NYSDOT contract D265824 bid tabulation
I-684 SAFETY GUIDERAIL TERMNAL REPLACEMENTS. Let by New York State DOT on July 30, 2026, Westchester, Region 08. 3 bids received; low bid $406,247 by Road Safety Systems LLC.
- Owner
- New York State DOT
- Letting
- 30 JUL 2026
- Pay items
- 21
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Road Safety Systems LLC | $406,247 | Low |
| 2 | J Fletcher Creamer & Son Inc | $595,740 | +47% |
| 3 | Elderlee Inc | $751,871 | +85% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Road Safety Systems LLC | 2. J Fletcher Creamer & Son Inc | 3. Elderlee Inc |
|---|---|---|---|---|---|---|
| 1 | (203.24010017) | 19 | $540.00 | $95.00 | $840.00 | |
| 2 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 1,927 | $1.00 | $7.00 | $6.00 |
| 3 | Box Beam End Assembly Type III (606.1203) | EACH | 2 | $10,300 | $7,500.00 | $13,000 |
| 4 | HPBO (Mod.) Corrugated Beam Guide Railing End Terminal (Energy-Absorbing) (606.27) | EACH | 13 | $6,250.00 | $4,500.00 | $8,000.00 |
| 5 | HPBO (Mod.) Corrugated Beam Guide Railing (606.2701) | LF | 1,430 | $46.00 | $70.00 | $65.00 |
| 6 | Removing and Disposing HPBO (Mod.) Corrugated Beam Guide Railing (606.7101) | LF | 1,430 | $5.00 | $5.00 | $28.00 |
| 7 | Removing and Disposing Weak- and Heavy-Post Corrugated Beam Energy-Absorbing Terminals (606.7911) | EACH | 13 | $250.00 | $1,000.00 | $1,700.00 |
| 8 | Removing and Disposing Box Beam Energy-Absorbing Terminal (606.7921) | EACH | 2 | $250.00 | $1,000.00 | $3,000.00 |
| 9 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 212 | $150.00 | $625.00 | $470.00 |
| 10 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $97,100 | $59,076 | $157,779 |
| 11 | (619.110512) | EACH | 2 | $5,400.00 | $2,500.00 | $8,000.00 |
| 12 | (621.05020004) | 1,880 | $2.50 | $39.00 | $20.00 | |
| 13 | Survey Operations (625.01) | LS | 1 | $3,850.00 | $2,500.00 | $400.00 |
| 14 | (627.50140008) | 1,880 | $1.00 | $7.00 | $8.00 | |
| 15 | Engineer’s Field Office – Type 1 (637.11) | MONTH | 9 | $2,900.00 | $6,000.00 | $6,000.00 |
| 16 | Office Technology and Supplies (637.34) | DOL | 2,000 | $1.00 | $1.00 | $1.00 |
| 17 | Field Change Payment (FCP) (697.03) | DOL | 22,000 | $1.00 | $1.00 | $1.00 |
| 18 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 19 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 20 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 21 | Mobilization (699.040001) | LS | 1 | $15,000 | $20,840 | $28,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of July 30, 2026. Compiled by Mirage Metrics.