NYSDOT contract D265838 bid tabulation
Guiderail Replacement Project; US-62. Let by New York State DOT on October 15, 2026, Cattaraugus, Chautauqua, Region 05. 3 bids received; low bid $1,334,215 by McLaughlin Construction Corp/DBA Edbauer Construction.
- Owner
- New York State DOT
- Letting
- 15 OCT 2026
- Pay items
- 43
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | McLaughlin Construction Corp/DBA Edbauer Construction | $1,334,215 | Low |
| 2 | Lake Shore Paving Inc | $1,385,382 | +4.0% |
| 3 | Elderlee Inc | $2,214,849 | +66% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. McLaughlin Construction Corp/DBA Edbauer Construction | 2. Lake Shore Paving Inc | 3. Elderlee Inc |
|---|---|---|---|---|---|---|
| 1 | (201.07000004) | 2,708 | $1.00 | $2.50 | $24.00 | |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 459 | $125.00 | $145.78 | $400.00 |
| 3 | Embankment In Place (203.03) | CY | 264 | $10.00 | $82.93 | $265.00 |
| 4 | Select Granular Fill (203.07) | CY | 91 | $65.00 | $207.68 | $180.00 |
| 5 | Trench and Culvert Excavation (206.0201) | CY | 177 | $26.00 | $103.15 | $425.00 |
| 6 | Geotextile Bedding (207.20) | SY | 38 | $26.00 | $12.06 | $120.00 |
| 7 | Seed and Mulch – Temporary (209.1003) | SY | 111 | $1.00 | $5.55 | $50.00 |
| 8 | (304.15200005) | 177 | $175.00 | $128.45 | $540.00 | |
| 9 | Culvert-End Safety Grate (603.0101) | SF | 210 | $36.00 | $56.78 | $135.00 |
| 10 | (603.171416) | EACH | 16 | $650.00 | $1,248.83 | $700.00 |
| 11 | (603.541614) | EACH | 1 | $2,150.00 | $2,942.57 | $2,800.00 |
| 12 | (603.9818) | LF | 227 | $70.00 | $25.33 | $240.00 |
| 13 | (603.9824) | LF | 25 | $104.00 | $60.25 | $340.00 |
| 14 | Box Beam Guide Railing (606.10) | LF | 7,864 | $65.00 | $65.34 | $70.00 |
| 15 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 132 | $70.00 | $70.17 | $80.00 |
| 16 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 16 | $5,527.00 | $5,535.70 | $5,900.00 |
| 17 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 17 | $2,592.00 | $2,595.90 | $3,200.00 |
| 18 | Box Beam End Assembly Type III (606.1203) | EACH | 13 | $8,102.00 | $8,114.95 | $8,100.00 |
| 19 | Removing and Storing Corrugated Beam Guide Railing (606.61) | LF | 8,646 | $4.50 | $5.82 | $4.00 |
| 20 | Removing and Storing Anchorage Units for Corrugated Beam Guide Railing and Median Barriers (606.6910) | EACH | 48 | $50.00 | $676.71 | $160.00 |
| 21 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 40 | $8.00 | $5.82 | $3.00 |
| 22 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 1 | $140.00 | $83.20 | $160.00 |
| 23 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 372 | $385.00 | $265.36 | $600.00 |
| 24 | Topsoil - Roadside (610.1402) | CY | 5 | $100.00 | $255.86 | $300.00 |
| 25 | Turf Establishment - Roadside (610.1601) | SY | 311 | $1.50 | $5.55 | $130.00 |
| 26 | (617.10000024) | 2 | $50.00 | $596.00 | $500.00 | |
| 27 | (617.11000024) | LS | 1 | $100.00 | $322.00 | $1,000.00 |
| 28 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $123,589 | $136,000 | $310,833 |
| 29 | Mailboxes (619.27) | EACH | 1 | $150.00 | $200.00 | $600.00 |
| 30 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 | $1.00 |
| 31 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 32 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 65 | $57.00 | $57.13 | $45.00 |
| 33 | Type A Sign Posts (645.81) | EACH | 12 | $258.00 | $257.93 | $300.00 |
| 34 | Reference Marker Panel (646.21) | EACH | 5 | $49.00 | $48.81 | $40.00 |
| 35 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 102 | $23.00 | $23.02 | $40.00 |
| 36 | Steel Post, 2.0 lb/ft (646.32) | EACH | 102 | $110.00 | $99.84 | $80.00 |
| 37 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 12 | $7.00 | $6.66 | $100.00 |
| 38 | (647.83001002) | 59 | $10.00 | $5.55 | $40.00 | |
| 39 | Field Change Payment (FCP) (697.03) | DOL | 49,000 | $1.00 | $1.00 | $1.00 |
| 40 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 41 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 42 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 43 | Mobilization (699.040001) | LS | 1 | $51,000 | $33,000 | $85,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of October 15, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.