NYSDOT contract D265416 bid tabulation
TRAFFIC SYSTEMS IMPROVEMENT - Various Locations. Let by New York State DOT on February 27, 2025, Herkimer, Montgomery, Oneida, Region 02. 1 bid received; low bid $3,658,718 by Power Line Constructors Inc.
- Owner
- New York State DOT
- Letting
- 27 FEB 2025
- Pay items
- 143
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Power Line Constructors Inc | $3,658,718 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Power Line Constructors Inc |
|---|---|---|---|---|
| 1 | Unclassified Excavation and Disposal (203.02) | CY | 171 | $258.00 |
| 2 | (203.98080015) | 300 | $10.12 | |
| 3 | (205.0201) | LS | 1 | $5,311.00 |
| 4 | Field Organic Vapor Monitoring of Contaminated Soil (205.03) | HR | 12 | $192.00 |
| 5 | (205.050201) | TON | 24 | $553.00 |
| 6 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 5,517 | $77.00 |
| 7 | Test Pit Excavation (206.05) | EACH | 6 | $2,686.00 |
| 8 | Subbase Course, Type 2 (304.12) | CY | 89 | $539.00 |
| 9 | (404.0982) | TON | 9 | $913.00 |
| 10 | Straight Tack Coat (407.0103) | GAL | 9 | $110.00 |
| 11 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 718 | $5.50 |
| 12 | (502.20010018) | 20 | $187.00 | |
| 13 | PCC Foundation for Pavement, PEM Concrete (503.1013) | CY | 40 | $1,578.00 |
| 14 | (520.51000006) | 38 | $138.00 | |
| 15 | (604.070101) | EACH | 1 | $4,180.00 |
| 16 | (604.070201) | EACH | 2 | $4,180.00 |
| 17 | Resetting Box Beam Guide Railing (606.53) | LF | 144 | $39.00 |
| 18 | Resetting Box Beam Guide Rail Turned-Down Terminal (606.5920) | EACH | 2 | $682.00 |
| 19 | Removing and Storing Box Beam Guide Railing (606.63) | LF | 144 | $10.00 |
| 20 | Removing and Storing Box Beam Guide Railing End Assembly (606.6920) | EACH | 2 | $150.00 |
| 21 | (607.61000005) | 50 | $100.00 | |
| 22 | Concrete Sidewalks and Driveways (608.0101) | CY | 4 | $3,000.00 |
| 23 | (608.01030008) | 217 | $495.00 | |
| 24 | (608.21000003) | 36 | $385.00 | |
| 25 | (609.0401) | LF | 371 | $154.00 |
| 26 | Turf Establishment – Performance (610.1605) | SY | 153 | $29.90 |
| 27 | (618.78101115) | 5 | $11,696 | |
| 28 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $336,879 |
| 29 | (619.080102) | LF | 6,978 | $2.00 |
| 30 | Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613) | MONTH | 100 | $100.00 |
| 31 | Survey Operations (625.01) | LS | 1 | $166,375 |
| 32 | (625.09010015) | LS | 1 | $9,180.00 |
| 33 | (627.50140008) | 427 | $16.50 | |
| 34 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $8,190.00 |
| 35 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 24 | $1,785.00 |
| 36 | Office Technology and Supplies (637.34) | DOL | 3,500 | $1.00 |
| 37 | (645.45040224) | 2 | $3,641.00 | |
| 38 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 32 | $40.00 |
| 39 | Overhead Sign Panels (645.61) | SF | 99 | $59.96 |
| 40 | Illuminated Sign Panels (645.76) | SF | 92 | $465.00 |
| 41 | Type A Sign Posts (645.81) | EACH | 14 | $250.00 |
| 42 | Relocate Overhead Sign Panel, Sign Panel Assembly (647.23) | EACH | 1 | $297.00 |
| 43 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 1 | $75.00 |
| 44 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 5 | $50.00 |
| 45 | (648.50010008) | 5 | $1,074.00 | |
| 46 | (662.01000107) | LS | 1 | $9,363.00 |
| 47 | (665.20000011) | 2 | $684.00 | |
| 48 | (670.0107) | EACH | 8 | $4,226.00 |
| 49 | (670.01120302) | 8 | $1,339.00 | |
| 50 | (670.1530) | EACH | 8 | $3,055.00 |
| 51 | (670.1720) | EACH | 8 | $1,654.00 |
| 52 | Breakaway Transformer Base (Aluminum) (670.19) | EACH | 8 | $667.00 |
| 53 | (670.2602) | LF | 1,500 | $7.99 |
| 54 | Pullboxes 5 to 7 1/2 cubic feet, inside volume (Lighting) (670.3006) | EACH | 2 | $2,479.00 |
| 55 | (670.42100002) | 1 | $20,759 | |
| 56 | (670.42110002) | 2 | $19,584 | |
| 57 | (670.42120002) | 1 | $20,758 | |
| 58 | Photoelectric Controls (670.60) | EACH | 8 | $45.36 |
| 59 | (670.7004) | LF | 5,010 | $2.25 |
| 60 | Ground Wire No. 6 AWG. (670.7501) | LF | 1,610 | $2.25 |
| 61 | Performance Concrete Quality Adjustment (670.99) | QUALITY UNIT | 1 | $9.82 |
| 62 | (675.99000023) | 5,000 | $1.00 | |
| 63 | (680.05010007) | 4 | $20,629 | |
| 64 | (680.05020007) | 8 | $3,550.00 | |
| 65 | (680.05031002) | 2 | $49,409 | |
| 66 | (680.05033002) | 2 | $16,632 | |
| 67 | (680.05040004) | 10 | $3,557.00 | |
| 68 | (680.05060004) | 1 | $10,390 | |
| 69 | (680.11131014) | 11 | $7,759.00 | |
| 70 | Pole Excavation and Concrete Foundation (680.5001) | CY | 72 | $2,788.00 |
| 71 | Concrete Base for Controller Cabinet (680.5002) | EACH | 8 | $3,812.00 |
| 72 | Concrete Work Pad (5 feet x 5 feet x 4 inches) (680.5003) | EACH | 5 | $777.00 |
| 73 | (680.51000010) | 3 | $1,067.00 | |
| 74 | (680.510501) | EACH | 31 | $2,586.00 |
| 75 | (680.51100010) | 9 | $153.00 | |
| 76 | (680.520103) | LF | 50 | $9.81 |
| 77 | (680.520106) | LF | 3,051 | $15.57 |
| 78 | (680.520108) | LF | 2,126 | $35.04 |
| 79 | (680.520110) | LF | 100 | $53.62 |
| 80 | Conduit Jacking or Boring (680.53) | LF | 750 | $150.00 |
| 81 | (680.53010010) | 50 | $6.74 | |
| 82 | (680.53080305) | 100 | $9.74 | |
| 83 | Inductance Loop Installation (680.54) | LF | 300 | $24.97 |
| 84 | (680.600230) | EACH | 4 | $8,322.00 |
| 85 | (680.600834) | EACH | 1 | $20,154 |
| 86 | (680.621834) | EACH | 1 | $12,339 |
| 87 | (680.621926) | EACH | 1 | $9,852.00 |
| 88 | (680.621930) | EACH | 1 | $10,775 |
| 89 | (680.621938) | EACH | 1 | $12,711 |
| 90 | (680.621940) | EACH | 1 | $13,236 |
| 91 | (680.621942) | EACH | 1 | $15,636 |
| 92 | (680.622032) | EACH | 1 | $10,915 |
| 93 | (680.631950) | EACH | 1 | $23,390 |
| 94 | (680.6710) | EACH | 4 | $1,635.00 |
| 95 | (680.6714) | EACH | 1 | $1,628.00 |
| 96 | (680.6814) | EACH | 8 | $2,478.00 |
| 97 | Dual Span Wire Assembly with Upper Tether Wire (680.7002) | EACH | 2 | $4,408.00 |
| 98 | Dual Span Wire Assembly with Lower Tether Wire (680.7003) | EACH | 1 | $5,123.00 |
| 99 | Guy Wire Assembly (680.7005) | EACH | 1 | $996.00 |
| 100 | Riser Assembly, 1-inch Diameter (680.700603) | EACH | 1 | $2,131.00 |
| 101 | Riser Assembly, 2-inch Diameter (680.700606) | EACH | 4 | $1,082.00 |
| 102 | Shielded Lead-in Cable (680.71) | LF | 100 | $2.52 |
| 103 | Inductance Loop Wire (680.72) | LF | 300 | $0.25 |
| 104 | (680.730306) | LF | 6,630 | $2.95 |
| 105 | (680.730514) | LF | 6,480 | $3.69 |
| 106 | (680.730714) | LF | 415 | $4.98 |
| 107 | (680.731014) | LF | 300 | $6.91 |
| 108 | (680.731514) | LF | 300 | $9.70 |
| 109 | (680.78000001) | LS | 1 | $109,939 |
| 110 | (680.78010005) | 6 | $568.00 | |
| 111 | (680.78040005) | 3 | $589.00 | |
| 112 | Battery Backup System (680.80) | EACH | 1 | $9,881.00 |
| 113 | (680.80200125) | 1 | $3,006.00 | |
| 114 | (680.80324515) | 7 | $2,733.00 | |
| 115 | (680.80324708) | 6 | $1,211.00 | |
| 116 | Install Ball/Arrow LED Traffic Signal Module (680.810308) | EACH | 82 | $3.22 |
| 117 | Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601) | EACH | 82 | $313.00 |
| 118 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 6 | $313.00 |
| 119 | Traffic Signal Bracket Assembly - 2 Way (680.8112) | EACH | 4 | $482.00 |
| 120 | (680.81210004) | 18 | $334.00 | |
| 121 | Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105) | EACH | 2 | $132.00 |
| 122 | Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106) | EACH | 2 | $326.00 |
| 123 | Pedestrian Signal Post Top Mount Assembly (680.8142) | EACH | 2 | $448.00 |
| 124 | Backplates for Traffic Signal Heads (680.8199) | EACH | 26 | $289.00 |
| 125 | (680.81990003) | 5 | $663.00 | |
| 126 | (680.8204) | EACH | 5 | $846.00 |
| 127 | (680.8207) | EACH | 11 | $1,015.00 |
| 128 | Flashing Beacon Sign Assembly (680.8220) | EACH | 8 | $4,668.00 |
| 129 | (680.82220002) | 8 | $5,159.00 | |
| 130 | Breakaway Transformer Base (680.8223) | EACH | 8 | $875.00 |
| 131 | (680.82254310) | 2 | $16,320 | |
| 132 | (680.83010005) | 690 | $6.84 | |
| 133 | (680.90020015) | 4 | $2,203.00 | |
| 134 | (680.90920008) | 4 | $1,761.00 | |
| 135 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 3 | $186.00 |
| 136 | (680.950306) | LF | 1,200 | $10.01 |
| 137 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $10.75 |
| 138 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 6,978 | $3.95 |
| 139 | Field Change Payment (FCP) (697.03) | DOL | 114,000 | $1.00 |
| 140 | Asphalt Price Adjustment (698.04) | DOL | 400 | $1.00 |
| 141 | Fuel Price Adjustment (698.05) | DOL | 400 | $1.00 |
| 142 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 |
| 143 | Mobilization (699.040001) | LS | 1 | $138,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of February 27, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.