NYSDOT contract D265764 bid tabulation
SIGNAL REQUIREMENTS. Let by New York State DOT on May 7, 2026, Columbia, Dutchess, Orange, Putnam,, Region 08. 2 bids received; low bid $1,170,200 by Stilsing Electric Inc.
- Owner
- New York State DOT
- Letting
- 07 MAY 2026
- Pay items
- 70
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Stilsing Electric Inc | $1,170,200 | Low |
| 2 | Power Line Constructors Inc | $1,398,263 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Stilsing Electric Inc | 2. Power Line Constructors Inc |
|---|---|---|---|---|---|
| 1 | (201.07000004) | 5 | $900.00 | $556.00 | |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 7 | $640.00 | $148.00 |
| 3 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 1,025 | $110.00 | $165.00 |
| 4 | (304.11000008) | 5 | $1,215.00 | $302.00 | |
| 5 | Concrete Sidewalks and Driveways (608.0101) | CY | 4 | $2,790.00 | $2,053.00 |
| 6 | (608.01050109) | 1 | $9,300.00 | $16,572 | |
| 7 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $104,000 | $215,432 |
| 8 | Survey Operations (625.01) | LS | 1 | $19,000 | $12,079 |
| 9 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $3,200.00 | $5,998.00 |
| 10 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 26 | $2,700.00 | $2,792.00 |
| 11 | Office Technology and Supplies (637.34) | DOL | 2,000 | $1.00 | $1.00 |
| 12 | Construction Testing supplies – Consumables (637.36) | DOL | 220 | $1.00 | $1.00 |
| 13 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 20 | $175.00 | $118.00 |
| 14 | (662.60000108) | 35,000 | $1.00 | $1.00 | |
| 15 | (680.05010007) | 2 | $31,500 | $32,814 | |
| 16 | (680.05020007) | 1 | $6,100.00 | $5,235.00 | |
| 17 | Pole Excavation and Concrete Foundation (680.5001) | CY | 43 | $2,465.00 | $3,386.00 |
| 18 | Concrete Base for Controller Cabinet (680.5002) | EACH | 2 | $2,800.00 | $3,582.00 |
| 19 | (680.51000010) | 2 | $610.00 | $311.00 | |
| 20 | (680.510501) | EACH | 24 | $2,255.00 | $2,365.00 |
| 21 | (680.51100010) | 4 | $790.00 | $159.00 | |
| 22 | (680.520106) | LF | 450 | $37.75 | $16.89 |
| 23 | (680.520108) | LF | 600 | $57.00 | $38.54 |
| 24 | (680.53010010) | 200 | $7.00 | $7.06 | |
| 25 | Inductance Loop Installation (680.54) | LF | 250 | $21.10 | $22.99 |
| 26 | (680.6808) | EACH | 2 | $2,400.00 | $1,575.00 |
| 27 | (680.681601) | EACH | 14 | $3,200.00 | $2,323.00 |
| 28 | (680.682001) | EACH | 7 | $3,500.00 | $2,573.00 |
| 29 | Dual Span Wire Assembly with Upper Tether Wire (680.7002) | EACH | 1 | $5,300.00 | $5,122.00 |
| 30 | Shielded Lead-in Cable (680.71) | LF | 400 | $3.25 | $2.55 |
| 31 | Inductance Loop Wire (680.72) | LF | 900 | $1.50 | $0.23 |
| 32 | (680.730514) | LF | 1,300 | $5.25 | $3.72 |
| 33 | (680.731014) | LF | 150 | $7.40 | $7.19 |
| 34 | (680.731514) | LF | 180 | $9.50 | $9.77 |
| 35 | (680.78020008) | 1 | $1,700.00 | $938.00 | |
| 36 | (680.78030008) | 4 | $425.00 | $112.00 | |
| 37 | (680.78040008) | 1 | $1,700.00 | $329.00 | |
| 38 | (680.80322008) | 2 | $2,655.00 | $4,335.00 | |
| 39 | (680.80324515) | 2 | $4,300.00 | $2,811.00 | |
| 40 | Solar Power System (680.81) | EACH | 3 | $10,000 | $6,402.00 |
| 41 | Traffic Signal Module - 12-inch, Red Ball, LED (680.810101) | EACH | 12 | $165.00 | $84.70 |
| 42 | Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103) | EACH | 12 | $165.00 | $84.70 |
| 43 | Traffic Signal Module - 12-inch, Yellow Arrow, LED (680.810104) | EACH | 1 | $165.00 | $94.38 |
| 44 | Traffic Signal Module - 12-inch, Green Ball, LED (680.810105) | EACH | 12 | $165.00 | $84.70 |
| 45 | Traffic Signal Module - 12-inch, Green Arrow, LED (680.810106) | EACH | 1 | $165.00 | $94.38 |
| 46 | Traffic Signal Section - Aluminum Type I, 12-inch (680.810107) | EACH | 38 | $210.00 | $398.00 |
| 47 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 3 | $690.00 | $369.00 |
| 48 | Traffic Signal Bracket Assembly - 2 Way (680.8112) | EACH | 2 | $925.00 | $631.00 |
| 49 | Traffic Signal Bracket Assembly - 3 Way (680.8113) | EACH | 2 | $1,355.00 | $789.00 |
| 50 | Pedestrian Signal Section - Aluminum Type I, 12 inch (680.813103) | EACH | 4 | $300.00 | $464.00 |
| 51 | Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105) | EACH | 2 | $290.00 | $174.00 |
| 52 | Pedestrian Signal Bracket Mount Assembly (680.8141) | EACH | 2 | $650.00 | $509.00 |
| 53 | Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001) | EACH | 2 | $290.00 | $174.00 |
| 54 | (680.8151) | EACH | 2 | $1,415.00 | $1,322.00 |
| 55 | (680.8201) | EACH | 1 | $950.00 | $1,340.00 |
| 56 | Flashing Beacon Sign Assembly (680.8220) | EACH | 2 | $4,500.00 | $5,961.00 |
| 57 | Breakaway Transformer Base (680.8223) | EACH | 24 | $1,255.00 | $844.00 |
| 58 | Rectangular Rapid Flashing Beacon (RRFB) (680.8224) | EACH | 20 | $7,900.00 | $11,946 |
| 59 | (680.82250601) | 1 | $970.00 | $451.00 | |
| 60 | (680.90920008) | 8 | $975.00 | $1,840.00 | |
| 61 | (680.94000008) | 7 | $1,450.00 | $2,235.00 | |
| 62 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 7 | $1,100.00 | $187.00 |
| 63 | (680.950206) | LF | 800 | $7.35 | $7.47 |
| 64 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $12.00 | $12.00 |
| 65 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 350 | $10.00 | $12.08 |
| 66 | Field Change Payment (FCP) (697.03) | DOL | 42,000 | $1.00 | $1.00 |
| 67 | Asphalt Price Adjustment (698.04) | DOL | 300 | $1.00 | $1.00 |
| 68 | Fuel Price Adjustment (698.05) | DOL | 200 | $1.00 | $1.00 |
| 69 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 70 | Mobilization (699.040001) | LS | 1 | $43,000 | $45,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of May 7, 2026. Compiled by Mirage Metrics.