonkers Contracting Company Inc | $14,911,020 | +7.0% |
| 3 | Sullivan County Paving & Construction Inc | $15,605,590 | +12% |
| 4 | Jrcruz Corp | $16,967,588 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Crisdel Group Inc | 2. Yonkers Contracting Company Inc | 3. Sullivan County Paving & Construction Inc | 4. Jrcruz Corp |
|---|---|---|---|---|---|---|---|
| 1 | Unclassified Excavation and Disposal (203.02) | CY | 9 | $266.37 | $700.00 | $850.00 | $200.00 |
| 2 | Embankment In Place (203.03) | CY | 9 | $248.19 | $500.00 | $850.00 | $150.00 |
| 3 | Controlled Low Strength Material (CLSM) (204.01) | CY | 5 | $472.05 | $400.00 | $1,200.00 | $250.00 |
| 4 | Geotextile Separation (207.21) | SY | 2,652 | $2.57 | $11.00 | $10.00 | $5.00 |
| 5 | (304.11000008) | 264 | $198.31 | $75.00 | $200.00 | $150.00 | |
| 6 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 1 | $140.00 | $140.00 | $140.00 | $140.00 |
| 7 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 156 | $140.00 | $140.00 | $140.00 | $140.00 |
| 8 | (404.0179) | TON | 1,848 | $172.01 | $140.00 | $180.00 | $205.00 |
| 9 | (404.1969) | TON | 8,976 | $165.00 | $225.00 | $180.00 | $350.00 |
| 10 | (406.0961) | TON | 20,523 | $167.62 | $140.00 | $168.00 | $215.00 |
| 11 | Straight Tack Coat (407.0103) | GAL | 15,255 | $3.40 | $9.00 | $8.00 | $10.00 |
| 12 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 167,845 | $0.30 | $1.00 | $1.25 | $0.90 |
| 13 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 177,800 | $7.39 | $9.00 | $6.00 | $6.50 |
| 14 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 37,760 | $13.96 | $25.00 | $8.00 | $25.00 |
| 15 | (502.0021) | 25 | $2,290.40 | $1,200.00 | $8,000.00 | $1,500.00 | |
| 16 | Performance Concrete Quality Adjustment - PCC Pavement (502.99) | QUALITY UNIT | 1 | $2.50 | $2.50 | $2.50 | $2.50 |
| 17 | Concrete for Structures, Performance (555.0021) | CY | 2 | $15,382 | $7,500.00 | $5,000.00 | $3,250.00 |
| 18 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $22.50 | $22.50 | $22.50 | $22.50 |
| 19 | (564.510004) | LB | 298 | $5.24 | $1.00 | $18.00 | $10.00 |
| 20 | Transition Bridge Railing (568.70) | LF | 10 | $996.55 | $500.00 | $1,500.00 | $1,200.00 |
| 21 | Removal of Structural Concrete (580.01) | CY | 1 | $1,358.34 | $20,000 | $2,000.00 | $1,500.00 |
| 22 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 49 | $114.37 | $10.00 | $125.00 | $100.00 |
| 23 | (595.98200018) | 3,854 | $17.49 | $18.00 | $30.00 | $27.00 | |
| 24 | (601.03000024) | 60 | $472.05 | $500.00 | $500.00 | $125.00 | |
| 25 | (604.070801) | EACH | 6 | $5,454.50 | $8,000.00 | $5,500.00 | $1,500.00 |
| 26 | (604.07290010) | 40 | $109.94 | $150.00 | $300.00 | $150.00 | |
| 27 | (604.07600008) | 56 | $3,092.79 | $8,000.00 | $6,500.00 | $6,000.00 | |
| 28 | (604.07610008) | 19 | $5,207.33 | $10,000 | $7,500.00 | $6,500.00 | |
| 29 | Concrete Sidewalks and Driveways (608.0101) | CY | 36 | $1,296.88 | $4,500.00 | $2,900.00 | $1,350.00 |
| 30 | (608.01050109) | 13 | $2,555.09 | $15,000 | $16,000 | $5,700.00 | |
| 31 | (608.01050209) | 18 | $2,337.69 | $15,000 | $16,000 | $5,800.00 | |
| 32 | (608.01050409) | 1 | $2,769.21 | $15,000 | $15,000 | $8,200.00 | |
| 33 | (608.01050609) | 1 | $3,241.26 | $15,000 | $18,000 | $12,000 | |
| 34 | (608.01050809) | 3 | $7,783.21 | $15,000 | $17,000 | $8,500.00 | |
| 35 | (608.01050909) | 2 | $2,533.19 | $15,000 | $17,000 | $6,000.00 | |
| 36 | (608.01051109) | 3 | $3,395.07 | $15,000 | $17,000 | $5,800.00 | |
| 37 | (608.01051209) | 5 | $2,929.74 | $15,000 | $21,000 | $7,500.00 | |
| 38 | (608.01051309) | 10 | $3,473.07 | $15,000 | $19,000 | $6,200.00 | |
| 39 | (608.02010015) | 300 | $500.67 | $500.00 | $300.00 | $200.00 | |
| 40 | (609.0401) | LF | 891 | $92.88 | $110.00 | $120.00 | $125.00 |
| 41 | Turf Establishment – Performance (610.1605) | SY | 100 | $5.25 | $10.00 | $50.00 | $15.00 |
| 42 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $1,800,000 | $938,000 | $1,800,000 | $1,750,000 |
| 43 | (619.110512) | EACH | 20 | $1,000.00 | $13,000 | $9,000.00 | $10,000 |
| 44 | Maintain Traffic Signal Equipment (Requirement B) Intersection (619.1612) | MONTH | 45 | $398.62 | $250.00 | $400.00 | $400.00 |
| 45 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $859,000 | $100,000 | $1,000,000 | $250,000 |
| 46 | Traffic Control Supervisor (619.25) | MONTH | 3 | $45,531 | $32,000 | $16,000 | $12,500 |
| 47 | Stone Filling (Light) (620.03) | CY | 294 | $221.30 | $275.00 | $200.00 | $148.00 |
| 48 | Stone Filling (Medium) (620.04) | CY | 2 | $909.43 | $750.00 | $400.00 | $200.00 |
| 49 | Cleaning Closed Drainage Systems (621.03) | LF | 5,850 | $8.92 | $9.00 | $2.00 | $7.00 |
| 50 | Cleaning Drainage Structures (621.04) | EACH | 117 | $550.73 | $500.00 | $100.00 | $750.00 |
| 51 | Survey Operations (625.01) | LS | 1 | $127,108 | $45,000 | $180,000 | $150,000 |
| 52 | (627.50140008) | 5,724 | $5.41 | $8.50 | $9.00 | $5.00 | |
| 53 | (633.05040008) | LS | 1 | $72,184 | $600,000 | $300,000 | $25,000 |
| 54 | Cleaning, Sealing and/or Filling Joints (633.13) | LF | 30,353 | $5.67 | $0.50 | $3.00 | $5.50 |
| 55 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $5,769.50 | $3,000.00 | $3,000.00 | $5,000.00 |
| 56 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 12 | $4,949.35 | $15,000 | $5,500.00 | $7,000.00 |
| 57 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 2 | $1,573.50 | $500.00 | $800.00 | $3,500.00 |
| 58 | Milled-In Audible Roadway Delineators (MIARDs) (649.01) | LF | 31,200 | $0.72 | $0.75 | $1.00 | $0.60 |
| 59 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 15,600 | $0.62 | $0.95 | $1.00 | $1.55 |
| 60 | (655.07030010) | 7 | $1,952.66 | $1,500.00 | $2,800.00 | $2,700.00 | |
| 61 | Cast Frame F2, UnMountable Curb Box CU2 & Reticuline Grate G2 (655.0705) | EACH | 17 | $1,885.75 | $3,500.00 | $3,000.00 | $2,900.00 |
| 62 | Welded Frame & Reticuline Grate 11 (655.1111) | EACH | 1 | $2,262.53 | $1,200.00 | $2,600.00 | $5,500.00 |
| 63 | (662.60510008) | 10 | $727.42 | $5,000.00 | $2,500.00 | $855.00 | |
| 64 | Adjust Existing Valve Box Elevation (663.33) | EACH | 16 | $673.72 | $200.00 | $100.00 | $855.00 |
| 65 | (670.14480010) | 5 | $1,793.79 | $300.00 | $1,150.00 | $1,350.00 | |
| 66 | (680.05010007) | 10 | $35,876 | $26,400 | $29,500 | $27,000 | |
| 67 | (680.05020007) | 12 | $6,975.85 | $4,500.00 | $4,000.00 | $3,800.00 | |
| 68 | (680.12241214) | 2 | $5,979.30 | $10,000 | $16,000 | $13,500 | |
| 69 | (680.51200208) | 37 | $1,494.83 | $200.00 | $1,500.00 | $1,500.00 | |
| 70 | (680.82250608) | 1 | $2,491.38 | $3,500.00 | $2,500.00 | $2,000.00 | |
| 71 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 10,584 | $0.46 | $3.00 | $3.30 | $2.50 |
| 72 | (685.16010014) | 159,829 | $1.35 | $1.40 | $1.60 | $1.70 | |
| 73 | (685.17010014) | 99,226 | $1.35 | $1.40 | $1.60 | $1.70 | |
| 74 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 22,344 | $2.61 | $3.60 | $4.00 | $3.50 |
| 75 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 164 | $46.16 | $75.00 | $90.00 | $170.00 |
| 76 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 65 | $204.56 | $225.00 | $250.00 | $200.00 |
| 77 | (691.04000020) | 31,500 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 78 | Field Change Payment (FCP) (697.03) | DOL | 625,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 79 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 80 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 81 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 82 | Mobilization (699.040001) | LS | 1 | $510,000 | $550,000 | $550,000 | $643,023 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of January 22, 2026. Compiled by Mirage Metrics.