| 1 | (201.07010004) | | 2 | $7,650.00 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 641 | $310.00 |
| 3 | Embankment In Place (203.03) | CY | 222 | $125.00 |
| 4 | (205.0201) | LS | 1 | $4,360.00 |
| 5 | Field Organic Vapor Monitoring of Contaminated Soil (205.03) | HR | 8 | $195.00 |
| 6 | Petroleum Contamination Parameter Analysis (205.0401) | EACH | 3 | $1,936.00 |
| 7 | (205.050201) | TON | 9 | $340.00 |
| 8 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 2,810 | $150.00 |
| 9 | Test Pit Excavation (206.05) | EACH | 54 | $1,975.00 |
| 10 | (304.11000008) | | 269 | $122.25 |
| 11 | (404.1281) | TON | 23 | $384.00 |
| 12 | (404.1989) | TON | 7 | $350.00 |
| 13 | (404.3789) | TON | 18 | $320.00 |
| 14 | Straight Tack Coat (407.0103) | GAL | 13 | $46.00 |
| 15 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 1,348 | $2.45 |
| 16 | PCC Foundation for Pavement, PEM Concrete (503.1013) | CY | 42 | $1,085.00 |
| 17 | Concrete for Structures, Performance (555.0021) | CY | 5 | $2,420.00 |
| 18 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $25.00 |
| 19 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 121 | $82.50 |
| 20 | Removal of Structural Concrete (580.01) | CY | 5 | $700.00 |
| 21 | (607.91120001) | | 24 | $300.00 |
| 22 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 1 | $140.00 |
| 23 | Concrete Sidewalks and Driveways (608.0101) | CY | 80 | $1,080.00 |
| 24 | (608.01020005) | | 5 | $5,090.00 |
| 25 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 10 | $470.00 |
| 26 | (608.21000003) | | 66 | $425.00 |
| 27 | (609.0401) | LF | 1,484 | $96.00 |
| 28 | Turf Establishment – Performance (610.1605) | SY | 473 | $28.00 |
| 29 | (614.060203) | EACH | 2 | $2,665.00 |
| 30 | (618.70000124) | | 16 | $910.00 |
| 31 | (618.72136124) | | 16 | $3,695.00 |
| 32 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $845,000 |
| 33 | Maintain Traffic Signal Equipment (Requirement B) Intersection (619.1612) | MONTH | 54 | $200.00 |
| 34 | (619.27000007) | | 2 | $2,060.00 |
| 35 | Survey Operations (625.01) | LS | 1 | $188,200 |
| 36 | Concrete Right of Way Markers Type L (Low) (625.04) | EACH | 11 | $1,455.00 |
| 37 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 15 | $735.00 |
| 38 | (627.50140008) | | 695 | $6.20 |
| 39 | Cleaning and Preparation of Pavement Surfaces-Lines (635.0103) | LF | 2,623 | $1.50 |
| 40 | Cleaning and Preparation of Pavement Surfaces-Symbols (635.0303) | EACH | 5 | $200.00 |
| 41 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $7,260.00 |
| 42 | Engineer’s Field Office – Type 1 (637.11) | MONTH | 24 | $5,720.00 |
| 43 | Office Technology and Supplies (637.34) | DOL | 2,000 | $1.00 |
| 44 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 |
| 45 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 77 | $120.00 |
| 46 | Illuminated Sign Panels (645.76) | SF | 12 | $500.00 |
| 47 | Type A Sign Posts (645.81) | EACH | 18 | $105.00 |
| 48 | (645.830202) | EACH | 4 | $9,500.00 |
| 49 | Flexible Delineator, Single Unit, One Way (646.40) | EACH | 2 | $500.00 |
| 50 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 9 | $455.00 |
| 51 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 17 | $146.00 |
| 52 | (657.020001) | LS | 1 | $3,450.00 |
| 53 | (660.65000101) | | 2 | $2,715.00 |
| 54 | (662.60000108) | | 9,000 | $1.00 |
| 55 | (662.60030008) | | 2 | $500.00 |
| 56 | (662.60510008) | | 1 | $1,890.00 |
| 57 | Adjust Existing Valve Box Elevation (663.33) | EACH | 3 | $650.00 |
| 58 | Adjust Existing Hydrant Elevation (663.34) | EACH | 3 | $1,575.00 |
| 59 | (680.05010007) | | 9 | $28,000 |
| 60 | (680.05020007) | | 8 | $4,950.00 |
| 61 | Pole Excavation and Concrete Foundation (680.5001) | CY | 93 | $4,150.00 |
| 62 | (680.51010009) | | 2 | $1,485.00 |
| 63 | (680.510501) | EACH | 48 | $2,750.00 |
| 64 | (680.520106) | LF | 606 | $40.00 |
| 65 | (680.520108) | LF | 1,602 | $58.80 |
| 66 | (680.520110) | LF | 636 | $68.00 |
| 67 | (680.56050008) | | 2 | $650.00 |
| 68 | (680.601330) | EACH | 1 | $21,800 |
| 69 | (680.601333) | EACH | 1 | $22,700 |
| 70 | (680.621840) | EACH | 1 | $16,000 |
| 71 | (680.621845) | EACH | 2 | $18,700 |
| 72 | (680.621850) | EACH | 1 | $19,500 |
| 73 | (680.621930) | EACH | 2 | $15,500 |
| 74 | (680.621935) | EACH | 2 | $16,500 |
| 75 | (680.621955) | EACH | 2 | $26,000 |
| 76 | (680.622035) | EACH | 1 | $16,000 |
| 77 | (680.622050) | EACH | 2 | $22,600 |
| 78 | (680.622055) | EACH | 1 | $26,250 |
| 79 | (680.622140) | EACH | 1 | $18,800 |
| 80 | (680.622145) | EACH | 1 | $24,800 |
| 81 | (680.622245) | EACH | 1 | $20,000 |
| 82 | (680.622250) | EACH | 2 | $20,500 |
| 83 | (680.622350) | EACH | 1 | $20,500 |
| 84 | (680.622450) | EACH | 1 | $24,000 |
| 85 | (680.681202) | EACH | 26 | $2,000.00 |
| 86 | (680.682002) | EACH | 3 | $3,050.00 |
| 87 | Dual Span Wire Assembly with Upper Tether Wire (680.7002) | EACH | 1 | $1,800.00 |
| 88 | Messenger Assembly (680.7004) | EACH | 171 | $11.00 |
| 89 | (680.730214) | LF | 493 | $5.25 |
| 90 | (680.730314) | LF | 707 | $6.00 |
| 91 | (680.730514) | LF | 18,569 | $6.00 |
| 92 | (680.731014) | LF | 2,940 | $8.00 |
| 93 | (680.77000001) | LS | 1 | $53,000 |
| 94 | (680.79000001) | LS | 1 | $61,500 |
| 95 | (680.80324515) | | 9 | $4,900.00 |
| 96 | Traffic Signal Module - 12-inch, Red Ball, LED (680.810101) | EACH | 83 | $160.00 |
| 97 | Traffic Signal Module - 12-inch, Red Arrow, LED (680.810102) | EACH | 3 | $155.00 |
| 98 | Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103) | EACH | 81 | $170.00 |
| 99 | Traffic Signal Module - 12-inch, Yellow Arrow, LED (680.810104) | EACH | 12 | $160.00 |
| 100 | Traffic Signal Module - 12-inch, Green Ball, LED (680.810105) | EACH | 81 | $170.00 |
| 101 | Traffic Signal Module - 12-inch, Green Arrow, LED (680.810106) | EACH | 11 | $170.00 |
| 102 | Traffic Signal Section - Aluminum Type I, 12-inch (680.810107) | EACH | 271 | $325.00 |
| 103 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 6 | $650.00 |
| 104 | Traffic Signal Bracket Assembly - 2 Way (680.8112) | EACH | 3 | $875.00 |
| 105 | (680.81230008) | | 56 | $675.00 |
| 106 | (680.81240008) | | 12 | $875.00 |
| 107 | Pedestrian Signal Section - Aluminum Type I, 12 inch (680.813103) | EACH | 84 | $450.00 |
| 108 | Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105) | EACH | 42 | $440.00 |
| 109 | Pedestrian Signal Bracket Mount Assembly (680.8141) | EACH | 42 | $550.00 |
| 110 | Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001) | EACH | 42 | $440.00 |
| 111 | (680.8151) | EACH | 38 | $1,775.00 |
| 112 | (680.8152) | EACH | 4 | $3,950.00 |
| 113 | Backplates for Traffic Signal Heads (680.8199) | EACH | 86 | $450.00 |
| 114 | (680.8201) | EACH | 3 | $800.00 |
| 115 | (680.8207) | EACH | 27 | $1,350.00 |
| 116 | Breakaway Transformer Base (680.8223) | EACH | 27 | $1,025.00 |
| 117 | (680.82540009) | | 200 | $5.00 |
| 118 | (680.94000008) | | 9 | $1,500.00 |
| 119 | Meter Pan (680.9402) | EACH | 1 | $1,200.00 |
| 120 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 9 | $1,425.00 |
| 121 | (680.950206) | LF | 900 | $6.00 |
| 122 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $15.00 |
| 123 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 357 | $9.60 |
| 124 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 10,250 | $3.50 |
| 125 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 6 | $200.00 |
| 126 | Field Change Payment (FCP) (697.03) | DOL | 328,000 | $1.00 |
| 127 | Asphalt Price Adjustment (698.04) | DOL | 146 | $1.00 |
| 128 | Fuel Price Adjustment (698.05) | DOL | 602 | $1.00 |
| 129 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 |
| 130 | Mobilization (699.040001) | LS | 1 | $189,000 |