NYSDOT contract D265623 bid tabulation
HIGHWAY SIGN REPLACEMENT - Various Routes. Let by New York State DOT on January 22, 2026, Albany, Saratoga, Region 01. 2 bids received; low bid $3,900,868 by Road Safety Systems LLC.
- Owner
- New York State DOT
- Letting
- 22 JAN 2026
- Pay items
- 57
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Road Safety Systems LLC | $3,900,868 | Low |
| 2 | D A Collins Construction Co Inc | $4,399,808 | +13% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Road Safety Systems LLC | 2. D A Collins Construction Co Inc |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.07) | ACRE | 1 | $18,600 | $20,500 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 20 | $340.00 | $170.00 |
| 3 | (203.24010017) | 20 | $334.00 | $165.00 | |
| 4 | Test Pit Excavation (206.05) | EACH | 10 | $1,740.00 | $5,300.00 |
| 5 | Mulch – Temporary (209.100101) | SY | 50 | $19.00 | $79.50 |
| 6 | Silt Fence - Temporary (209.13) | LF | 100 | $12.00 | $27.50 |
| 7 | (564.510001) | LB | 34 | $46.00 | $41.00 |
| 8 | (570.160001) | LS | 1 | $23,000 | $2,450.00 |
| 9 | (573.010001) | LS | 1 | $32,000 | $12,300 |
| 10 | (589.520001) | EACH | 1 | $2,600.00 | $4,100.00 |
| 11 | Box Beam Guide Railing (606.10) | LF | 138 | $100.00 | $115.00 |
| 12 | Box Beam Median Barrier (606.11) | LF | 291 | $85.00 | $100.00 |
| 13 | Box Beam Median Barrier (Shop Bent or Shop Mitered) (606.110002) | LF | 200 | $101.00 | $125.00 |
| 14 | Box Beam End Piece (606.120101) | EACH | 2 | $1,004.00 | $1,100.00 |
| 15 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 29 | $4.00 | $6.00 |
| 16 | Removing and Disposing Box Beam Median Barrier (606.74) | LF | 518 | $5.00 | $7.20 |
| 17 | Topsoil - Roadside (610.1402) | CY | 15 | $64.00 | $515.00 |
| 18 | Turf Establishment - Roadside (610.1601) | SY | 50 | $115.00 | $105.00 |
| 19 | (614.060202) | EACH | 4 | $3,300.00 | $1,550.00 |
| 20 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $628,000 | $1,302,000 |
| 21 | Type III Construction Barricades (619.04) | EACH | 25 | $275.00 | $66.00 |
| 22 | (619.111213) | WEEK | 20 | $1,335.00 | $595.00 |
| 23 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $225,000 | $94,800 |
| 24 | Survey Operations (625.01) | LS | 1 | $141,000 | $46,100 |
| 25 | (625.070001) | LS | 1 | $6,800.00 | $6,000.00 |
| 26 | (625.070002) | LS | 1 | $6,800.00 | $6,000.00 |
| 27 | (625.070004) | LS | 1 | $6,800.00 | $6,000.00 |
| 28 | (625.070005) | LS | 1 | $6,800.00 | $6,000.00 |
| 29 | (625.070006) | LS | 1 | $6,800.00 | $6,000.00 |
| 30 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $18,000 | $1,950.00 |
| 31 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 12 | $3,500.00 | $4,600.00 |
| 32 | Rain Gauge (637.26) | EACH | 1 | $300.00 | $195.00 |
| 33 | Office Technology and Supplies (637.34) | DOL | 1,000 | $1.00 | $1.00 |
| 34 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 |
| 35 | Anchor Bolts (644.11) | LB | 6,268 | $9.00 | $11.50 |
| 36 | Drilled Shaft for Overhead Sign Structures (644.20) | CY | 192 | $4,650.00 | $4,250.00 |
| 37 | (644.432560) | EACH | 1 | $225,000 | $165,000 |
| 38 | (644.433060) | EACH | 1 | $150,000 | $185,000 |
| 39 | (644.433560) | EACH | 1 | $173,000 | $210,000 |
| 40 | (644.433590) | EACH | 1 | $203,000 | $235,000 |
| 41 | (644.434090) | EACH | 1 | $248,000 | $255,000 |
| 42 | Performance Concrete Quality Adjustment (644.99) | QUALITY UNIT | 1 | $20.00 | $20.00 |
| 43 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 322.90 | $78.40 | $57.00 |
| 44 | Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103) | SF | 45 | $65.00 | $52.50 |
| 45 | Overhead Sign Panels (645.61) | SF | 2,729.60 | $55.00 | $69.50 |
| 46 | Type A Sign Posts (645.81) | EACH | 41 | $700.00 | $380.00 |
| 47 | Reference Marker Panel (646.21) | EACH | 2 | $300.00 | $58.50 |
| 48 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 5 | $118.00 | $36.50 |
| 49 | Steel Post, 2.0 lb/ft (646.32) | EACH | 5 | $310.00 | $115.00 |
| 50 | Removal of Single Span Overhead Sign Panel(s), Structure, and Foundations (647.21) | EACH | 5 | $30,000 | $39,600 |
| 51 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 15 | $60.00 | $72.00 |
| 52 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62) | EACH | 1 | $1,500.00 | $84.00 |
| 53 | Field Change Payment (FCP) (697.03) | DOL | 123,000 | $1.00 | $1.00 |
| 54 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 |
| 55 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 |
| 56 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 57 | Mobilization (699.040001) | LS | 1 | $150,000 | $165,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of January 22, 2026. Compiled by Mirage Metrics.