NYSDOT contract D265423 bid tabulation

Highway Reconstruction Rt 370 Liverpool. Let by New York State DOT on February 27, 2025, Onondaga, Region 03. 5 bids received; low bid $13,885,115 by Rifenburg Construction Inc.

Owner
New York State DOT
Letting
27 FEB 2025
Pay items
182
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Rifenburg Construction Inc$13,885,115Low
2Economy Paving Co Inc$14,470,105+4.0%
3Cci Companies Inc$14,663,898+6.0%
4Sealand Contractors Corp.$16,252,000+17%
5Barrett Paving Materials Inc$19,898,990+43%
NYSDOT contract D265423: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Rifenburg Construction Inc2. Economy Paving Co Inc3. Cci Companies Inc4. Sealand Contractors Corp.5. Barrett Paving Materials Inc
1Clearing and Grubbing (201.06)LS1$28,500$200,000$50,000$25,000$15,500
2Unclassified Excavation and Disposal (203.02)CY17,875$35.00$10.00$85.00$58.00$85.00
3Embankment In Place (203.03)CY2,684$12.00$1.00$12.00$17.00$12.20
4Select Granular Fill (203.07)CY6,956$53.75$65.00$95.00$82.00$85.00
5 (205.0201)LS1$500.00$1,000.00$2,500.00$2,000.00$1,200.00
6 (205.0202)LS1$500.00$1,000.00$2,500.00$2,000.00$1,200.00
7 (205.0203)LS1$500.00$1,000.00$2,500.00$2,000.00$1,200.00
8 (205.0204)LS1$500.00$1,000.00$2,500.00$2,000.00$1,200.00
9 (205.0205)LS1$500.00$1,000.00$2,500.00$3,000.00$1,200.00
10Field Organic Vapor Monitoring of Contaminated Soil (205.03)HR50$150.00$125.00$175.00$160.00$175.00
11 (205.050201)TON15$125.00$100.00$85.00$250.00$138.00
12 (205.050202)TON16$125.00$100.00$85.00$250.00$138.00
13 (205.050203)TON14$125.00$100.00$85.00$250.00$138.00
14 (205.050204)TON16$125.00$100.00$85.00$250.00$138.00
15 (205.050205)TON29$125.00$100.00$85.00$250.00$130.00
16Trench and Culvert Excavation (206.0201)CY9,904$67.00$1.00$90.00$75.00$81.00
17 (206.03180010)160$46.00$1.00$150.00$65.00$59.75
18 (206.03200010)75$46.00$1.00$48.00$39.00$35.60
19Geotextile Drainage (207.22)SY3,283$1.50$1.70$2.25$4.50$0.94
20SWTD - Maximum Treatment Flow Rate over 2.8 cfs up to 3.8 cfs (208.5401)EACH1$40,000$45,000$32,000$40,000$97,000
21SWTD - Maximum Treatment Flow Rate over 3.8 cfs up to 5.0 cfs (208.5501)EACH1$45,000$55,000$35,000$43,000$40,000
22SWTD - Maximum Treatment Flow Rate over 7.0 cfs up to 10.0 cfs (208.5701)EACH1$80,000$65,000$60,000$83,000$80,000
23Mulch – Temporary (209.100101)SY10,600$0.85$1.00$1.00$0.95$0.93
24Seed and Mulch – Temporary (209.1003)SY2,500$1.30$1.50$1.50$1.48$1.46
25 (209.11010024)70$350.00$100.00$500.00$330.00$269.03
26Silt Fence - Temporary (209.13)LF100$8.00$5.00$25.00$25.00$20.86
27Soil Stabilizers, Class IV Type C (209.2103)SY100$13.90$15.00$16.00$13.25$13.07
28 (209.23010009)584$15.00$8.50$12.00$14.00$10.95
29Subbase Course, Type 2 (304.12)CY10,103$83.00$75.00$110.00$81.00$133.00
30 (404.0179)TON103$160.00$225.00$170.00$220.00$300.00
31 (404.2569)TON5,109$121.00$155.00$150.00$123.00$185.00
32 (404.4489)TON618$118.00$175.00$300.00$300.00$295.00
33 (406.0962)TON2,391$156.00$175.00$175.00$157.00$162.00
34 (406.1969)TON3,193$133.50$155.00$150.00$136.00$250.00
35Diluted Tack Coat (407.0102)GAL34,257$3.00$2.10$4.75$9.30$1.91
36Asphalt Pavement Joint Adhesive (418.7603)LF106,439$0.50$0.35$0.25$1.10$0.23
37Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY5,546$9.50$12.00$12.00$20.00$18.00
38Shields and Shoring (552.17)SF102,662$0.10$0.01$0.25$0.10$1.00
39Concrete for Structures, Performance (555.0021)CY1$1,250.00$1,000.00$2,000.00$10,000$2,500.00
40Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT1$10.00$10.00$10.00$10.00$10.00
41 (603.6001)LF40$374.50$100.00$200.00$200.00$130.00
42 (603.6002)LF1,240$128.00$125.00$88.00$120.00$125.00
43 (603.6003)LF3,306$150.00$150.00$90.00$132.00$190.00
44 (603.6005)LF509$143.25$250.00$110.00$135.00$200.00
45 (603.6009)LF40$668.00$250.00$275.00$400.00$265.00
46Concrete Collars (603.77)EACH31$1,950.00$1,375.00$500.00$2,500.00$2,000.00
47 (604.070101)EACH4$2,200.00$1,050.00$1,400.00$3,000.00$2,200.00
48 (604.070102)EACH1$2,200.00$1,350.00$1,400.00$4,000.00$2,200.00
49 (604.310673)LF230$1,125.00$1,750.00$1,250.00$1,350.00$1,300.00
50 (604.4048)LF41$1,036.00$1,750.00$1,100.00$1,700.00$1,100.00
51 (604.4060)LF6$2,000.00$1,750.00$1,350.00$2,100.00$1,350.00
52 (604.50180010)21$5,000.00$1,350.00$2,750.00$6,700.00$1,700.00
53Underdrain Filter, Type I (605.0901)CY503$133.00$115.00$185.00$120.00$350.00
54 (605.1501)LF10,172$4.75$20.00$7.00$11.00$9.00
55Corrugated Beam Guide Railing End Terminal (Energy-Absorbing) (606.26)EACH2$9,700.00$10,000$10,000$10,700$9,700.00
56HPBO (Mod.) Corrugated Beam Guide Railing (606.2701)LF60$70.00$70.00$75.00$80.00$70.00
57Removing and Disposing Corrugated Beam Guide Railing (606.71)LF60$12.50$10.00$17.00$7.00$5.36
58Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910)EACH2$640.00$250.00$750.00$500.00$434.80
59 (607.41010010)3,300$7.00$5.00$6.00$5.00$4.51
60Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013)QUALITY UNIT26$70.00$70.00$70.00$70.00$70.00
61Concrete Sidewalks and Driveways (608.0101)CY678$845.00$1,500.00$800.00$1,250.00$1,300.00
62Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON528$256.50$225.00$350.00$285.00$290.00
63 (608.21000003)78$450.00$470.00$300.00$600.00$405.00
64Stone Curb – Near Vertical Face (NVF) (609.0212)LF2,177$89.00$125.00$125.00$115.00$88.00
65Resetting Existing Curb (609.15)LF8,233$59.00$75.00$75.00$42.00$71.00
66 (610.14000011)2,189$204.50$200.00$140.00$225.00$205.00
67Topsoil - Lawns (610.1403)CY635$99.90$54.00$200.00$195.00$210.00
68Sodding (610.18)SY7,600$9.60$12.50$12.00$11.85$11.72
69Watering Vegetation (610.19)1,000 GALLONS371$22.60$10.00$40.00$35.00$36.31
70 (611.0152)EACH15$630.00$1,150.00$850.00$820.00$824.84
71 (611.0281)EACH5$583.00$1,150.00$700.00$700.00$705.52
72Portable Drip Irrigation System (611.17)EACH20$97.10$40.00$38.00$37.00$36.31
73Removal of Portable Drip Irrigation System (611.18)EACH20$32.10$40.00$38.00$37.00$36.31
74 (614.060401)EACH2$2,890.00$3,000.00$2,200.00$2,400.00$1,725.00
75 (614.060501)EACH2$4,590.00$5,000.00$3,300.00$3,200.00$2,300.00
76 (614.060601)EACH2$6,790.00$7,000.00$4,700.00$4,700.00$3,450.00
77Pre-Existing Stump Removal up to 24” diameter at 6 inches above grade (614.0701)EACH2$650.00$600.00$800.00$1,100.00$745.00
78Pre-Existing Stump Removal over 24” to 48” diameter at 6 inches above grade (614.0702)EACH4$700.00$1,200.00$1,750.00$1,400.00$950.00
79 (614.08110009)794$414.00$300.00$200.00$316.00$275.94
80Basic Work Zone Traffic Control (619.01)LS1$1,377,496$1,152,919$325,000$1,226,453$1,784,254
81Type III Construction Barricades (619.04)EACH81$110.00$100.00$150.00$300.00$30.00
82 (619.080102)LF31,110$1.00$1.00$1.10$1.00$1.00
83Cover Existing Pavement Marking Letters or Symbols (Removable Tape) (619.0804)EACH5$100.00$100.00$110.00$320.00$100.00
84 (619.100102)LF20,830$0.55$1.00$0.60$0.58$1.22
85 (619.111112)EACH8$1,300.00$15,000$7,500.00$20,000$27,000
86Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613)MONTH24$135.00$100.00$150.00$79.00$75.00
87Nighttime Operations (Entire Project) (619.24)LS1$50,000$75,000$35,000$50,000$40,000
88Traffic Control Supervisor (619.25)MONTH1$20,000$10,000$25,000$25,000$40,000
89Cleaning Drainage Structures (621.04)EACH6$658.00$550.00$700.00$1,000.00$658.33
90Survey Operations (625.01)LS1$100,000$50,000$150,000$120,000$90,000
91 (627.50140008)32,127$3.50$0.10$7.00$6.20$5.51
92Concrete Cylinder Curing Equipment (637.04)EACH1$3,500.00$3,000.00$2,500.00$10,000$5,000.00
93Engineer’s Field Office – Type 2 (637.12)MONTH18$3,500.00$3,000.00$3,500.00$2,800.00$3,825.00
94Partnering Workshop (637.35)DOL5,000$1.00$1.00$1.00$1.00$1.00
95Construction Testing supplies – Consumables (637.36)DOL100$1.00$1.00$1.00$1.00$1.00
96Ground-Mounted Sign Panels without Z-bars (645.5101)SF35$66.75$65.00$70.00$74.00$66.75
97Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF750$40.00$40.00$42.00$44.00$40.00
98Type A Sign Posts (645.81)EACH208$189.00$200.00$200.00$209.00$189.00
99 (645.81090003)56$73.75$75.00$80.00$82.00$73.75
100Reference Marker Panel (646.21)EACH10$39.00$40.00$42.00$43.00$39.00
101Steel Post, 2.0 lb/ft (646.32)EACH10$86.25$100.00$90.00$96.00$86.25
102Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH129$6.50$50.00$7.50$7.50$6.50
103 (655.07030010)9$1,850.00$2,025.00$2,500.00$1,800.00$1,100.00
104Cast Frame F3, UnMountable Curb Box CU3 & Reticuline Grate G3 (655.0706)EACH46$1,800.00$1,750.00$2,900.00$2,100.00$3,200.00
105Welded Frame & Reticuline Grate 22 (655.1122)EACH6$1,500.00$1,750.00$2,225.00$1,500.00$2,500.00
106Manhole Frame & Grate (655.1201)EACH1$1,400.00$1,325.00$2,000.00$850.00$2,000.00
107Manhole Frame & Cover (655.1202)EACH4$1,225.00$1,325.00$2,000.00$820.00$1,880.00
108 (662.60000115)LS1$4,000.00$4,000.00$4,000.00$4,000.00$4,000.00
109 (662.60000215)LS1$1,000.00$1,000.00$1,000.00$1,000.00$1,000.00
110 (662.60000315)LS1$1,000.00$1,000.00$1,000.00$1,000.00$1,000.00
111 (662.60000415)LS1$1,000.00$1,000.00$1,000.00$1,000.00$1,000.00
112 (663.0104)LF100$168.00$150.00$200.00$250.00$300.00
113 (663.0106)LF60$157.25$150.00$350.00$155.00$325.00
114 (663.0108)LF5,685$143.00$250.00$74.00$170.00$335.00
115 (663.0603)LF3,679$21.25$8.15$75.00$120.00$70.00
116 (663.0604)LF60$26.50$15.50$110.00$125.00$70.00
117 (663.0607)LF114$57.00$31.50$120.00$140.00$74.00
118 (663.1008)EACH12$3,275.00$3,500.00$2,750.00$3,800.00$4,000.00
119 (663.1301)EACH1$11,300$15,000$10,000$12,000$10,000
120 (663.1302)EACH1$11,300$15,000$10,000$12,000$10,000
121 (663.1303)EACH1$11,300$15,000$10,000$12,800$10,000
122 (663.1304)EACH1$11,300$15,000$10,000$12,200$10,000
123 (663.1305)EACH1$11,300$15,000$10,000$12,000$10,000
124 (663.1306)EACH1$11,300$15,000$10,000$12,200$10,000
125 (663.1307)EACH1$11,300$15,000$10,000$12,200$10,000
126 (663.1308)EACH1$11,300$15,000$10,000$12,500$10,000
127 (663.1309)EACH1$11,300$15,000$10,000$12,500$10,000
128 (663.1310)EACH1$11,300$15,000$10,000$12,800$10,000
129 (663.160404)EACH9$8,000.00$8,000.00$7,500.00$8,500.00$6,000.00
130 (663.160606)EACH7$8,750.00$12,000$8,000.00$9,200.00$8,000.00
131 (663.160808)EACH1$10,100$20,000$9,500.00$11,000$90,000
132 (663.1708)EACH1$17,000$25,000$10,000$20,000$20,000
133Iron Water Main Fittings (3 - 8 inch diameter) (663.2001)LB8,536$7.25$6.00$5.50$19.00$12.00
134 (663.2104)EACH37$89.00$75.00$70.00$250.00$125.00
135 (663.2106)EACH104$104.00$95.00$100.00$300.00$160.00
136 (663.2108)EACH39$200.00$125.00$130.00$350.00$200.00
137 (663.2304)LF486$1.50$0.50$0.10$1.00$5.00
138 (663.2306)LF278$1.25$1.00$0.10$1.00$5.00
139 (663.2308)LF4,960$1.00$0.50$0.10$1.00$5.00
140 (663.2503)EACH91$2,050.00$4,000.00$450.00$300.00$2,000.00
141 (663.2504)EACH1$2,100.00$6,000.00$450.00$500.00$1,200.00
142 (663.2507)EACH2$2,500.00$6,000.00$850.00$1,000.00$1,000.00
143 (663.2603)EACH91$430.00$500.00$500.00$600.00$1,400.00
144 (663.2604)EACH1$485.00$500.00$550.00$1,000.00$1,950.00
145 (663.2607)EACH2$1,000.00$1,000.00$1,000.00$2,000.00$2,000.00
146Disconnect and Cap Existing Water Main (663.40)EACH19$2,200.00$5,000.00$10,000$1,800.00$11,000
147Remove and Dispose of Existing Hydrant (663.43)EACH8$2,750.00$2,000.00$500.00$1,500.00$1,000.00
148 (680.05010007)2$19,500$20,000$20,000$23,000$21,995
149Pole Excavation and Concrete Foundation (680.5001)CY16.30$1,445.00$2,500.00$1,650.00$2,600.00$2,720.00
150 (680.510501)EACH2$1,430.00$4,000.00$1,500.00$1,900.00$1,795.00
151 (680.51100010)9$155.00$350.00$165.00$240.00$225.00
152 (680.520106)LF200$21.60$30.00$22.50$32.00$30.25
153 (680.53010010)495$7.25$5.00$7.50$3.40$3.25
154 (680.53080305)42$11.00$5.00$12.00$9.00$8.20
155Inductance Loop Installation (680.54)LF803$13.65$15.00$14.00$15.75$15.00
156 (680.670802)EACH14$1,400.00$1,000.00$1,450.00$1,200.00$1,135.00
157Riser Assembly, 1-inch Diameter (680.700603)EACH2$675.00$500.00$700.00$550.00$525.00
158Inductance Loop Wire (680.72)LF2,296$0.70$0.25$0.75$0.53$0.50
159 (680.730714)LF1,675$4.00$5.00$4.25$5.70$5.45
160 (680.79000105)1$3,500.00$2,000.00$3,750.00$3,550.00$3,375.00
161 (680.79000205)1$3,500.00$2,000.00$3,750.00$3,800.00$3,625.00
162 (680.80324515)2$1,500.00$8,000.00$1,600.00$2,400.00$2,280.00
163Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105)EACH14$235.00$400.00$250.00$210.00$200.00
164Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106)EACH28$260.00$200.00$275.00$290.00$275.00
165Pedestrian Signal Post Top Mount Assembly (680.8142)EACH14$315.00$600.00$325.00$290.00$275.00
166Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001)EACH14$1,305.00$400.00$250.00$212.00$203.00
167 (680.8151)EACH14$235.00$100.00$1,400.00$1,100.00$1,050.00
168 (680.82254110)6$13,925$7,000.00$15,000$15,000$14,325
169 (680.90920103)2$735.00$700.00$800.00$805.00$765.00
170Install Electrical Disconnect/Generator Transfer Switch (680.9499)EACH2$380.00$500.00$400.00$710.00$675.00
171 (680.950106)LF250$3.70$1.50$3.75$2.62$2.50
172Performance Concrete Quality Adjustment (680.99)QUALITY UNIT1$12.50$12.50$12.50$12.50$12.50
173White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF899$1.25$1.50$1.30$0.58$1.25
174Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF9,805$0.75$1.00$0.80$0.58$0.75
175White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104)LF4,033$2.25$2.50$2.35$2.90$2.25
176White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404)EACH9$200.00$200.00$210.00$310.00$200.00
177 (691.04000020)75,600$1.00$1.00$1.00$1.00$1.00
178Field Change Payment (FCP) (697.03)DOL995,000$1.00$1.00$1.00$1.00$1.00
179Asphalt Price Adjustment (698.04)DOL21,340.85$1.00$1.00$1.00$1.00$1.00
180Fuel Price Adjustment (698.05)DOL8,397$1.00$1.00$1.00$1.00$1.00
181Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00
182Mobilization (699.040001)LS1$533,500$460,000$500,000$625,000$760,000
NYSDOT contract D265423: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of February 27, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy