NYSDOT contract D265662 bid tabulation

Bridge Preservation SFY 25. Let by New York State DOT on February 26, 2026, Albany, Rensselaer, Region 01. 1 bid received; low bid $15,455,797 by D A Collins Construction Co Inc.

Owner
New York State DOT
Letting
26 FEB 2026
Pay items
129
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1D A Collins Construction Co Inc$15,455,797Low
NYSDOT contract D265662: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. D A Collins Construction Co Inc
1Unclassified Excavation and Disposal (203.02)CY414$215.00
2Select Granular Fill (203.07)CY80$24.50
3Select Structural Fill (203.21)CY21$785.00
4Controlled Low Strength Material (CLSM) (204.01)CY8$1,000.00
5Structure Excavation (206.01)CY21$565.00
6Trench and Culvert Excavation (206.0201)CY87$250.00
7Conduit Excavation and Backfill including Surface Restoration (206.03)LF266$34.00
8 (206.03120010)450$26.50
9 (206.03120011)2,326$55.50
10Geotextile Bedding (207.20)SY25$54.00
11 (210.481201)SF2,070$47.00
12Subbase Course, Type 2 (304.12)CY204$280.00
13 (404.0982)TON301$290.00
14 (404.1989)TON49$290.00
15 (404.3789)TON154$290.00
16Straight Tack Coat (407.0103)GAL300$21.50
17Asphalt Pavement Joint Adhesive (418.7603)LF1,730$4.25
18Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY2,213$13.00
19 (520.09000010)264$5.30
20Shields and Shoring (552.17)SF336$1.15
21Concrete for Structures, Performance (555.0021)CY269$3,000.00
22Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT1$7.50
23Epoxy-Coated Bar Reinforcement for Structures (556.0202)LB22,171$5.40
24Stainless Steel Bar Reinforcement for Structures (556.0205)LB8,737$8.00
25Stud Shear Connectors for Bridges (556.03)EACH2,373$25.00
26 (557.1012)SY361$795.00
27Sidewalks and Safety Walks (557.30)SY43$844.00
28 (557.66130105)34$2,611.00
29 (557.75010216)480$460.00
30Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901)QUALITY UNIT1$9.00
31Performance Concrete Quality Adjustment – Sidewalks and Safety Walks (557.9902)QUALITY UNIT1$12.00
32Longitudinal Sawcut Grooving of Structural Slab Surface (558.02)SY271$29.50
33Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01)SF2,340$2.85
34Protective Sealing of New Structural Concrete (559.02)SF9,572$2.85
35 (564.510001)LB334$46.50
36 (564.510002)LB4,986$72.00
37 (564.700001)EACH20$6,550.00
38 (564.700002)EACH21$6,850.00
39 (564.700003)EACH1$6,900.00
40 (564.700004)EACH4$7,450.00
41 (564.700005)EACH2$7,050.00
42 (564.700006)EACH5$6,950.00
43 (564.700007)EACH6$5,650.00
44Type M.R. Expansion Bearing (226 to 450 k) (565.1522)EACH24$7,200.00
45Type M.R. Expansion Bearing (Over 900 k) (565.1525)EACH9$16,600
46Type M.R. Fixed Bearing (Over 900 k) (565.1725)EACH9$15,000
47Type E.B. Fixed Bearing (Over 225 k) (565.2025)EACH9$4,900.00
48 (565.20310003)36$4,950.00
49Type E.B. Expansion Bearing (169 to 225 k) (565.2034)EACH24$4,350.00
50Type E.B. Expansion Bearing (Over 225 k) (565.2035)EACH20$6,950.00
51 (566.13142001)304$2,750.00
52Steel Bridge Railing (Four-Rail) (568.51)LF234$385.00
53Single Slope (Full-Section) Concrete Bridge Barrier (569.05)LF81$1,200.00
54Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99)QUALITY UNIT1$9.09
55Lead-Exposure Control Plan (570.01)LS1$2,650.00
56Medical Testing (570.02)DOL3,000$1.00
57Personal-Exposure-Monitoring Sample Analysis (570.03)DOL3,000$1.00
58Decontamination Facilities (570.04)CALENDAR WEEK15$21.50
59 (570.150001)LS1$90,400
60Disposal of Hazardous Paint Removal Waste Containing Lead (571.03)LB17,615$0.21
61 (572.020001)LS1$1.15
62 (573.010001)LS1$513,000
63 (576.03210011)16$410.00
64Removal of Structural Concrete (580.01)CY176$3,220.00
65Removal of Concrete Approach Slab (580.04)SF3,340$12.00
66Removal and Replacement of Structural Concrete (582.0052)SF2,474$350.00
67Removal of Structural Concrete- Replacement with Vertical and Overhead Patching Material (582.0061)SF174$590.00
68 (585.01)EACH113$12,800
69 (585.02)EACH18$62,300
70Drilling and Grouting Bolts or Reinforcing Bars (586.0201)EACH1,357$130.00
71Field Drill Holes in Existing Structural Steel (586.10)EACH731$65.00
72Bridge Railing Removal and Storage (587.02)LF577$39.50
73Installation of Stored Bridge Railing (587.03)LF577$150.00
74 (589.520001)EACH20$3,350.00
75 (589.520002)EACH21$3,600.00
76 (589.520003)EACH1$3,350.00
77 (589.520004)EACH4$3,350.00
78 (589.520005)EACH2$3,350.00
79 (589.520006)EACH5$3,350.00
80 (589.520007)EACH6$3,350.00
81 (589.520008)EACH131$2,500.00
82 (603.6003)LF54$430.00
83Concrete Collars (603.77)EACH1$5,250.00
84 (603.99050002)4$965.00
85 (604.13000011)4$2,450.00
86 (604.302192)LF18$1,000.00
87Single-Slope Concrete Median Barrier (Cast-in-Place) (606.3043)LF50$615.00
88 (607.61000005)120$80.00
89 (608.01030008)46$835.00
90Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON2$560.00
91Stone Curb – Bridge (Type A) (609.0301)LF80$205.00
92Stone Curb – Bridge (Type F1) (609.0302)LF48$270.00
93 (609.06000008)54$79.50
94Basic Work Zone Traffic Control (619.01)LS1$2,183,000
95Type III Construction Barricades (619.04)EACH4$62.00
96Cover Existing Pavement Marking Letters or Symbols (Removable Tape) (619.0804)EACH2$320.00
97 (619.100103)LF9,120$5.85
98 (619.100203)EACH2$320.00
99 (619.100303)EACH8$105.00
100 (619.111113)EACH2$45,700
101Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711)LF480$44.50
102Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715)LF4,080$63.50
103Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716)LF1,920$58.50
104Warning Lights on Temporary Positive Barriers (619.1719)EACH172$27.00
105Nighttime Operations (Entire Project) (619.24)LS1$35,200
106Survey Operations (625.01)LS1$36,500
107Concrete Cylinder Curing Equipment (637.04)EACH1$1,850.00
108Welded Frame & Reticuline Grate 22 (655.1122)EACH4$3,100.00
109 (655.16000011)4$950.00
110 (662.60000108)3,000$1.00
111 (665.98000103)LS1$16,400
112 (665.98000116)LS1$120,000
113 (670.35250025)266$32.00
114 (670.41091111)6$2,750.00
115 (680.520406)LF3,040$80.00
116 (680.53000111)10$2,850.00
117 (680.730310)LF3,040$9.05
118 (680.90920008)2$1,550.00
119Watertight Disconnect Box (680.9401)EACH2$1,550.00
120White Epoxy Reflectorized Pavement Stripes - 15 mil (685.0101)LF7,171$1.25
121Yellow Epoxy Reflectorized Pavement Stripes - 15 mil (685.0201)LF5,313$1.25
122 (685.06150106)1,462$3.80
123White Epoxy Reflectorized Pavement Letters - 15 mil Portable/Hand Application (685.2303)EACH12$80.00
124White Epoxy Reflectorized Pavement Symbols - 15 mil Portable/Hand Application (685.2403)EACH7$240.00
125Field Change Payment (FCP) (697.03)DOL700,000$1.00
126Asphalt Price Adjustment (698.04)DOL100$1.00
127Fuel Price Adjustment (698.05)DOL367$1.00
128Steel/Iron Price Adjustment (698.06)DOL100$1.00
129Mobilization (699.040001)LS1$550,000
NYSDOT contract D265662: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of February 26, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy