NYSDOT contract D265816 bid tabulation

TRAFFIC SIGNALS REBUILD SFY 26. Let by New York State DOT on July 16, 2026, Greene, Saratoga, Schenectady, Region 01. 3 bids received; low bid $1,145,669 by DLC Electric LLC.

Owner
New York State DOT
Letting
16 JUL 2026
Pay items
87
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1DLC Electric LLC$1,145,669Low
2Stilsing Electric Inc$1,319,433+15%
3Binghamton Road Electric LLC$1,917,119+67%
NYSDOT contract D265816: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. DLC Electric LLC2. Stilsing Electric Inc3. Binghamton Road Electric LLC
1Clearing and Grubbing (201.06)LS1$920.00$1,045.00$8,200.00
2 (201.07010004)1$500.00$1,045.00$4,440.00
3Unclassified Excavation and Disposal (203.02)CY2$132.60$125.00$350.00
4Embankment In Place (203.03)CY2$50.60$300.00$240.00
5Conduit Excavation and Backfill including Surface Restoration (206.03)LF1,631$45.00$42.00$137.00
6Test Pit Excavation (206.05)EACH9$600.00$985.00$2,170.00
7I-Beam Posts for Existing Box Beam Guide Railing (606.4809)EACH27$258.79$189.00$240.00
8Resetting Box Beam Guide Railing (606.53)LF270$116.52$102.00$94.00
9 (608.01060415)145$140.00$95.00$151.00
10 (608.01070415)312$80.00$76.00$176.00
11 (608.21000003)6.70$759.00$675.00$470.00
12Basic Work Zone Traffic Control (619.01)LS1$65,130$102,000$215,000
13Type III Construction Barricades (619.04)EACH20$1.00$82.00$197.00
14 (619.111213)WEEK48$1.00$575.00$1,117.00
15Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613)MONTH12$125.00$135.00$670.00
16Nighttime Operations (Entire Project) (619.24)LS1$10,800$26,200$107,700
17Survey Operations (625.01)LS1$6,900.00$12,000$40,450
18Cleaning and Preparation of Pavement Surfaces-Lines (635.0103)LF130$7.00$8.00$13.00
19Concrete Cylinder Curing Equipment (637.04)EACH1$690.00$2,500.00$13,700
20Engineer’s Field Office – Type 2 (637.12)MONTH16$2,242.50$2,000.00$2,475.00
21Office Technology and Supplies (637.34)DOL1,000$1.00$1.00$1.00
22 (662.60000108)1,000$1.00$1.00$1.00
23 (662.60000208)1,000$1.00$1.00$1.00
24 (662.60000308)1,000$1.00$1.00$1.00
25 (662.60000408)1,000$1.00$1.00$1.00
26Ground Wire No. 6 AWG. (670.7501)LF1,954$2.14$2.60$4.00
27 (680.05010007)5$24,277$27,890$31,617
28 (680.05020007)2$5,486.45$3,600.00$4,570.00
29 (680.05080014)3$920.00$965.00$1,140.00
30Pole Excavation and Concrete Foundation (680.5001)CY44.50$1,280.00$1,935.00$3,310.00
31Concrete Base for Controller Cabinet (680.5002)EACH1$1,036.00$1,775.00$3,590.00
32 (680.510501)EACH21$1,200.00$1,215.00$2,020.00
33 (680.520103)LF60$7.34$15.85$17.00
34 (680.520106)LF20$29.20$32.55$26.50
35 (680.520606)LF1,656$11.25$12.15$11.75
36 (680.520608)LF1,440$15.36$13.25$15.05
37 (680.520610)LF213$20.00$32.20$22.00
38 (680.53010010)63$13.00$8.66$20.00
39 (680.61023409)1$24,346$38,200$28,144
40 (680.621955)EACH1$23,971$26,200$21,840
41 (680.622030)EACH2$23,027$34,200$15,427
42 (680.622065)EACH1$30,272$41,300$28,370
43 (680.632043)EACH1$30,400$28,300$24,140
44 (680.632160)EACH1$33,000$46,000$32,070
45 (680.632262)EACH1$32,700$46,150$32,270
46 (680.632365)EACH1$35,110$47,550$33,070
47 (680.670801)EACH3$1,885.00$1,610.00$2,370.00
48 (680.670802)EACH3$1,767.00$1,610.00$1,885.00
49 (680.730314)LF50$2.69$3.85$3.00
50 (680.730514)LF8,686$5.75$3.55$3.75
51 (680.731014)LF1,657$8.25$6.15$6.50
52 (680.77000305)1$1,263.00$2,265.00$3,110.00
53 (680.79000105)1$3,376.00$6,040.00$9,700.00
54 (680.79000205)1$5,065.00$6,040.00$9,700.00
55 (680.79000305)1$5,065.00$11,285$9,700.00
56 (680.79000405)1$5,065.00$5,495.00$6,545.00
57 (680.80320014)2$3,100.00$2,965.00$3,700.00
58 (680.80324515)5$434.00$1,940.00$3,957.00
59 (680.80324708)1$909.00$1,205.00$1,580.00
60Traffic Signal Section - Optically Programmed - 12-inch (680.8102)EACH6$2,035.00$1,770.00$2,250.00
61Install Ball/Arrow LED Traffic Signal Module (680.810308)EACH129$39.04$46.00$45.00
62Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601)EACH123$128.85$136.00$207.00
63Traffic Signal Bracket Assembly - 1 Way (680.8111)EACH39$464.16$455.00$702.00
64Traffic Signal Bracket Assembly - 2 Way (680.8112)EACH1$730.00$585.00$849.00
65Pedestrian Signal Section - Aluminum Type I, 12 inch (680.813103)EACH18$271.00$190.00$277.00
66Install Pedestrian Signal Module (680.813104)EACH22$70.00$50.00$50.00
67Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106)EACH4$243.00$195.00$275.00
68Pedestrian Signal Bracket Mount Assembly (680.8141)EACH2$318.00$445.00$669.00
69Pedestrian Signal Post Top Mount Assembly (680.8142)EACH9$412.00$325.00$490.00
70 (680.8151)EACH10$974.00$1,215.00$1,307.00
71 (680.8152)EACH1$2,015.00$2,285.00$4,290.00
72Backplates for Traffic Signal Heads (680.8199)EACH41$310.00$185.00$270.00
73 (680.8207)EACH13$481.00$680.00$1,017.00
74Breakaway Transformer Base (680.8223)EACH3$812.00$785.00$957.00
75Watertight Disconnect Box (680.9401)EACH4$255.00$565.00$774.00
76Meter Pan (680.9402)EACH4$406.00$635.00$1,700.00
77Install Electrical Disconnect/Generator Transfer Switch (680.9499)EACH4$287.00$300.00$458.00
78 (680.950102)LF200$2.43$5.05$8.10
79 (680.950106)LF1,508$6.62$2.60$4.50
80Performance Concrete Quality Adjustment (680.99)QUALITY UNIT1$13.00$13.00$13.00
81 (683.84600108)70$11.00$3.50$4.80
82White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104)LF65$136.00$75.00$74.00
83Field Change Payment (FCP) (697.03)DOL55,400$1.00$1.00$1.00
84Asphalt Price Adjustment (698.04)DOL100$1.00$1.00$1.00
85Fuel Price Adjustment (698.05)DOL100$1.00$1.00$1.00
86Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00
87Mobilization (699.040001)LS1$44,000$30,000$73,400
NYSDOT contract D265816: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of July 16, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy