Emi Guide Rail LLC: NYSDOT bid record

Emi Guide Rail LLC submitted 22 bids on New York State DOT contracts in the data, from 20 JAN 2022 to 27 AUG 2026, and was the low bidder on 7 of them (32%). When it was not low, its total sat a median +13% above the low bid.

Owner
New York State DOT
Low bid volume
$19,292,294
Latest bid
27 AUG 2026
Data through
15 OCT 2026
22Bids
7Low bids
32Win rate, percent
+13%Median gap to the low bid when not low, 15 bids

By year

YearBidsLow bidsWin rate
20225360%
2023500%
20242150%
20254125%
20266233%
Emi Guide Rail LLC, NYSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
Region 096233%
Region 016350%
Region 023133%
Region 01, 02, 07200%
Region 072150%
Region 03200%
Region 08100%
Emi Guide Rail LLC, NYSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Field Change Payment (FCP)697.03DOL2222 (100%)$1.00$1.00
Fuel Price Adjustment698.05DOL2222 (100%)$1.00$1.00
Steel/Iron Price Adjustment698.06DOL2222 (100%)$1.00$1.00
Office Technology and Supplies637.34DOL2020 (100%)$1.00$1.00
Asphalt Price Adjustment698.04DOL1313 (100%)$1.00$1.00
Box Beam End Piece606.120101EACH1512 (80%)$600.00$750.00
Engineer’s Field Office – Type 2637.12MONTH1212 (100%)$2,500.00$2,500.00
Box Beam Guide Railing (Shop Bent or Shop Mitered)606.100002LF1511 (73%)$52.00$63.50
Box Beam Guide Railing606.10LF178 (47%)$46.00$55.00
Removing and Disposing Box Beam Guide Railing606.73LF158 (53%)$3.00$6.00
Mailboxes619.27EACH98 (89%)$150.00$325.00
Steel Post, 2.0 lb/ft646.32EACH217 (33%)$73.50$85.00
Emi Guide Rail LLC, NYSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Elderlee Inc2213 of 22
Mohegan Associates Inc41 of 4
Road Safety Systems LLC41 of 4
US Traffic Control Inc32 of 3
Power Line Constructors Inc30 of 3
Amity Construction Corp.20 of 2
Economy Paving Co Inc21 of 2
O H Striping Inc20 of 2
J Fletcher Creamer & Son Inc10 of 1
Westcraft Builders Inc10 of 1
Emi Guide Rail LLC, NYSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
27 AUG 2026D265825Region 01Guide Rail Replacement SFY261 of 3$2,598,783Low, 12% under the second
16 APR 2026D265765Region 09HIGHWAY SIGN INSTALLATION - Various Locations4 of 6$3,195,299+18%
09 APR 2026D265760Region 03Regional SAFETAP Project2 of 2$2,989,4040.0%
26 MAR 2026D265718Region 07GUIDE RAIL REPLACEMENT2 of 2$8,499,996+43%
26 FEB 2026D265703Region 092026 Guiderail Requirements Contract1 of 3$2,185,444Low, 1.0% under the second
05 FEB 2026D265687Region 03Ground Mounted Sign Replacement Project, Various locations2 of 6$592,999+22%
11 SEP 2025D265541Region 01GUIDE RAIL REPLACEMENT SFY 252 of 3$3,249,176+7.0%
10 JUL 2025D265538Region 07CURVE WARNING SIGN UPGRADES - I-81 & I-871 of 5$675,315Low, 5.0% under the second
05 JUN 2025D265510Region 01, 02, 07Sign Requirements Contract, Upstate East2 of 2$3,128,183+14%
20 FEB 2025D265354Region 09GUIDE RAIL REPLACEMENT SFY 25 - NYS Rt 206 & NYS Rt 82 of 2$2,804,428+16%
26 SEP 2024D265318Region 01Guide Rail Replacement SFY 242 of 3$2,482,402+10%
11 JAN 2024D265134Region 02RUSTIC GUIDERAIL & SIGN REPLACEMENTS PROJECT1 of 2$4,173,175Low, 3.0% under the second
09 NOV 2023D265116Region 09GUIDERAIL REHAB AND IMPROVEMENTS CONTRACT2 of 3$2,303,308+2.0%
14 SEP 2023D265079Region 08Guiderail Replacement: Interstate 84, Orange County2 of 5$1,898,389+13%
15 JUN 2023D265038Region 01GUIDE RAIL REPLACEMENT 20232 of 3$2,465,578+1.0%
23 MAR 2023D265005Region 09GUIDERAIL REQUIREMENTS CONTRACT2 of 2$2,324,250+1.0%
16 FEB 2023D264978Region 02GUIDE RAIL & SIGNS WORK IN VARIOUS COUNTIES ACROSS REGION 22 of 2$6,545,479+17%
20 OCT 2022D264893Region 01Guide Rail Replacement SFY 20221 of 2$5,261,683Low, 1.0% under the second
07 JUL 2022D264807Region 02OVERHEAD SIGN STRUCTURE NYSDOT Region-23 of 3$2,962,373+18%
16 JUN 2022D264805Region 01RUSTIC RAIL REPLACEMENT1 of 4$1,875,000Low, 10% under the second
02 JUN 2022D264823Region 01, 02, 07Sign Requirements Contract, UpState East, Regions 1,2 & 72 of 2$1,353,056+6.0%
20 JAN 2022D264690Region 09GUIDERAIL REQUIREMENTS CONTRACT, Various Locations1 of 2$2,522,895Low, 1.0% under the second
Emi Guide Rail LLC: latest NYSDOT bids in the data

How this record was read

NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

  • Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy