Paul J Scariano Inc: NYSDOT bid record

Paul J Scariano Inc submitted 16 bids on New York State DOT contracts in the data, from 21 JUL 2022 to 01 OCT 2026, and was the low bidder on 1 of them (6%). When it was not low, its total sat a median +25% above the low bid.

Owner
New York State DOT
Low bid volume
$14,885,000
Latest bid
01 OCT 2026
Data through
15 OCT 2026
16Bids
1Low bids
6Win rate, percent
+25%Median gap to the low bid when not low, 15 bids

By year

YearBidsLow bidsWin rate
2022300%
2023400%
202411100%
2025500%
2026300%
Paul J Scariano Inc, NYSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
Region 111218%
Region 08400%
Paul J Scariano Inc, NYSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Office Technology and Supplies637.34DOL1616 (100%)$1.00$1.00
Field Change Payment (FCP)697.03DOL1313 (100%)$1.00$1.00
Fuel Price Adjustment698.05DOL1313 (100%)$1.00$1.00
Steel/Iron Price Adjustment698.06DOL1313 (100%)$1.00$1.00
Asphalt Price Adjustment698.04DOL1313 (100%)$1.00$1.00
691.040000201111 (100%)$1.00$1.00
Partnering Workshop637.35DOL1010 (100%)$1.00$1.00
Construction Testing supplies – Consumables637.36DOL88 (100%)$1.00$1.00
Medical Testing570.02DOL66 (100%)$1.00$1.00
Personal-Exposure-Monitoring Sample Analysis570.03DOL55 (100%)$1.00$1.00
675.9900002355 (100%)$1.00$1.00
Epoxy-Coated Bar Reinforcement for Structures556.0202LB114 (36%)$4.00$3.25
Paul J Scariano Inc, NYSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Triumph Construction Corp84 of 8
Jrcruz Corp74 of 7
Defoe Corporation64 of 6
Oliveira Contracting Inc53 of 5
Bove Industries Inc54 of 5
Westmoreland Construction Inc55 of 5
Constar Inc55 of 5
John Civetta & Sons Inc42 of 4
Tully Construction Company Inc42 of 4
Restani Construction Corp31 of 3
Paul J Scariano Inc, NYSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
01 OCT 2026D265800Region 11Sign Structures Replacement3 of 5$26,750,000+25%
12 MAR 2026D265680Region 11CONCRETE PAVEMENT PRESERVATION ON CBE & BQE IN NYC9 of 9$32,302,916+81%
26 FEB 2026D265647Region 08Wall Repair, Drainage and Pavement Improvements.2 of 3$4,875,000+15%
18 DEC 2025D265605Region 11BRIDGE MAINTENANCE - Expansion Joint Repairs and Replacement6 of 6$21,327,000+131%
23 OCT 2025D265495Region 11BRIDGE MAINTENANCE & REHAB - Rts I-87, 907C, 907M & 909C6 of 8$35,321,000+33%
24 JUL 2025D265488Region 11Standby Where & When General Repairs on Highways and Bridges7 of 7$29,698,913+60%
27 MAR 2025D265445Region 08BRIDGE REHABILITATION VARIOUS LOCATIONS2 of 3$16,380,8000.0%
23 JAN 2025D265357Region 11RETAINING WALLS REHAB & CORRECTIVE MAINTENANCE IN NYC3 of 3$56,073,500+53%
20 JUN 2024D265247Region 11GCP Safety and Mobility Improvements 907M1 of 8$14,885,000Low, 7.0% under the second
13 JUL 2023D265046Region 11MAINTENANCE REPAIRS FOR VARIOUS BRIDGES NYC - ALL COUNTIES6 of 8$19,591,072+8.0%
06 APR 2023D264965Region 11Where and When General Repairs, All Counties in NYC5 of 7$19,898,800+5.0%
23 MAR 2023D264998Region 11RETAINING WALL REHABILITATION AND CORRECTIVE MAINTENANCE5 of 7$39,764,321+87%
16 FEB 2023D264918Region 11Long Island Expressway Active Traffic and Demand Management3 of 5$29,743,000+23%
15 DEC 2022D264916Region 11Reconstruction of two SB Henry Hudson Parkway Retaining wall7 of 11$9,432,100+39%
01 SEP 2022D264810Region 08I287 over Metro North I287 over Midland Avenue7 of 9$30,737,000+12%
21 JUL 2022D264816Region 08Hutchinson River Parkway Service Station, NYSDOT R-82 of 5$4,838,530+10%
Paul J Scariano Inc: latest NYSDOT bids in the data

How this record was read

NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

  • Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy