NYSDOT contract D265538 bid tabulation
CURVE WARNING SIGN UPGRADES - I-81 & I-87. Let by New York State DOT on July 10, 2025, Clinton, Jefferson, Region 07. 5 bids received; low bid $675,315 by Emi Guide Rail LLC.
- Owner
- New York State DOT
- Letting
- 10 JUL 2025
- Pay items
- 12
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Emi Guide Rail LLC | $675,315 | Low |
| 2 | Elderlee Inc | $707,410 | +5.0% |
| 3 | US Traffic Control Inc | $745,400 | +10% |
| 4 | O H Striping Inc | $749,380 | +11% |
| 5 | Power Line Constructors Inc | $818,951 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Emi Guide Rail LLC | 2. Elderlee Inc | 3. US Traffic Control Inc | 4. O H Striping Inc | 5. Power Line Constructors Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Basic Work Zone Traffic Control (Daily Operations) (619.0101) | LS | 1 | $100,000 | $82,120 | $100,000 | $150,027 | $189,673 |
| 2 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 16 | $2,000.00 | $3,000.00 | $2,000.00 | $2,500.00 | $2,400.00 |
| 3 | Office Technology and Supplies (637.34) | DOL | 2,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 4 | (637.41000115) | 16 | $400.00 | $250.00 | $100.00 | $300.00 | $750.00 | |
| 5 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 7,269 | $24.00 | $34.00 | $38.00 | $19.87 | $21.61 |
| 6 | Type A Sign Posts (645.81) | EACH | 1,264 | $225.00 | $185.00 | $195.00 | $252.50 | $257.00 |
| 7 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 11 | $200.00 | $200.00 | $150.00 | $199.00 | $602.00 |
| 8 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 173 | $10.00 | $75.00 | $50.00 | $56.75 | $87.84 |
| 9 | Field Change Payment (FCP) (697.03) | DOL | 47,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 10 | Fuel Price Adjustment (698.05) | DOL | 529 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 11 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 12 | Mobilization (699.040001) | LS | 1 | $24,000 | $27,000 | $28,669 | $28,822 | $25,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of July 10, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.