NYSDOT contract D265780 bid tabulation
Guiderail Replacement: Interstate 84 West Orange County. Let by New York State DOT on March 26, 2026, Orange, Region 08. 2 bids received; low bid $2,287,407 by J Fletcher Creamer & Son Inc.
- Owner
- New York State DOT
- Letting
- 26 MAR 2026
- Pay items
- 22
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | J Fletcher Creamer & Son Inc | $2,287,407 | Low |
| 2 | Road Safety Systems LLC | $2,435,491 | +6.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. J Fletcher Creamer & Son Inc | 2. Road Safety Systems LLC |
|---|---|---|---|---|---|
| 1 | (203.24010017) | 271 | $35.00 | $40.10 | |
| 2 | Box Beam Guide Railing (606.10) | LF | 26,354 | $56.50 | $59.80 |
| 3 | Box Beam End Piece (606.120101) | EACH | 27 | $1,200.00 | $744.50 |
| 4 | Box Beam End Assembly Type III (606.1203) | EACH | 27 | $7,100.00 | $8,885.60 |
| 5 | HPBO (Mod.) Corrugated Beam Guide Railing End Terminal (Energy-Absorbing) (606.27) | EACH | 1 | $4,000.00 | $5,949.20 |
| 6 | (606.59600015) | 3,927 | $1.00 | $15.40 | |
| 7 | Removing and Disposing Cable Guide Railing (606.70) | LF | 26,551 | $6.00 | $1.10 |
| 8 | Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79) | EACH | 64 | $1,100.00 | $228.20 |
| 9 | Transition: HPBO (Mod.) Corrugated Guide Railing to Beam Box Beam Guide Railing (606.8901) | EACH | 1 | $5,000.00 | $7,408.30 |
| 10 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $72,154 | $236,358 |
| 11 | (619.110512) | EACH | 5 | $3,000.00 | $1,900.00 |
| 12 | Clean, Grade and Shape Existing Roadside Section (621.05) | LF | 26,354 | $1.00 | $0.20 |
| 13 | Survey Operations (625.01) | LS | 1 | $5,000.00 | $7,380.70 |
| 14 | Engineer’s Field Office – Type 1 (637.11) | MONTH | 9 | $3,500.00 | $3,535.50 |
| 15 | Office Technology and Supplies (637.34) | DOL | 2,000 | $1.00 | $1.00 |
| 16 | Reference Marker, Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels Relocation (646.24) | EACH | 130 | $1.00 | $6.50 |
| 17 | Steel Post, 2.0 lb/ft (646.32) | EACH | 187 | $50.00 | $45.20 |
| 18 | Field Change Payment (FCP) (697.03) | DOL | 75,000 | $1.00 | $1.00 |
| 19 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 |
| 20 | Fuel Price Adjustment (698.05) | DOL | 500 | $1.00 | $1.00 |
| 21 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 22 | Mobilization (699.040001) | LS | 1 | $85,000 | $93,672 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 26, 2026. Compiled by Mirage Metrics.