NYSDOT contract D265357 bid tabulation
RETAINING WALLS REHAB & CORRECTIVE MAINTENANCE IN NYC. Let by New York State DOT on January 23, 2025, Kings, New York, Queens, Richmond, Region 11. 3 bids received; low bid $36,722,448 by Zaman Construction Corp.
- Owner
- New York State DOT
- Letting
- 23 JAN 2025
- Pay items
- 75
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Zaman Construction Corp | $36,722,448 | Low |
| 2 | Westmoreland Construction Inc | $37,692,666 | +3.0% |
| 3 | Paul J Scariano Inc | $56,073,500 | +53% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Zaman Construction Corp | 2. Westmoreland Construction Inc | 3. Paul J Scariano Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $100,000 | $250,000 | $150,000 |
| 2 | (201.07000004) | 6,101 | $10.00 | $25.00 | $100.00 | |
| 3 | (201.07010004) | 33 | $2,000.00 | $400.00 | $1,500.00 | |
| 4 | Unclassified Excavation and Disposal (203.02) | CY | 23 | $280.00 | $200.00 | $1,000.00 |
| 5 | Removal and Disposal of Bond Breaker/Filler ACM (BV14) (210.3312) | SF | 9,318 | $85.00 | $115.00 | $125.00 |
| 6 | Removal and Disposal of Caulking ACM (BV14) (210.3411) | LF | 18,825 | $55.00 | $80.00 | $85.00 |
| 7 | (210.481201) | SF | 18,919 | $60.00 | $120.00 | $150.00 |
| 8 | Sealing Longitudinal Joints-Highway Joint Sealant (502.9310) | LF | 33 | $100.00 | $10.00 | $500.00 |
| 9 | Concrete for Structures, Performance (555.0021) | CY | 54 | $288.00 | $10,000 | $6,500.00 |
| 10 | (555.20010011) | 86 | $1,500.00 | $130.00 | $1,000.00 | |
| 11 | (555.81000018) | 3,843 | $115.00 | $45.00 | $15.00 | |
| 12 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $20.00 | $20.00 | $20.00 |
| 13 | Epoxy-Coated Steel Fabric Reinforcement (556.0102) | SY | 7,578 | $150.00 | $10.00 | $25.00 |
| 14 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 19,511 | $6.00 | $8.00 | $10.00 |
| 15 | Protective Sealing of Concrete with Coating Type Protective Sealer (559.04) | SQUAREFOOT | 487,243 | $6.00 | $6.50 | $9.00 |
| 16 | Tuck Pointing (560.08) | LF | 35,950 | $15.00 | $40.00 | $35.00 |
| 17 | (560.10030011) | 12,398 | $85.00 | $43.00 | $35.00 | |
| 18 | (560.10040010) | 805 | $25.00 | $150.00 | $500.00 | |
| 19 | (560.10070008) | 48,724 | $27.00 | $2.50 | $6.00 | |
| 20 | (560.16010008) | 2,673 | $180.00 | $150.00 | $600.00 | |
| 21 | (560.18000008) | 11,993 | $23.00 | $40.00 | $25.00 | |
| 22 | (560.18100011) | 282 | $175.00 | $250.00 | $500.00 | |
| 23 | (560.32010011) | 437 | $500.00 | $175.00 | $200.00 | |
| 24 | (560.50010111) | 8,753 | $100.00 | $175.00 | $200.00 | |
| 25 | (560.80040011) | 88,644 | $55.00 | $15.00 | $25.00 | |
| 26 | (560.80800011) | 506 | $250.00 | $130.00 | $300.00 | |
| 27 | (568.33460009) | 35 | $1,000.00 | $500.00 | $2,000.00 | |
| 28 | Lead-Exposure Control Plan (570.01) | LS | 1 | $20,000 | $10,000 | $25,000 |
| 29 | Medical Testing (570.02) | DOL | 12,500 | $1.00 | $1.00 | $1.00 |
| 30 | Personal-Exposure-Monitoring Sample Analysis (570.03) | DOL | 12,500 | $1.00 | $1.00 | $1.00 |
| 31 | Decontamination Facilities (570.04) | CALENDAR WEEK | 1 | $10,000 | $1,000.00 | $50,000 |
| 32 | (570.09) | LS | 1 | $25,000 | $250,000 | $150,000 |
| 33 | (570.150001) | LS | 1 | $75,000 | $50,000 | $150,000 |
| 34 | (570.160001) | LS | 1 | $50,000 | $250,000 | $75,000 |
| 35 | Disposal of Hazardous Paint Removal Waste Containing Lead (571.03) | LB | 15,174 | $5.00 | $3.00 | $2.00 |
| 36 | Disposal of Non-Hazardous Industrial Solid Paint Removal Waste (571.04) | LB | 13,794 | $4.00 | $2.30 | $2.00 |
| 37 | (573.15000011) | 102,184 | $25.00 | $20.00 | $40.00 | |
| 38 | (574.020001) | SF | 42,281 | $40.00 | $55.00 | $50.00 |
| 39 | Removal and Replacement of Structural Concrete (582.0051) | CY | 38 | $3,000.00 | $8,000.00 | $5,500.00 |
| 40 | Removal of Structural Concrete- Replacement with Vertical and Overhead Patching Material (582.0061) | SF | 72,222 | $40.00 | $110.00 | $80.00 |
| 41 | (582.99) | 1 | $40.00 | $40.00 | $40.00 | |
| 42 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 2,209 | $87.00 | $20.00 | $100.00 |
| 43 | Bridge Railing Removal and Storage (587.02) | LF | 2,372 | $18.00 | $65.00 | $100.00 |
| 44 | Installation of Stored Bridge Railing (587.03) | LF | 2,372 | $115.00 | $75.00 | $200.00 |
| 45 | (607.36000011) | 1,230 | $50.00 | $125.00 | $200.00 | |
| 46 | (607.36100011) | 27 | $58.00 | $350.00 | $500.00 | |
| 47 | (607.97000008) | 5,653 | $92.00 | $125.00 | $250.00 | |
| 48 | Grouted Stone Block Paved Sidewalks and Driveways (Sand Setting Bed) (608.08) | SY | 2 | $1,000.00 | $1,000.00 | $2,500.00 |
| 49 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $1,150,000 | $2,290,000 | $9,250,000 |
| 50 | (619.10050020) | 5,400 | $420.00 | $5.00 | $50.00 | |
| 51 | (619.110511) | EACH | 6 | $15,000 | $10,000 | $25,000 |
| 52 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 3,120 | $250.00 | $90.00 | $125.00 |
| 53 | Temporary Sand Barrel Module (619.21) | EACH | 30 | $230.00 | $750.00 | $1,000.00 |
| 54 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $600,000 | $350,000 | $4,500,000 |
| 55 | Survey Operations (625.01) | LS | 1 | $400,000 | $200,000 | $505,692 |
| 56 | Removal and Repair of Deteriorated Asphalt Pavement - Less than or equal to 4 Square Yards (633.1401) | SY | 4 | $1,000.00 | $500.00 | $2,500.00 |
| 57 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $1,380.00 | $1,950.00 | $5,000.00 |
| 58 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 27 | $10,500 | $8,000.00 | $15,000 |
| 59 | (637.31020020) | 27 | $1,000.00 | $1,000.00 | $1,000.00 | |
| 60 | Office Technology and Supplies (637.34) | DOL | 1,000 | $1.00 | $1.00 | $1.00 |
| 61 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 | $1.00 |
| 62 | Construction Testing supplies – Consumables (637.36) | DOL | 1,000 | $1.00 | $1.00 | $1.00 |
| 63 | (639.10210011) | LS | 1 | $100,000 | $50,000 | $100,000 |
| 64 | (645.13000011) | 44 | $500.00 | $500.00 | $500.00 | |
| 65 | (646.06260025) | 5 | $1,000.00 | $500.00 | $500.00 | |
| 66 | Miscellaneous Metals (656.01) | LB | 788 | $6.00 | $80.00 | $100.00 |
| 67 | (670.19010008) | 2 | $5,000.00 | $500.00 | $1,000.00 | |
| 68 | (690.04000105) | LS | 1 | $500,000 | $100,000 | $150,000 |
| 69 | (691.04000020) | 125,000 | $1.00 | $1.00 | $1.00 | |
| 70 | (695.33120105) | LS | 1 | $500,000 | $300,000 | $100,000 |
| 71 | Field Change Payment (FCP) (697.03) | DOL | 2,037,975 | $1.00 | $1.00 | $1.00 |
| 72 | Asphalt Price Adjustment (698.04) | DOL | 151 | $1.00 | $1.00 | $1.00 |
| 73 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 74 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 75 | Mobilization (699.040001) | LS | 1 | $1,293,169 | $1,400,000 | $2,150,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of January 23, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.