NYSDOT contract D265416 bid tabulation

TRAFFIC SYSTEMS IMPROVEMENT - Various Locations. Let by New York State DOT on February 27, 2025, Herkimer, Montgomery, Oneida, Region 02. 1 bid received; low bid $3,658,718 by Power Line Constructors Inc.

Owner
New York State DOT
Letting
27 FEB 2025
Pay items
143
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Power Line Constructors Inc$3,658,718Low
NYSDOT contract D265416: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Power Line Constructors Inc
1Unclassified Excavation and Disposal (203.02)CY171$258.00
2 (203.98080015)300$10.12
3 (205.0201)LS1$5,311.00
4Field Organic Vapor Monitoring of Contaminated Soil (205.03)HR12$192.00
5 (205.050201)TON24$553.00
6Conduit Excavation and Backfill including Surface Restoration (206.03)LF5,517$77.00
7Test Pit Excavation (206.05)EACH6$2,686.00
8Subbase Course, Type 2 (304.12)CY89$539.00
9 (404.0982)TON9$913.00
10Straight Tack Coat (407.0103)GAL9$110.00
11Asphalt Pavement Joint Adhesive (418.7603)LF718$5.50
12 (502.20010018)20$187.00
13PCC Foundation for Pavement, PEM Concrete (503.1013)CY40$1,578.00
14 (520.51000006)38$138.00
15 (604.070101)EACH1$4,180.00
16 (604.070201)EACH2$4,180.00
17Resetting Box Beam Guide Railing (606.53)LF144$39.00
18Resetting Box Beam Guide Rail Turned-Down Terminal (606.5920)EACH2$682.00
19Removing and Storing Box Beam Guide Railing (606.63)LF144$10.00
20Removing and Storing Box Beam Guide Railing End Assembly (606.6920)EACH2$150.00
21 (607.61000005)50$100.00
22Concrete Sidewalks and Driveways (608.0101)CY4$3,000.00
23 (608.01030008)217$495.00
24 (608.21000003)36$385.00
25 (609.0401)LF371$154.00
26Turf Establishment – Performance (610.1605)SY153$29.90
27 (618.78101115)5$11,696
28Basic Work Zone Traffic Control (619.01)LS1$336,879
29 (619.080102)LF6,978$2.00
30Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613)MONTH100$100.00
31Survey Operations (625.01)LS1$166,375
32 (625.09010015)LS1$9,180.00
33 (627.50140008)427$16.50
34Concrete Cylinder Curing Equipment (637.04)EACH1$8,190.00
35Engineer’s Field Office – Type 2 (637.12)MONTH24$1,785.00
36Office Technology and Supplies (637.34)DOL3,500$1.00
37 (645.45040224)2$3,641.00
38Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF32$40.00
39Overhead Sign Panels (645.61)SF99$59.96
40Illuminated Sign Panels (645.76)SF92$465.00
41Type A Sign Posts (645.81)EACH14$250.00
42Relocate Overhead Sign Panel, Sign Panel Assembly (647.23)EACH1$297.00
43Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH1$75.00
44Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH5$50.00
45 (648.50010008)5$1,074.00
46 (662.01000107)LS1$9,363.00
47 (665.20000011)2$684.00
48 (670.0107)EACH8$4,226.00
49 (670.01120302)8$1,339.00
50 (670.1530)EACH8$3,055.00
51 (670.1720)EACH8$1,654.00
52Breakaway Transformer Base (Aluminum) (670.19)EACH8$667.00
53 (670.2602)LF1,500$7.99
54Pullboxes 5 to 7 1/2 cubic feet, inside volume (Lighting) (670.3006)EACH2$2,479.00
55 (670.42100002)1$20,759
56 (670.42110002)2$19,584
57 (670.42120002)1$20,758
58Photoelectric Controls (670.60)EACH8$45.36
59 (670.7004)LF5,010$2.25
60Ground Wire No. 6 AWG. (670.7501)LF1,610$2.25
61Performance Concrete Quality Adjustment (670.99)QUALITY UNIT1$9.82
62 (675.99000023)5,000$1.00
63 (680.05010007)4$20,629
64 (680.05020007)8$3,550.00
65 (680.05031002)2$49,409
66 (680.05033002)2$16,632
67 (680.05040004)10$3,557.00
68 (680.05060004)1$10,390
69 (680.11131014)11$7,759.00
70Pole Excavation and Concrete Foundation (680.5001)CY72$2,788.00
71Concrete Base for Controller Cabinet (680.5002)EACH8$3,812.00
72Concrete Work Pad (5 feet x 5 feet x 4 inches) (680.5003)EACH5$777.00
73 (680.51000010)3$1,067.00
74 (680.510501)EACH31$2,586.00
75 (680.51100010)9$153.00
76 (680.520103)LF50$9.81
77 (680.520106)LF3,051$15.57
78 (680.520108)LF2,126$35.04
79 (680.520110)LF100$53.62
80Conduit Jacking or Boring (680.53)LF750$150.00
81 (680.53010010)50$6.74
82 (680.53080305)100$9.74
83Inductance Loop Installation (680.54)LF300$24.97
84 (680.600230)EACH4$8,322.00
85 (680.600834)EACH1$20,154
86 (680.621834)EACH1$12,339
87 (680.621926)EACH1$9,852.00
88 (680.621930)EACH1$10,775
89 (680.621938)EACH1$12,711
90 (680.621940)EACH1$13,236
91 (680.621942)EACH1$15,636
92 (680.622032)EACH1$10,915
93 (680.631950)EACH1$23,390
94 (680.6710)EACH4$1,635.00
95 (680.6714)EACH1$1,628.00
96 (680.6814)EACH8$2,478.00
97Dual Span Wire Assembly with Upper Tether Wire (680.7002)EACH2$4,408.00
98Dual Span Wire Assembly with Lower Tether Wire (680.7003)EACH1$5,123.00
99Guy Wire Assembly (680.7005)EACH1$996.00
100Riser Assembly, 1-inch Diameter (680.700603)EACH1$2,131.00
101Riser Assembly, 2-inch Diameter (680.700606)EACH4$1,082.00
102Shielded Lead-in Cable (680.71)LF100$2.52
103Inductance Loop Wire (680.72)LF300$0.25
104 (680.730306)LF6,630$2.95
105 (680.730514)LF6,480$3.69
106 (680.730714)LF415$4.98
107 (680.731014)LF300$6.91
108 (680.731514)LF300$9.70
109 (680.78000001)LS1$109,939
110 (680.78010005)6$568.00
111 (680.78040005)3$589.00
112Battery Backup System (680.80)EACH1$9,881.00
113 (680.80200125)1$3,006.00
114 (680.80324515)7$2,733.00
115 (680.80324708)6$1,211.00
116Install Ball/Arrow LED Traffic Signal Module (680.810308)EACH82$3.22
117Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601)EACH82$313.00
118Traffic Signal Bracket Assembly - 1 Way (680.8111)EACH6$313.00
119Traffic Signal Bracket Assembly - 2 Way (680.8112)EACH4$482.00
120 (680.81210004)18$334.00
121Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105)EACH2$132.00
122Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106)EACH2$326.00
123Pedestrian Signal Post Top Mount Assembly (680.8142)EACH2$448.00
124Backplates for Traffic Signal Heads (680.8199)EACH26$289.00
125 (680.81990003)5$663.00
126 (680.8204)EACH5$846.00
127 (680.8207)EACH11$1,015.00
128Flashing Beacon Sign Assembly (680.8220)EACH8$4,668.00
129 (680.82220002)8$5,159.00
130Breakaway Transformer Base (680.8223)EACH8$875.00
131 (680.82254310)2$16,320
132 (680.83010005)690$6.84
133 (680.90020015)4$2,203.00
134 (680.90920008)4$1,761.00
135Install Electrical Disconnect/Generator Transfer Switch (680.9499)EACH3$186.00
136 (680.950306)LF1,200$10.01
137Performance Concrete Quality Adjustment (680.99)QUALITY UNIT1$10.75
138White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104)LF6,978$3.95
139Field Change Payment (FCP) (697.03)DOL114,000$1.00
140Asphalt Price Adjustment (698.04)DOL400$1.00
141Fuel Price Adjustment (698.05)DOL400$1.00
142Steel/Iron Price Adjustment (698.06)DOL100$1.00
143Mobilization (699.040001)LS1$138,000
NYSDOT contract D265416: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of February 27, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy