NYSDOT contract D265498 bid tabulation
REGION 1 TRAFFIC SIGNAL REQUIREMENTS SFY 25. Let by New York State DOT on July 10, 2025, Albany, Essex, Greene, Rensselaer,, Region 01. 2 bids received; low bid $1,363,082 by Stilsing Electric Inc.
- Owner
- New York State DOT
- Letting
- 10 JUL 2025
- Pay items
- 179
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Stilsing Electric Inc | $1,363,082 | Low |
| 2 | DLC Electric LLC | $1,734,827 | +27% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Stilsing Electric Inc | 2. DLC Electric LLC |
|---|---|---|---|---|---|
| 1 | (201.07010004) | 15 | $300.00 | $200.00 | |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 35 | $23.00 | $160.00 |
| 3 | Embankment In Place (203.03) | CY | 15 | $40.00 | $55.00 |
| 4 | Trench and Culvert Excavation (206.0201) | CY | 5 | $40.00 | $120.00 |
| 5 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 2,500 | $48.00 | $55.00 |
| 6 | (206.03120011) | 190 | $77.00 | $45.00 | |
| 7 | Test Pit Excavation (206.05) | EACH | 30 | $425.00 | $630.00 |
| 8 | Mulch – Temporary (209.100101) | SY | 15 | $10.00 | $112.00 |
| 9 | Seed and Mulch – Temporary (209.1003) | SY | 15 | $10.00 | $112.00 |
| 10 | Subbase Course, Type 2 (304.12) | CY | 15 | $35.00 | $234.00 |
| 11 | (404.0982) | TON | 16 | $325.00 | $120.00 |
| 12 | Straight Tack Coat (407.0103) | GAL | 10 | $60.00 | $300.00 |
| 13 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 30 | $150.00 | $213.00 |
| 14 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 2 | $55.00 | $80.00 |
| 15 | Resetting Corrugated Beam Guide Railing (606.51) | LF | 10 | $110.00 | $523.00 |
| 16 | Resetting Box Beam Guide Railing (606.53) | LF | 15 | $135.00 | $541.00 |
| 17 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 1 | $85.00 | $85.00 |
| 18 | Concrete Sidewalks and Driveways (608.0101) | CY | 15 | $850.00 | $1,080.00 |
| 19 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 10 | $640.00 | $952.80 |
| 20 | (608.21000003) | 20 | $750.00 | $924.00 | |
| 21 | (609.0401) | LF | 125 | $30.00 | $84.00 |
| 22 | (609.0801) | LF | 15 | $100.00 | $90.00 |
| 23 | (609.0802) | LF | 15 | $35.00 | $94.50 |
| 24 | Resetting Existing Curb (609.15) | LF | 15 | $60.00 | $78.00 |
| 25 | Topsoil - Lawns (610.1403) | CY | 15 | $75.00 | $290.00 |
| 26 | Turf Establishment - Roadside (610.1601) | SY | 10 | $55.00 | $3.60 |
| 27 | Care of Trees up to 12” Diam. at Breast Height – Pruning (614.0411) | EACH | 1 | $75.00 | $450.00 |
| 28 | Care of Trees Over 12” to 24” Diam. at Breast Height - Pruning (614.0421) | EACH | 1 | $65.00 | $510.00 |
| 29 | (619.01000002) | 5,000 | $1.00 | $1.00 | |
| 30 | (619.02970101) | 45 | $175.00 | $213.00 | |
| 31 | Type III Construction Barricades (619.04) | EACH | 5 | $75.00 | $130.00 |
| 32 | (619.07010001) | 100 | $75.00 | $312.00 | |
| 33 | (619.0901) | LF | 270 | $8.50 | $10.00 |
| 34 | (619.111213) | WEEK | 20 | $650.00 | $900.00 |
| 35 | (619.130201) | EACH | 1 | $2,000.00 | $42,000 |
| 36 | Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611) | MONTH | 5 | $50.00 | $150.00 |
| 37 | Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613) | MONTH | 30 | $50.00 | $150.00 |
| 38 | Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715) | LF | 20 | $33.00 | $260.00 |
| 39 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 20 | $75.00 | $260.00 |
| 40 | Temporary Impact Attenuator - Redirective (Test Level 2) (619.1802) | EACH | 1 | $1,100.00 | $21,600 |
| 41 | Temporary Impact Attenuator - Redirective (Test Level 3) (619.1803) | EACH | 1 | $1,175.00 | $13,200 |
| 42 | (619.24010004) | 1 | $155.00 | $2,000.00 | |
| 43 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 1 | $1,800.00 | $600.00 |
| 44 | (625.21000103) | 1 | $2,000.00 | $2,600.00 | |
| 45 | (627.50140008) | 50 | $7.00 | $7.00 | |
| 46 | Cleaning and Preparation of Pavement Surfaces-Lines (635.0103) | LF | 430 | $7.35 | $10.00 |
| 47 | Cleaning and Preparation of Pavement Surfaces-Letters (635.0203) | EACH | 11 | $79.00 | $103.50 |
| 48 | Cleaning and Preparation of Pavement Surfaces-Symbols (635.0303) | EACH | 4 | $158.00 | $207.00 |
| 49 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $2,500.00 | $720.00 |
| 50 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 12 | $3,500.00 | $5,090.00 |
| 51 | Office Technology and Supplies (637.34) | DOL | 1,000 | $1.00 | $1.00 |
| 52 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 20 | $105.00 | $120.00 |
| 53 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 20 | $126.00 | $140.00 |
| 54 | Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103) | SF | 33 | $95.00 | $140.00 |
| 55 | Type A Sign Posts (645.81) | EACH | 6 | $436.00 | $548.00 |
| 56 | Pole-Mounted Sign Support System (Band Mounting) (645.85) | EACH | 2 | $161.00 | $140.00 |
| 57 | Reference Marker Panel (646.21) | EACH | 2 | $54.00 | $93.00 |
| 58 | Steel Post, 2.0 lb/ft (646.32) | EACH | 5 | $91.00 | $140.00 |
| 59 | Brackets for Barrier and Multidirectional Mounting (646.50) | EACH | 5 | $91.00 | $180.00 |
| 60 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 2 | $213.00 | $150.00 |
| 61 | Relocate Sign Panel, Sign Panel Assembly Size II (30-100 Square Feet) (647.32) | EACH | 1 | $336.00 | $384.00 |
| 62 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 2 | $79.00 | $90.00 |
| 63 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 14 | $115.00 | $140.00 |
| 64 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62) | EACH | 3 | $132.00 | $160.00 |
| 65 | (662.60000108) | 1,000 | $1.00 | $1.00 | |
| 66 | Cast Iron Junction Boxes (670.40) | EACH | 1 | $3,300.00 | $2,800.00 |
| 67 | Ground Wire No. 6 AWG. (670.7501) | LF | 500 | $2.50 | $3.00 |
| 68 | (680.05010007) | 1 | $26,100 | $35,000 | |
| 69 | (680.05020007) | 1 | $4,800.00 | $6,000.00 | |
| 70 | (680.10010001) | 1 | $1,630.00 | $1,974.00 | |
| 71 | (680.10020001) | 1 | $1,955.00 | $2,400.00 | |
| 72 | Pole Excavation and Concrete Foundation (680.5001) | CY | 30 | $3,000.00 | $1,800.00 |
| 73 | Concrete Base for Controller Cabinet (680.5002) | EACH | 2 | $1,795.00 | $1,200.00 |
| 74 | (680.51000105) | 3 | $260.00 | $500.00 | |
| 75 | (680.510501) | EACH | 18 | $1,380.00 | $1,300.00 |
| 76 | (680.51100010) | 5 | $197.00 | $500.00 | |
| 77 | (680.520103) | LF | 150 | $9.00 | $12.00 |
| 78 | (680.520106) | LF | 50 | $11.00 | $75.00 |
| 79 | (680.520108) | LF | 10 | $25.00 | $115.00 |
| 80 | (680.520110) | LF | 10 | $32.00 | $125.00 |
| 81 | (680.520203) | LF | 100 | $10.00 | $35.00 |
| 82 | (680.520206) | LF | 1 | $37.00 | $150.00 |
| 83 | (680.520406) | LF | 1 | $185.00 | $150.00 |
| 84 | (680.520408) | LF | 1 | $245.00 | $175.00 |
| 85 | (680.520504) | LF | 10 | $7.00 | $15.00 |
| 86 | (680.520606) | LF | 1,300 | $17.00 | $18.00 |
| 87 | (680.520608) | LF | 250 | $18.00 | $20.00 |
| 88 | (680.520610) | LF | 40 | $20.00 | $40.00 |
| 89 | (680.53010010) | 200 | $5.00 | $15.00 | |
| 90 | Inductance Loop Installation (680.54) | LF | 200 | $13.00 | $19.00 |
| 91 | (680.58010009) | 1 | $1,200.00 | $1,500.00 | |
| 92 | (680.58801008) | 1 | $2,480.00 | $4,500.00 | |
| 93 | (680.58802008) | 1 | $900.00 | $1,500.00 | |
| 94 | (680.58803008) | 1 | $800.00 | $1,500.00 | |
| 95 | (680.58804008) | 1 | $2,750.00 | $4,500.00 | |
| 96 | (680.58805008) | 1 | $500.00 | $900.00 | |
| 97 | (680.58806008) | 1 | $500.00 | $900.00 | |
| 98 | (680.58807008) | 1 | $1,050.00 | $1,600.00 | |
| 99 | (680.600734) | EACH | 2 | $12,085 | $18,268 |
| 100 | (680.600836) | EACH | 2 | $12,605 | $18,821 |
| 101 | (680.600934) | EACH | 2 | $14,680 | $21,038 |
| 102 | (680.600936) | EACH | 2 | $15,200 | $21,609 |
| 103 | (680.601134) | EACH | 2 | $15,372 | $21,849 |
| 104 | (680.601136) | EACH | 1 | $15,545 | $21,969 |
| 105 | (680.601336) | EACH | 1 | $16,237 | $22,698 |
| 106 | (680.621840) | EACH | 2 | $12,860 | $19,329 |
| 107 | (680.621850) | EACH | 2 | $17,215 | $23,889 |
| 108 | (680.621940) | EACH | 2 | $13,020 | $14,841 |
| 109 | (680.621945) | EACH | 2 | $13,825 | $20,289 |
| 110 | (680.621950) | EACH | 1 | $17,360 | $20,443 |
| 111 | (680.622050) | EACH | 1 | $17,520 | $20,563 |
| 112 | (680.670802) | EACH | 15 | $1,140.00 | $900.00 |
| 113 | (680.680801) | EACH | 4 | $1,195.00 | $900.00 |
| 114 | Dual Span Wire Assembly with Upper Tether Wire (680.7002) | EACH | 4 | $3,500.00 | $1,920.00 |
| 115 | Guy Wire Assembly (680.7005) | EACH | 2 | $450.00 | $360.00 |
| 116 | Riser Assembly, 1-inch Diameter (680.700603) | EACH | 2 | $515.00 | $700.00 |
| 117 | Shielded Lead-in Cable (680.71) | LF | 6,000 | $2.25 | $0.50 |
| 118 | Inductance Loop Wire (680.72) | LF | 1,000 | $0.65 | $1.00 |
| 119 | (680.730310) | LF | 1 | $9.00 | $15.00 |
| 120 | (680.730314) | LF | 720 | $3.00 | $3.00 |
| 121 | (680.730514) | LF | 4,500 | $5.50 | $7.00 |
| 122 | (680.731014) | LF | 3,500 | $6.50 | $7.00 |
| 123 | (680.731514) | LF | 1,500 | $7.50 | $9.00 |
| 124 | (680.77000105) | 1 | $2,900.00 | $3,000.00 | |
| 125 | (680.79000105) | 1 | $3,500.00 | $4,000.00 | |
| 126 | (680.80280001) | 2 | $675.00 | $700.00 | |
| 127 | (680.80324515) | 6 | $2,100.00 | $500.00 | |
| 128 | (680.80370501) | 2 | $14,385 | $21,300 | |
| 129 | (680.80620103) | 2 | $1,200.00 | $1,650.00 | |
| 130 | (680.80620215) | 2 | $1,900.00 | $1,440.00 | |
| 131 | Traffic Signal Section - Aluminum Type I, 12-inch (680.810107) | EACH | 200 | $251.00 | $223.00 |
| 132 | Install Ball/Arrow LED Traffic Signal Module (680.810308) | EACH | 200 | $73.00 | $27.00 |
| 133 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 20 | $650.00 | $440.00 |
| 134 | Traffic Signal Bracket Assembly - 2 Way (680.8112) | EACH | 6 | $952.00 | $742.00 |
| 135 | Pedestrian Signal Section - Aluminum Type I, 12 inch (680.813103) | EACH | 10 | $445.00 | $350.00 |
| 136 | Install Pedestrian Signal Module (680.813104) | EACH | 10 | $100.00 | $73.00 |
| 137 | Pedestrian Signal Bracket Mount Assembly (680.8141) | EACH | 2 | $543.00 | $290.00 |
| 138 | Pedestrian Signal Post Top Mount Assembly (680.8142) | EACH | 8 | $525.00 | $891.00 |
| 139 | (680.8151) | EACH | 5 | $1,450.00 | $840.00 |
| 140 | (680.8152) | EACH | 5 | $2,425.00 | $1,920.00 |
| 141 | (680.81990008) | 20 | $275.00 | $270.00 | |
| 142 | (680.8204) | EACH | 1 | $1,165.00 | $1,000.00 |
| 143 | (680.8207) | EACH | 1 | $700.00 | $1,000.00 |
| 144 | (680.8209) | EACH | 1 | $450.00 | $1,000.00 |
| 145 | (680.8210) | EACH | 1 | $450.00 | $1,000.00 |
| 146 | Flashing Beacon Sign Assembly (680.8220) | EACH | 1 | $4,595.00 | $4,470.00 |
| 147 | (680.82250101) | 9 | $75.00 | $500.00 | |
| 148 | (680.82250201) | 3 | $110.00 | $700.00 | |
| 149 | (680.82250301) | 1 | $600.00 | $3,022.00 | |
| 150 | (680.82250401) | 1 | $875.00 | $19,000 | |
| 151 | (680.82250501) | 2 | $1,250.00 | $2,600.00 | |
| 152 | (680.82250601) | 1 | $500.00 | $482.00 | |
| 153 | (680.82250701) | 1 | $200.00 | $1,170.00 | |
| 154 | (680.82250801) | 5 | $550.00 | $500.00 | |
| 155 | (680.82254310) | 2 | $15,915 | $17,100 | |
| 156 | (680.8451) | EACH | 6 | $538.00 | $700.00 |
| 157 | (680.8452) | EACH | 3 | $1,755.00 | $1,500.00 |
| 158 | (680.90920008) | 5 | $850.00 | $420.00 | |
| 159 | (680.93500101) | 1 | $2,200.00 | $4,000.00 | |
| 160 | (680.93500201) | 1 | $600.00 | $1,220.00 | |
| 161 | (680.93500301) | 20 | $6.00 | $5.00 | |
| 162 | Watertight Disconnect Box (680.9401) | EACH | 1 | $755.00 | $290.00 |
| 163 | Meter Pan (680.9402) | EACH | 1 | $850.00 | $1,183.00 |
| 164 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 5 | $465.00 | $300.00 |
| 165 | (680.950106) | LF | 700 | $5.00 | $7.51 |
| 166 | (680.950206) | LF | 50 | $7.00 | $37.00 |
| 167 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $5.25 | $5.25 |
| 168 | Yellow Epoxy Reflectorized Pavement Stripes - 15 mil (685.0201) | LF | 350 | $5.25 | $7.00 |
| 169 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 150 | $10.50 | $13.00 |
| 170 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 150 | $10.50 | $13.00 |
| 171 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 3,000 | $5.25 | $7.00 |
| 172 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 350 | $5.25 | $7.00 |
| 173 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 10 | $105.00 | $345.00 |
| 174 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 4 | $265.00 | $345.00 |
| 175 | Field Change Payment (FCP) (697.03) | DOL | 100,000 | $1.00 | $1.00 |
| 176 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 |
| 177 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 |
| 178 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 179 | Mobilization (699.040001) | LS | 1 | $30,000 | $66,700 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of July 10, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.