E-J Electric Installation Co: NYSDOT bid record
E-J Electric Installation Co submitted 10 bids on New York State DOT contracts in the data, from 05 MAY 2022 to 01 OCT 2026, and was the low bidder on 5 of them (50%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $48,251,749
- Latest bid
- 01 OCT 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 2 | 2 | 100% |
| 2023 | 3 | 1 | 33% |
| 2024 | 4 | 2 | 50% |
| 2026 | 1 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 08 | 4 | 1 | 25% |
| Region 10 | 3 | 2 | 67% |
| Region 11 | 3 | 2 | 67% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Office Technology and Supplies | 637.34 | DOL | 10 | 10 (100%) | $1.00 | $1.00 |
| Field Change Payment (FCP) | 697.03 | DOL | 9 | 9 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 9 | 9 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 9 | 9 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 7 | 7 (100%) | $1.00 | $1.00 |
| 680.53010010 | 8 | 6 (75%) | $4.75 | $7.49 | ||
| Watering Vegetation | 610.19 | 1,000 GALLONS | 6 | 5 (83%) | $89.90 | $80.00 |
| Pole Excavation and Concrete Foundation | 680.5001 | CY | 6 | 5 (83%) | $1,925.00 | $2,500.00 |
| Care of Trees Over 12” to 24” Diam. at Breast Height - Pruning | 614.0421 | EACH | 5 | 5 (100%) | $352.00 | $600.00 |
| 680.520106 | LF | 6 | 4 (67%) | $35.55 | $28.00 | |
| 680.520108 | LF | 6 | 4 (67%) | $58.17 | $46.00 | |
| Traffic Signal Bracket Assembly - 1 Way | 680.8111 | EACH | 5 | 4 (80%) | $396.00 | $460.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Verde Electric Maintenance Corp | 4 | 3 of 4 |
| Welsbach Electric Corp of L I | 3 | 0 of 3 |
| Hinck Electrical Contractor Inc | 3 | 1 of 3 |
| Commander Electric Inc | 3 | 1 of 3 |
| Triumph Construction Corp | 2 | 0 of 2 |
| Es II Enterprises LLC | 1 | 1 of 1 |
| Paul J Scariano Inc | 1 | 0 of 1 |
| Gateway Industries Inc | 1 | 0 of 1 |
| Hellman Electric LLC | 1 | 0 of 1 |
| Bove Industries Inc | 1 | 0 of 1 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 OCT 2026 | D265832 | Region 08 | SIGNAL OPTIMIZATION | 5 of 5 | $1,399,990 | +44% |
| 10 OCT 2024 | D265329 | Region 08 | SIGNAL UPGRADES: ROUTES 59 & 304, CLARKSTOWN | 2 of 2 | $1,165,000 | +34% |
| 22 AUG 2024 | D265251 | Region 11 | Active Traffic Management system on the CBE. | 1 of 6 | $25,410,000 | Low, 18% under the second |
| 06 JUN 2024 | D265255 | Region 10 | HIGHWAY - TRAFFIC SIGNAL AND LIGHTING - Various Locations | 3 of 4 | $6,180,230 | +9.0% |
| 08 FEB 2024 | D265164 | Region 11 | Region-11 ITS Field Network System Maintenance and Support. | 1 of 2 | $9,899,357 | Low, 14% under the second |
| 15 JUN 2023 | D264995 | Region 10 | TRAFFIC SIGNAL REQUIREMENTS CONTRACT | 1 of 4 | $4,821,392 | Low, 10% under the second |
| 20 APR 2023 | D264942 | Region 08 | LHTL Traffic Signals, Cameras, VMS | 2 of 2 | $28,270,000 | +11% |
| 16 FEB 2023 | D264918 | Region 11 | Long Island Expressway Active Traffic and Demand Management | 2 of 5 | $25,700,000 | +6.0% |
| 16 JUN 2022 | D264763 | Region 10 | TRAFFIC SIGNAL REQUIREMENTS CONTRACT 40 NYSDOT Region-10 | 1 of 4 | $4,999,000 | Low, 14% under the second |
| 05 MAY 2022 | D264759 | Region 08 | Westchester, OVER HEIGHT VEHICLE DETECTION SYSTEMS | 1 of 2 | $3,122,000 | Low, 0.0% under the second |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.