NYSDOT contract D265800 bid tabulation

Sign Structures Replacement. Let by New York State DOT on October 1, 2026, Bronx, Queens, Region 11. 5 bids received; low bid $21,414,264 by Westmoreland Construction Inc.

Owner
New York State DOT
Letting
01 OCT 2026
Pay items
199
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Westmoreland Construction Inc$21,414,264Low
2Es II Enterprises LLC /DBA El Sol Enterprises$22,928,321+7.0%
3Paul J Scariano Inc$26,750,000+25%
4H & L Contracting LLC$27,264,903+27%
5Tully Construction Company Inc$33,912,838+58%
NYSDOT contract D265800: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Westmoreland Construction Inc2. Es II Enterprises LLC /DBA El Sol Enterprises3. Paul J Scariano Inc4. H & L Contracting LLC5. Tully Construction Company Inc
1Clearing and Grubbing (201.06)LS1$10,000$40,000$55,192$100,000$30,000
2Removal of Steel Supported Structural Slabs (with shear connectors) – Type A (202.2201)SF168$400.00$241.04$200.00$200.00$1,110.00
3Unclassified Excavation and Disposal (203.02)CY122$250.00$250.00$600.00$420.00$830.00
4Embankment In Place (203.03)CY70$250.00$250.00$250.00$150.00$215.00
5Select Structural Fill (203.21)CY66$200.00$350.00$650.00$1,056.24$250.00
6Structure Excavation (206.01)CY100$2,000.00$420.00$340.00$300.00$1,780.00
7Conduit Excavation and Backfill including Surface Restoration (206.03)LF273$165.00$300.00$200.00$330.00$440.00
8 (206.03120010)630$150.00$90.00$120.00$130.00$160.00
9Test Pit Excavation (206.05)EACH30$3,500.00$2,500.00$4,250.00$3,400.00$4,000.00
10Silt Fence - Temporary (209.13)LF66$10.00$45.00$45.00$95.00$135.00
11Drainage Structure Inlet Protection, Catch Basin Inserts Oil and Hydrocarbon Absorbent Pouches – Temporary (209.1708)EACH28$450.00$800.00$450.00$600.00$300.00
12Subbase Course, Type 1 (304.11)CY136$120.00$300.00$260.00$450.00$500.00
13 (404.0189)TON89$500.00$200.00$640.00$350.00$1,600.00
14 (404.0972)TON4$500.00$950.00$4,000.00$380.00$510.00
15 (404.0989)TON36$500.00$350.00$640.00$380.00$445.00
16 (404.1989)TON19$500.00$450.00$640.00$380.00$530.00
17 (404.3789)TON72$500.00$250.00$640.00$380.00$530.00
18Diluted Tack Coat (407.0102)GAL12$1.00$70.00$300.00$25.00$570.00
19Asphalt Pavement Joint Adhesive (418.7603)LF383$20.00$45.00$35.00$20.00$1.00
20 (502.0021)6$3,000.00$1,800.00$1,100.00$10,000$3,100.00
21Performance Concrete Quality Adjustment - PCC Pavement (502.99)QUALITY UNIT1$3.12$3.12$3.12$3.12$3.12
22PCC Foundation for Pavement, PEM Concrete (503.1013)CY187$500.00$650.00$480.00$500.00$1,400.00
23 (510.81000018)87$40.00$80.00$300.00$155.00$130.00
24 (520.09000010)103$15.00$50.00$40.00$70.00$215.00
25 (520.50000004)410$45.00$25.00$60.00$58.54$78.00
26Temporary Steel Sheeting (552.13)SF4,240$20.00$25.00$20.00$65.00$115.00
27Concrete for Structures, Performance (555.0021)CY259$6,000.00$4,250.00$3,000.00$3,800.00$2,850.00
28 (555.72000016)20$750.00$350.00$1,000.00$940.00$180.00
29Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT1$25.00$25.00$25.00$25.00$25.00
30Epoxy-Coated Bar Reinforcement for Structures (556.0202)LB40,508$8.00$5.00$3.00$9.00$3.75
31 (557.1111)SY12$5,000.00$5,500.00$6,000.00$5,600.00$10,800
32Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901)QUALITY UNIT1$15.16$15.16$15.16$15.16$15.16
33 (560.10040010)120$35.00$70.00$60.00$65.00$100.00
34 (560.70000008)309$30.00$170.00$300.00$225.00$100.00
35 (560.80010011)819$15.00$30.00$45.00$35.00$50.00
36 (564.510001)LB21,276$50.00$35.00$60.00$25.00$115.00
37Transition Bridge Railing (568.70)LF71$700.00$500.00$500.00$340.00$90.00
38Vertical Faced Concrete Parapet (569.03)LF49$1,750.00$800.00$1,500.00$1,700.00$1,500.00
39Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99)QUALITY UNIT1$26.14$26.14$26.14$26.14$26.14
40Lead-Exposure Control Plan (570.01)LS1$7,500.00$5,000.00$5,000.00$10,000$30,000
41Medical Testing (570.02)DOL11,000$1.00$1.00$1.00$1.00$1.00
42 (570.160001)LS1$7,500.00$10,000$6,000.00$10,000$22,000
43Disposal of Hazardous Paint Removal Waste Containing Lead (571.03)LB189$15.00$50.00$15.00$1.00$6.00
44 (572.010001)SF1,780$85.00$20.00$25.00$15.00$25.00
45 (574.030001)SF360$130.00$100.00$150.00$250.00$350.00
46Removal of Structural Concrete (580.01)CY86$3,000.00$2,250.00$4,000.00$4,500.00$1,600.00
47 (580.01010010)11$500.00$400.00$240.00$800.00$1,400.00
48Removal of Bituminous Concrete Overlay (Bridge) (581.01)SF20$125.00$5.00$180.00$380.00$550.00
49Drilling and Grouting Bolts or Reinforcing Bars (586.0201)EACH319$40.00$120.00$250.00$145.00$125.00
50Field Drill Holes in Existing Structural Steel (586.10)EACH76$70.00$90.00$120.00$150.00$605.00
51 (589.010001)LB1,941$20.00$25.00$30.00$15.50$37.00
52 (589.010002)LB1,403$20.00$25.00$30.00$15.50$37.00
53Box Beam Guide Railing (606.10)LF121$100.00$140.00$200.00$117.60$37.00
54Anchorage Units for Corrugated Beam Guide Railing (606.22)EACH3$5,000.00$5,250.00$7,500.00$4,410.00$850.00
55Anchorage Units for Corrugated Beam Guide Railing Buried In Back Slope (606.2201)EACH2$10,000$6,500.00$9,100.00$5,460.00$850.00
56HPBO (Mod.) Corrugated Beam Guide Railing End Terminal (Energy-Absorbing) (606.27)EACH7$11,000$6,400.00$9,000.00$8,500.00$4,300.00
57HPBO (Mod.) Corrugated Beam Guide Railing (606.2701)LF4,882$70.00$50.00$70.00$55.00$50.00
58Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing (606.2703)EACH8$6,500.00$6,000.00$7,000.00$7,500.00$4,000.00
59HPBO (Mod.) Corrugated Beam Median Barrier (606.2801)LF714$90.00$80.00$100.00$75.00$60.00
60Concrete Barrier Type A (Optional) (606.3001)LF147$300.00$600.00$300.00$250.00$950.00
61Single-Slope Concrete Median Barrier (Optional) (606.3041)LF71$800.00$650.00$330.00$300.00$1,300.00
62 (606.34030008)2$6,500.00$6,250.00$7,500.00$7,500.00$3,300.00
63 (606.36050010)10$4,000.00$8,900.00$4,855.00$7,500.00$3,300.00
64Removing and Disposing Corrugated Beam Guide Railing (606.71)LF438$7.00$13.00$15.00$15.00$17.00
65Removing and Disposing HPBO (Mod.) Corrugated Beam Guide Railing (606.7101)LF4,572$4.00$13.00$15.00$12.00$12.00
66Removing and Disposing HPBO (Mod.) Corrugated Beam Median Barrier (606.7201)LF678$7.00$19.00$25.00$18.00$17.00
67Removing and Disposing Box Beam Guide Railing (606.73)LF588$7.00$19.00$25.00$18.00$17.00
68Removing and Disposing Concrete Barrier (606.75)LF273$120.00$120.00$70.00$145.00$370.00
69Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920)EACH2$1,250.00$250.00$300.00$2,500.00$365.00
70Removing and Disposing Anchorage Units for HPBO(Mod) Corrugated Beam Guide Railing (606.7941)EACH23$1,500.00$375.00$500.00$2,500.00$485.00
71 (606.90000011)21$10,000$3,200.00$1,800.00$2,400.00$1,450.00
72 (607.41010010)410$8.00$20.00$40.00$20.00$27.00
73 (607.95010007)138$100.00$134.00$175.00$115.00$150.00
74 (608.01020011)55$700.00$500.00$400.00$285.00$530.00
75 (609.06000008)174$15.00$120.00$135.00$5.00$105.00
76 (609.26020111)173$150.00$245.00$300.00$175.00$175.00
77Mycorrhizal Fungi (610.0701)LB402$25.00$40.00$25.00$40.00$48.00
78Mycorrhizal Fungi (610.0702)GAL1$25.00$600.00$5,000.00$600.00$725.00
79Compost (610.10)CY1,145$90.00$105.00$100.00$50.00$125.00
80Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101)CY1,149$25.00$100.00$30.00$50.00$120.00
81Mulch for Planting Type C – USDA-APHIS Protocol Wood Chips (610.1102)CY1,149$25.00$98.00$30.00$50.00$120.00
82Topsoil - Roadside (610.1402)CY200$200.00$120.00$200.00$50.00$145.00
83Topsoil - Lawns (610.1403)CY2,040$105.00$125.00$150.00$50.00$150.00
84Preparation of Subsoil for Turf Establishment (610.15)SY1,000$6.00$10.50$15.00$10.00$125.00
85Turf Establishment -Lawns (610.1602)SY12,611$4.50$8.00$6.00$4.00$8.00
86Watering Vegetation (610.19)1,000 GALLONS100$300.00$300.00$350.00$300.00$300.00
87Mowing Limits Markers (610.22)EACH51$50.00$950.00$60.00$950.00$950.00
88Care of Trees up to 12” Diam. at Breast Height – Pruning (614.0411)EACH1$550.00$600.00$750.00$600.00$600.00
89Care of Trees Over 12” to 24” Diam. at Breast Height - Pruning (614.0421)EACH3$900.00$900.00$1,000.00$900.00$950.00
90Care of Trees Over 24” to 36” Diam. at Breast Height - Pruning (614.0431)EACH1$1,000.00$1,500.00$1,100.00$1,500.00$1,500.00
91Care of Trees Over 36” to 48” Diam. at Breast Height – Pruning (614.0441)EACH1$1,000.00$2,000.00$1,200.00$2,000.00$2,000.00
92Tree Root Zone Treatment (Vertical Mulching/Aeration) (614.08)SY105$25.00$200.00$35.00$200.00$200.00
93 (614.08210009)6$300.00$900.00$225.00$900.00$1,000.00
94Tree Root Pruning (614.09)LF1$100.00$100.00$5,000.00$2,500.00$200.00
95 (615.33010011)32$500.00$732.00$1,000.00$800.00$1,900.00
96 (615.43000011)1$1,000.00$300.00$5,000.00$500.00$125.00
97Basic Work Zone Traffic Control (619.01)LS1$1,000,000$2,275,000$2,400,000$3,250,000$8,000,000
98 (619.02970001)527$400.00$65.00$100.00$150.00$70.00
99Type III Construction Barricades (619.04)EACH12$100.00$220.00$250.00$250.00$450.00
100 (619.080101)LF6,442$2.00$2.00$2.00$2.02$2.30
101Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803)LF1$20.00$6.00$5,000.00$5.83$7.00
102 (619.100101)LF19,714$3.00$1.00$1.00$0.98$0.80
103 (619.100201)EACH14$500.00$120.00$125.00$121.97$140.00
104 (619.10050020)837$10.00$36.00$45.00$11.00$25.00
105 (619.110511)EACH3$7,500.00$25,000$30,000$75,000$70,000
106Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611)MONTH27$100.00$500.00$6,000.00$4,809.00$5,000.00
107Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711)LF3,251$90.00$50.00$90.00$112.00$90.00
108Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715)LF8,948$90.00$50.00$90.00$115.00$145.00
109Warning Lights on Temporary Positive Barriers (619.1719)EACH260$25.00$30.00$90.00$157.00$115.00
110Temporary Impact Attenuator - Redirective (Test Level 2) (619.1802)EACH10$15,000$10,000$15,000$12,000$35,000
111Temporary Impact Attenuator - Redirective (Test Level 3) (619.1803)EACH10$20,000$10,000$15,000$28,000$35,000
112Temporary Sand Barrel Module (619.21)EACH15$1,200.00$1,200.00$1,500.00$4,200.00$3,300.00
113Nighttime Operations (Entire Project) (619.24)LS1$500,000$500,000$350,000$1,950,000$2,220,000
114 (619.67020010)LS1$25,000$40,000$30,000$21,720$26,000
115Survey Operations (625.01)LS1$100,000$450,000$350,000$400,000$480,000
116 (627.50140008)1$10.00$10.00$5,000.00$5,500.00$110.00
117Cleaning, Sealing and/or Filling Joints (633.13)LF44$25.00$150.00$250.00$15.15$200.00
118 (634.90040011)27$1,750.00$1,500.00$750.00$1,500.00$970.00
119Concrete Cylinder Curing Equipment (637.04)EACH1$1,000.00$5,000.00$6,000.00$9,357.22$3,600.00
120Engineer’s Field Office – Type 3 (637.13)MONTH27$7,500.00$6,500.00$25,000$12,500$12,000
121 (637.31020020)27$1,000.00$950.00$1,000.00$1,000.00$1,000.00
122Office Technology and Supplies (637.34)DOL6,000$1.00$1.00$1.00$1.00$1.00
123Partnering Workshop (637.35)DOL5,000$1.00$1.00$1.00$1.00$1.00
124 (639.10210011)LS1$75,000$80,000$75,000$75,000$75,000
125White Paint Reflectorized Pavement Stripes – 20 mils (640.20)LF11,350$3.00$1.00$0.60$0.62$0.70
126Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21)LF5,475$3.00$1.00$0.60$0.62$0.70
127Anchor Bolts (644.11)LB15,440$15.00$25.00$17.50$28.00$11.00
128Drilled Shaft for Overhead Sign Structures (644.20)CY343$6,200.00$9,250.00$12,500$7,500.00$6,100.00
129Rectangular Footing for Overhead Sign Structures (644.30)CY19$7,000.00$4,000.00$7,500.00$7,500.00$6,100.00
130 (644.420915)EACH1$120,000$100,000$120,000$125,000$110,000
131 (644.420930)EACH2$165,000$150,000$180,000$175,000$110,000
132 (644.421035)EACH1$160,000$150,000$190,000$175,000$110,000
133 (644.421125)EACH3$175,000$150,000$175,000$175,000$110,000
134 (644.421420)EACH1$180,000$130,000$165,000$175,000$110,000
135 (644.432060)EACH1$200,000$180,000$220,000$225,000$180,000
136 (644.432560)EACH3$200,000$200,000$235,000$225,000$180,000
137 (644.432590)EACH1$200,000$190,000$220,000$225,000$180,000
138 (644.433090)EACH2$200,000$220,000$250,000$265,000$220,000
139 (644.434590)EACH1$300,000$340,000$435,000$425,000$295,000
140 (644.4401)EACH3$200,000$180,000$215,000$250,000$250,000
141 (644.4402)EACH1$425,000$325,000$410,000$425,000$250,000
142 (644.4403)EACH1$220,000$200,000$235,000$250,000$250,000
143 (644.4404)EACH1$220,000$200,000$245,000$275,000$250,000
144Performance Concrete Quality Adjustment (644.99)QUALITY UNIT1$25.00$25.00$25.00$25.00$25.00
145Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF1$100.00$51.00$51.00$55.00$215.00
146Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103)SF181$50.00$60.00$70.00$65.00$85.00
147Overhead Sign Panels (645.61)SF9,304$50.00$70.00$80.00$75.00$60.00
148Type A Sign Posts (645.81)EACH1$1,500.00$350.00$345.00$1,500.00$515.00
149High-Capacity Type A Sign Posts with Soil Plates Only (645.8106)EACH1$2,500.00$1,600.00$2,000.00$6,500.00$1,000.00
150 (645.830203)EACH4$3,500.00$5,000.00$6,000.00$6,500.00$3,500.00
151 (645.830402)EACH2$5,000.00$5,000.00$6,000.00$6,500.00$4,200.00
152Pole-Mounted Sign Support System (Band Mounting) (645.85)EACH7$300.00$350.00$400.00$500.00$160.00
153Removal of Cantilever Overhead Sign Panel(s), Structure, and Foundations (647.20)EACH3$12,500$50,000$27,000$25,000$19,500
154Removal of Single Span Overhead Sign Panel(s), Structure, and Foundations (647.21)EACH15$20,000$70,000$40,000$35,000$35,000
155Removal of Multi-Span Overhead Sign Panel(s), Structure, and Foundations (647.22)EACH2$30,000$70,000$45,000$35,000$43,000
156Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH3$1,000.00$400.00$500.00$500.00$700.00
157Relocate Sign Panel, Sign Panel Assembly Size III (Over 100 Square Feet) (647.33)EACH1$15,000$1,300.00$1,700.00$1,600.00$1,400.00
158 (654.0101)EACH1$650.00$2,000.00$3,200.00$1,600.00$5,000.00
159 (654.0102)EACH1$800.00$2,000.00$3,400.00$1,600.00$5,000.00
160 (654.0103)EACH2$900.00$2,000.00$3,700.00$1,600.00$5,000.00
161 (654.0104)EACH4$1,100.00$2,000.00$4,400.00$1,600.00$5,000.00
162Concrete Foundation for Impact Attenuators (654.05)CY4$4,500.00$3,500.00$4,500.00$12,000$4,100.00
163Remove and Dispose Impact Attenuator Systems (654.0701)EACH10$2,500.00$2,000.00$1,000.00$1,200.00$2,700.00
164Expendable Impact Attenuator , TL 2, ≤ 2 ft Obstruction Width (654.5020)EACH1$35,000$27,000$50,000$44,000$36,000
165Expendable Impact Attenuator , TL 2, > 2 ft up to 5 ft Obstruction Width (654.5022)EACH1$45,000$27,000$55,000$56,000$36,000
166 (654.51320015)1$45,000$35,000$50,000$58,000$40,000
167 (654.51350015)1$50,000$40,000$55,000$68,000$40,000
168 (670.2306)LF641$100.00$80.00$200.00$90.00$110.00
169 (670.7004)LF37$11.00$10.00$10.00$10.40$12.50
170Ground Wire No. 6 AWG. (670.7501)LF173$7.00$6.00$9.00$6.00$7.00
171 (670.75060011)16$14.00$12.00$9.00$13.70$16.00
172 (680.51050010)1$5,000.00$3,500.00$5,500.00$3,560.00$7,500.00
173 (680.520108)LF231$110.00$90.00$180.00$100.00$120.00
174 (680.520205)LF120$100.00$80.00$75.00$90.00$110.00
175 (680.520406)LF30$130.00$120.00$150.00$130.00$150.00
176 (680.53000111)2$5,000.00$2,500.00$7,500.00$3,280.00$4,000.00
177 (680.83200010)LS1$30,000$25,000$30,000$22,308$60,000
178 (680.96460011)1$10,000$8,000.00$17,500$8,660.00$10,000
179 (680.97165011)1$22,500$25,000$30,000$22,480$27,000
180 (680.98124811)1$6,000.00$5,000.00$3,250.00$5,310.00$6,400.00
181 (680.99910011)LS1$100,000$30,000$75,000$79,110$95,000
182 (683.07100010)95$45.00$50.00$25.00$44.30$54.00
183 (683.09150011)1$26,000$25,000$40,000$25,350$30,000
184 (683.09150111)9$30,000$14,000$40,000$27,240$33,000
185 (683.09230208)1$15,000$15,000$20,000$12,300$15,000
186 (683.10110008)1$30,000$25,000$60,000$26,750$32,000
187 (683.80800208)1$5,000.00$5,000.00$4,000.00$2,974.00$3,500.00
188 (683.85020011)1$7,500.00$5,860.00$20,000$6,190.00$7,500.00
189 (683.91150011)2$40,000$30,000$45,000$35,210$42,000
190White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF4,184$4.00$1.50$1.25$1.02$1.00
191Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF1,382$5.00$1.50$1.25$1.02$1.00
192 (685.16010014)1,944$6.00$2.50$1.95$2.07$2.00
193 (685.17010014)3,495$6.00$2.50$1.95$2.07$2.00
194 (691.04000020)252,000$1.00$1.00$1.00$1.00$1.00
195Field Change Payment (FCP) (697.03)DOL1,290,000$1.00$1.00$1.00$1.00$1.00
196Asphalt Price Adjustment (698.04)DOL100$1.00$1.00$1.00$1.00$1.00
197Fuel Price Adjustment (698.05)DOL100$1.00$1.00$1.00$1.00$1.00
198Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00
199Mobilization (699.040001)LS1$750,000$850,138$1,000,000$1,048,000$1,240,000
NYSDOT contract D265800: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of October 1, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy