NYSDOT contract D265541 bid tabulation

GUIDE RAIL REPLACEMENT SFY 25. Let by New York State DOT on September 11, 2025, Albany, Greene, Rensselaer, Region 01. 3 bids received; low bid $3,039,000 by Elderlee Inc.

Owner
New York State DOT
Letting
11 SEP 2025
Pay items
30
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Elderlee Inc$3,039,000Low
2Emi Guide Rail LLC$3,249,176+7.0%
3Road Safety Systems LLC$3,599,875+18%
NYSDOT contract D265541: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Elderlee Inc2. Emi Guide Rail LLC3. Road Safety Systems LLC
1Unclassified Excavation and Disposal (203.02)CY16$70.00$68.00$354.17
2 (203.24010017)1,540$76.00$128.00$201.25
3Subbase Course, Type 2 (304.12)CY101$85.00$37.50$130.20
4 (568.70020002)50$250.00$153.50$210.50
5 (603.9824)LF56$80.00$60.50$220.98
6Box Beam Guide Railing (606.10)LF29,343$40.00$38.75$41.73
7Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002)LF3,181$49.00$47.00$52.83
8Box Beam Guide Railing With Extra Long Posts (606.1001)LF5,454$43.00$42.00$46.21
9Box Beam End Piece (606.120101)EACH18$740.00$535.00$868.61
10Box Beam Guide Railing End Assembly Type I (606.120102)EACH28$3,700.00$3,655.00$4,810.63
11Box Beam Guide Railing End Assembly Type IIA (606.120201)EACH96$2,000.00$1,860.00$2,021.23
12Box Beam End Assembly Type III (606.1203)EACH36$5,000.00$6,925.00$6,604.66
13Removing and Disposing Cable Guide Railing (606.70)LF20,952$1.00$2.75$1.35
14Removing and Disposing Corrugated Beam Guide Railing (606.71)LF8,786$1.00$3.50$3.23
15Removing and Disposing Box Beam Guide Railing (606.73)LF8,513$2.00$6.00$3.33
16Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79)EACH112$250.00$515.00$378.35
17Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910)EACH46$250.00$515.00$460.59
18Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920)EACH56$50.00$185.00$504.46
19Turf Establishment – Performance (610.1605)SY10,560$7.00$5.00$10.89
20Basic Work Zone Traffic Control (619.01)LS1$254,472$274,500$238,625
21 (619.111213)WEEK40$500.00$650.00$1,437.50
22Mailboxes (619.27)EACH34$250.00$200.00$415.45
23Engineer’s Field Office – Type 2 (637.12)MONTH12$3,000.00$2,500.00$3,750.00
24Office Technology and Supplies (637.34)DOL1,000$1.00$1.00$1.00
25Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23)EACH296$16.00$22.50$10.00
26Steel Post, 2.0 lb/ft (646.32)EACH296$62.00$72.75$40.00
27Field Change Payment (FCP) (697.03)DOL220,000$1.00$1.00$1.00
28Fuel Price Adjustment (698.05)DOL100$1.00$1.00$1.00
29Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00
30Mobilization (699.040001)LS1$116,000$110,000$138,457
NYSDOT contract D265541: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of September 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy