NYSDOT contract D265706 bid tabulation

Guiderail Repair/Replace, various locations. Let by New York State DOT on February 5, 2026, Allegany, Chemung, Schuyler, Steuben,, Region 06. 2 bids received; low bid $516,670 by Pavilion Drainage Supply Co Inc.

Owner
New York State DOT
Letting
05 FEB 2026
Pay items
26
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Pavilion Drainage Supply Co Inc$516,670Low
2Elderlee Inc$592,388+15%
NYSDOT contract D265706: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Pavilion Drainage Supply Co Inc2. Elderlee Inc
1Clearing and Grubbing (201.06)LS1$1,000.00$2,000.00
2 (203.24010017)191$149.00$140.00
3Box Beam Guide Railing (606.10)LF4,720$49.40$50.00
4Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002)LF7$60.00$150.00
5Box Beam End Piece (606.120101)EACH2$800.00$900.00
6Box Beam Guide Railing End Assembly Type IIA (606.120201)EACH21$2,035.00$2,800.00
7Box Beam End Assembly Type III (606.1203)EACH2$6,700.00$6,100.00
8 (606.53480002)1,390$37.30$45.00
9Removing and Storing Corrugated Beam Guide Railing (606.61)LF725$5.40$6.00
10Removing and Storing Box Beam Guide Railing (606.63)LF2,738$7.35$6.00
11Removing and Storing Anchorage Units for Corrugated Beam Guide Railing and Median Barriers (606.6910)EACH3$285.00$650.00
12Removing and Storing Box Beam Guide Railing End Assembly (606.6920)EACH18$95.00$65.00
13Removing and Disposing Cable Guide Railing (606.70)LF1,340$1.90$4.00
14Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79)EACH2$190.00$650.00
15Guide Rail Transition Weak-Post Corrugated Beam to Box Beam Guide Rail (One or Two Way Operation) (606.8101)EACH1$7,275.00$10,000
16Basic Work Zone Traffic Control (619.01)LS1$40,000$68,900
17Engineer’s Field Office – Type 1 (637.11)MONTH8$2,370.00$4,000.00
18Office Technology and Supplies (637.34)DOL200$1.00$1.00
19Construction Testing supplies – Consumables (637.36)DOL200$1.00$1.00
20Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23)EACH79$21.60$30.00
21Steel Post, 2.0 lb/ft (646.32)EACH62$86.60$60.00
22Field Change Payment (FCP) (697.03)DOL21,000$1.00$1.00
23Asphalt Price Adjustment (698.04)DOL100$1.00$1.00
24Fuel Price Adjustment (698.05)DOL100$1.00$1.00
25Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00
26Mobilization (699.040001)LS1$19,500$22,000
NYSDOT contract D265706: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of February 5, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy