NYSDOT contract D265398 bid tabulation
TRAFFIC SIGNAL IMPROVEMENTS - Various Locations. Let by New York State DOT on February 20, 2025, Albany, Greene, Saratoga, Schenectady,, Region 01. 3 bids received; low bid $2,081,471 by DLC Electric LLC.
- Owner
- New York State DOT
- Letting
- 20 FEB 2025
- Pay items
- 117
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | DLC Electric LLC | $2,081,471 | Low |
| 2 | Stilsing Electric Inc | $2,148,838 | +3.0% |
| 3 | Power Line Constructors Inc | $2,828,050 | +36% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. DLC Electric LLC | 2. Stilsing Electric Inc | 3. Power Line Constructors Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $920.00 | $3,600.00 | $22,593 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 2 | $132.60 | $125.00 | $1,252.00 |
| 3 | Embankment In Place (203.03) | CY | 2 | $50.60 | $300.00 | $1,267.00 |
| 4 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 3,225 | $46.17 | $55.00 | $83.08 |
| 5 | (206.03120010) | 145 | $104.57 | $125.00 | $36.30 | |
| 6 | Test Pit Excavation (206.05) | EACH | 23 | $593.36 | $1,305.00 | $2,659.00 |
| 7 | (608.01060415) | 153 | $140.00 | $102.00 | $68.96 | |
| 8 | (608.01070415) | 843 | $82.00 | $77.00 | $68.97 | |
| 9 | (608.21000003) | 14.70 | $759.00 | $662.00 | $495.00 | |
| 10 | Topsoil - Roadside (610.1402) | CY | 0.50 | $256.71 | $300.00 | $775.00 |
| 11 | Turf Establishment - Roadside (610.1601) | SY | 3 | $3.45 | $200.00 | $190.00 |
| 12 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $88,259 | $77,000 | $239,648 |
| 13 | Type III Construction Barricades (619.04) | EACH | 24 | $91.42 | $103.00 | $642.00 |
| 14 | (619.111213) | WEEK | 16 | $811.31 | $775.00 | $1,642.00 |
| 15 | Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611) | MONTH | 3 | $350.00 | $50.00 | $200.00 |
| 16 | Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613) | MONTH | 9 | $796.95 | $100.00 | $200.00 |
| 17 | Interim Tubular Markers (619.20) | EACH | 40 | $51.91 | $205.00 | $571.00 |
| 18 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $16,330 | $4,500.00 | $34,120 |
| 19 | Survey Operations (625.01) | LS | 1 | $6,900.00 | $13,450 | $36,300 |
| 20 | (625.09010015) | LS | 1 | $2,300.00 | $9,000.00 | $13,946 |
| 21 | Cleaning and Preparation of Pavement Surfaces-Lines (635.0103) | LF | 3,235 | $2.63 | $2.20 | $4.95 |
| 22 | Cleaning and Preparation of Pavement Surfaces-Letters (635.0203) | EACH | 4 | $132.25 | $107.00 | $2,750.00 |
| 23 | Cleaning and Preparation of Pavement Surfaces-Symbols (635.0303) | EACH | 2 | $264.50 | $214.00 | $388.00 |
| 24 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $690.00 | $2,500.00 | $1,000.00 |
| 25 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 12 | $2,242.50 | $2,000.00 | $2,203.00 |
| 26 | Office Technology and Supplies (637.34) | DOL | 1,400 | $1.00 | $1.00 | $1.00 |
| 27 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 831 | $53.13 | $44.95 | $46.20 |
| 28 | Overhead Sign Panels (645.61) | SF | 36 | $96.60 | $75.00 | $204.00 |
| 29 | Type A Sign Posts (645.81) | EACH | 118 | $271.98 | $230.00 | $236.00 |
| 30 | (645.81090003) | 51 | $88.55 | $75.00 | $77.00 | |
| 31 | (645.830502) | EACH | 2 | $8,444.35 | $5,010.00 | $5,142.00 |
| 32 | Pole-Mounted Sign Support System (Band Mounting) (645.85) | EACH | 4 | $82.22 | $70.00 | $71.50 |
| 33 | Reference Marker Panel (646.21) | EACH | 5 | $56.92 | $49.00 | $49.50 |
| 34 | Steel Post, 2.0 lb/ft (646.32) | EACH | 2 | $107.52 | $91.00 | $93.50 |
| 35 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 83 | $61.35 | $52.00 | $53.35 |
| 36 | (662.18200108) | LS | 1 | $35,000 | $100.00 | $5,263.00 |
| 37 | (662.60000108) | 1,000 | $1.00 | $1.00 | $1.00 | |
| 38 | (662.60000208) | 1,000 | $1.00 | $1.00 | $1.00 | |
| 39 | (662.60000308) | 1,000 | $1.00 | $1.00 | $1.00 | |
| 40 | (662.60000408) | 1,000 | $1.00 | $1.00 | $1.00 | |
| 41 | (662.60000508) | 1,000 | $1.00 | $1.00 | $1.00 | |
| 42 | (662.60000708) | 1,000 | $1.00 | $1.00 | $1.00 | |
| 43 | (662.60000808) | 1,000 | $1.00 | $1.00 | $1.00 | |
| 44 | (670.2602) | LF | 230 | $8.65 | $12.00 | $8.06 |
| 45 | (670.7004) | LF | 2,905 | $1.87 | $2.00 | $2.24 |
| 46 | Ground Wire No. 6 AWG. (670.7501) | LF | 5,847 | $2.14 | $3.05 | $2.20 |
| 47 | (680.05010007) | 4 | $19,306 | $21,600 | $25,199 | |
| 48 | (680.05020007) | 3 | $3,245.24 | $4,500.00 | $3,995.00 | |
| 49 | Pole Excavation and Concrete Foundation (680.5001) | CY | 125 | $1,280.53 | $1,605.00 | $2,377.00 |
| 50 | Concrete Base for Controller Cabinet (680.5002) | EACH | 2 | $1,036.40 | $2,100.00 | $3,747.00 |
| 51 | (680.510501) | EACH | 36 | $805.73 | $1,330.00 | $2,039.00 |
| 52 | (680.51300008) | 3 | $1,097.23 | $9,000.00 | $2,184.00 | |
| 53 | (680.520103) | LF | 100 | $7.34 | $19.40 | $9.72 |
| 54 | (680.520106) | LF | 145 | $29.20 | $19.00 | $15.42 |
| 55 | (680.520606) | LF | 1,989 | $10.05 | $12.00 | $8.06 |
| 56 | (680.520608) | LF | 2,212 | $15.36 | $15.45 | $11.17 |
| 57 | (680.520610) | LF | 2,080 | $20.00 | $19.00 | $13.39 |
| 58 | (680.53010010) | 65 | $12.52 | $11.00 | $6.89 | |
| 59 | (680.61023409) | 1 | $14,049 | $34,700 | $34,740 | |
| 60 | (680.621935) | EACH | 1 | $14,049 | $12,500 | $11,538 |
| 61 | (680.621940) | EACH | 2 | $7,798.31 | $13,300 | $12,748 |
| 62 | (680.621945) | EACH | 1 | $51,302 | $16,200 | $15,598 |
| 63 | (680.621950) | EACH | 1 | $22,099 | $15,700 | $15,542 |
| 64 | (680.621955) | EACH | 1 | $43,754 | $18,100 | $17,867 |
| 65 | (680.621960) | EACH | 2 | $12,067 | $19,000 | $19,277 |
| 66 | (680.622055) | EACH | 1 | $22,099 | $18,100 | $17,867 |
| 67 | (680.622150) | EACH | 2 | $22,099 | $16,800 | $16,680 |
| 68 | (680.631948) | EACH | 1 | $31,299 | $22,800 | $23,301 |
| 69 | (680.631950) | EACH | 2 | $31,299 | $26,100 | $27,301 |
| 70 | (680.631955) | EACH | 1 | $31,652 | $24,300 | $25,551 |
| 71 | (680.631962) | EACH | 1 | $43,346 | $31,300 | $32,488 |
| 72 | (680.670802) | EACH | 13 | $837.32 | $1,455.00 | $1,441.00 |
| 73 | (680.730314) | LF | 108 | $2.38 | $2.75 | $2.75 |
| 74 | (680.730514) | LF | 21,596 | $3.75 | $3.48 | $3.68 |
| 75 | (680.731014) | LF | 4,001 | $4.68 | $6.00 | $7.09 |
| 76 | (680.77000105) | 1 | $1,341.99 | $3,600.00 | $1,406.00 | |
| 77 | (680.77000605) | 1 | $1.00 | $1,400.00 | $5,248.00 | |
| 78 | (680.77000805) | 1 | $3,636.11 | $1,400.00 | $5,248.00 | |
| 79 | (680.79000105) | 1 | $2,943.87 | $8,400.00 | $6,955.00 | |
| 80 | (680.79000205) | 1 | $4,415.81 | $9,000.00 | $13,455 | |
| 81 | (680.79000305) | 1 | $25,704 | $11,000 | $12,799 | |
| 82 | (680.79000405) | 1 | $1.00 | $5,700.00 | $4,286.00 | |
| 83 | (680.80320014) | 1 | $2,734.40 | $4,560.00 | $4,845.00 | |
| 84 | (680.80324515) | 4 | $368.69 | $4,300.00 | $2,496.00 | |
| 85 | (680.80324708) | 2 | $909.64 | $1,350.00 | $1,211.00 | |
| 86 | (680.80620215) | 1 | $936.66 | $2,400.00 | $2,764.00 | |
| 87 | Install Ball/Arrow LED Traffic Signal Module (680.810308) | EACH | 132 | $22.49 | $29.00 | $5.70 |
| 88 | Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601) | EACH | 132 | $128.85 | $140.00 | $302.00 |
| 89 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 55 | $464.16 | $485.00 | $402.00 |
| 90 | Pedestrian Signal Section - Aluminum Type I, 12 inch (680.813103) | EACH | 44 | $271.00 | $270.00 | $423.00 |
| 91 | Install Pedestrian Signal Module (680.813104) | EACH | 48 | $59.08 | $75.00 | $5.70 |
| 92 | Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106) | EACH | 4 | $242.98 | $235.00 | $423.00 |
| 93 | Pedestrian Signal Bracket Mount Assembly (680.8141) | EACH | 2 | $214.41 | $260.00 | $398.00 |
| 94 | Pedestrian Signal Post Top Mount Assembly (680.8142) | EACH | 14 | $411.35 | $325.00 | $499.00 |
| 95 | (680.8151) | EACH | 14 | $807.46 | $1,310.00 | $1,030.00 |
| 96 | (680.8152) | EACH | 23 | $1,651.56 | $2,290.00 | $4,872.00 |
| 97 | Backplates for Traffic Signal Heads (680.8199) | EACH | 51 | $217.54 | $335.00 | $211.00 |
| 98 | (680.8207) | EACH | 39 | $433.23 | $850.00 | $1,115.00 |
| 99 | Breakaway Transformer Base (680.8223) | EACH | 3 | $811.70 | $870.00 | $767.00 |
| 100 | (680.84100110) | 4 | $4,591.26 | $5,010.00 | $5,138.00 | |
| 101 | Watertight Disconnect Box (680.9401) | EACH | 6 | $255.00 | $755.00 | $1,579.00 |
| 102 | Meter Pan (680.9402) | EACH | 5 | $405.65 | $820.00 | $375.00 |
| 103 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 5 | $236.31 | $470.00 | $1,195.00 |
| 104 | (680.950106) | LF | 1,585 | $6.62 | $3.15 | $2.71 |
| 105 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 7 | $2.00 | $2.00 | $2.00 |
| 106 | (683.10120008) | 1 | $7,110.39 | $6,600.00 | $8,331.00 | |
| 107 | (683.84600108) | 60 | $5.74 | $8.00 | $3.90 | |
| 108 | (683.93103104) | 2 | $51,934 | $62,400 | $69,241 | |
| 109 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 2,885 | $5.01 | $4.10 | $4.35 |
| 110 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 400 | $5.01 | $4.10 | $4.35 |
| 111 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 150 | $5.01 | $4.10 | $4.35 |
| 112 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 2 | $330.62 | $268.00 | $388.00 |
| 113 | Field Change Payment (FCP) (697.03) | DOL | 114,800 | $1.00 | $1.00 | $1.00 |
| 114 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 115 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 116 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 117 | Mobilization (699.040001) | LS | 1 | $70,000 | $40,000 | $108,600 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of February 20, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.