Stilsing Electric Inc: NYSDOT bid record

Stilsing Electric Inc submitted 15 bids on New York State DOT contracts in the data, from 03 NOV 2022 to 15 OCT 2026, and was the low bidder on 4 of them (27%). When it was not low, its total sat a median +10% above the low bid.

Owner
New York State DOT
Low bid volume
$4,914,108
Latest bid
15 OCT 2026
Data through
15 OCT 2026
15Bids
4Low bids
27Win rate, percent
+10%Median gap to the low bid when not low, 11 bids

By year

YearBidsLow bidsWin rate
20222150%
20234125%
2024200%
20253133%
20264125%
Stilsing Electric Inc, NYSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
Region 018338%
Region 086117%
Region 09100%
Stilsing Electric Inc, NYSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Field Change Payment (FCP)697.03DOL1515 (100%)$1.00$1.00
Fuel Price Adjustment698.05DOL1515 (100%)$1.00$1.00
Steel/Iron Price Adjustment698.06DOL1515 (100%)$1.00$1.00
Office Technology and Supplies637.34DOL1414 (100%)$1.00$1.00
Asphalt Price Adjustment698.04DOL1111 (100%)$1.00$1.00
Engineer’s Field Office – Type 2637.12MONTH129 (75%)$2,150.00$2,500.00
662.6000010888 (100%)$1.00$1.00
619.111213WEEK76 (86%)$575.00$500.00
680.05010007135 (38%)$25,710$25,000
Conduit Excavation and Backfill including Surface Restoration206.03LF115 (45%)$62.00$55.00
Pole Excavation and Concrete Foundation680.5001CY105 (50%)$1,657.50$2,500.00
680.510501EACH105 (50%)$1,400.00$2,022.00
Stilsing Electric Inc, NYSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Power Line Constructors Inc116 of 11
DLC Electric LLC85 of 8
Binghamton Road Electric LLC62 of 6
Verde Electric Maintenance Corp22 of 2
Hudson Valley Electrical Construction Management. Inc10 of 1
Economy Paving Co Inc11 of 1
E-J Electric Installation Co10 of 1
Stilsing Electric Inc, NYSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
15 OCT 2026D265848Region 08SIGNAL UPGRADES ROUTE 9 TOWN OF FISHKILL2 of 3$620,336+4.0%
01 OCT 2026D265832Region 08SIGNAL OPTIMIZATION3 of 5$1,115,583+15%
16 JUL 2026D265816Region 01TRAFFIC SIGNALS REBUILD SFY 262 of 3$1,319,433+15%
07 MAY 2026D265764Region 08SIGNAL REQUIREMENTS1 of 2$1,170,200Low, 19% under the second
11 SEP 2025D265558Region 08SIGNAL OPTIMIZATION: WIRELESS VEHICLE DETECTION SYSTEM3 of 3$1,084,860+13%
10 JUL 2025D265498Region 01REGION 1 TRAFFIC SIGNAL REQUIREMENTS SFY 251 of 2$1,363,082Low, 27% under the second
20 FEB 2025D265398Region 01TRAFFIC SIGNAL IMPROVEMENTS - Various Locations2 of 3$2,148,838+3.0%
12 SEP 2024D265306Region 08SIGNAL OPTIMIZATION: PUTNAM, ROCKLAND & WESTCHESTER2 of 2$1,118,895+4.0%
09 MAY 2024D265156Region 09SIGNAL REPLACEMENTS - RTE 17C AND 26, BROOME COUNTY4 of 4$2,557,942+9.0%
09 NOV 2023D265108Region 01TRAFFIC SIGNALS REBUILD SFY 20232 of 4$1,542,657+10%
27 JUL 2023D265026Region 08ROUTE 44/55 AT BRUYNSWICK RD (CR-7) INTERSECTION SIGNAL3 of 4$418,429+10%
27 JUL 2023D265053Region 01REGION 1 TRAFFIC SIGNAL REQUIREMENTS SFY 231 of 2$986,859Low, 31% under the second
09 MAR 2023D264977Region 01Navigation Lights Repair and Replacement2 of 2$1,919,542+43%
03 NOV 2022D264900Region 01Glenridge Rd Height Detection Installation Town Glenville1 of 3$1,393,968Low, 8.0% under the second
03 NOV 2022D264908Region 01TRAFFIC SIGNAL REBUILD SFY 212 of 3$2,539,276+13%
Stilsing Electric Inc: latest NYSDOT bids in the data

How this record was read

NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

  • Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy