| 1 | Unclassified Excavation and Disposal (203.02) | CY | 1,063 | $96.08 |
| 2 | Embankment In Place (203.03) | CY | 195 | $177.87 |
| 3 | Select Granular Fill (203.07) | CY | 334 | $75.81 |
| 4 | (205.0201) | LS | 1 | $17,148 |
| 5 | Field Organic Vapor Monitoring of Contaminated Soil (205.03) | HR | 30 | $174.20 |
| 6 | Petroleum Contamination Parameter Analysis (205.0401) | EACH | 4 | $156.01 |
| 7 | Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic (205.0402) | EACH | 1 | $312.02 |
| 8 | Laboratory Analysis for Ignitability (205.0403) | EACH | 1 | $104.00 |
| 9 | Laboratory Analysis for ph (205.0404) | EACH | 1 | $34.67 |
| 10 | Laboratory Analysis for Total Petroleum Hydrocarbons– Gasoline Range Organics (205.0406) | EACH | 4 | $156.01 |
| 11 | Laboratory Analysis for Total Petroleum Hydrocarbons– Diesel Range Organics (205.0407) | EACH | 4 | $156.01 |
| 12 | (205.050201) | TON | 122 | $162.35 |
| 13 | Trench and Culvert Excavation (206.0201) | CY | 885 | $113.78 |
| 14 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 5 | $13.93 |
| 15 | Test Pit Excavation (206.05) | EACH | 5 | $3,382.46 |
| 16 | Geotextile Bedding (207.20) | SY | 45 | $13.89 |
| 17 | Geotextile Stabilization (207.24) | SY | 342 | $7.04 |
| 18 | Seed and Mulch – Temporary (209.1003) | SY | 624 | $5.02 |
| 19 | Turbidity Curtain – Temporary (209.1501) | LF | 40 | $85.03 |
| 20 | Sediment Filter Log, 12″ (209.2301) | LF | 184 | $29.83 |
| 21 | Subbase Course, Type 2 (304.12) | CY | 641 | $216.99 |
| 22 | (404.0001) | TON | 42 | $75.00 |
| 23 | (404.0983) | TON | 346 | $190.17 |
| 24 | (404.1989) | TON | 217 | $266.43 |
| 25 | (404.2589) | TON | 224 | $209.52 |
| 26 | Diluted Tack Coat (407.0102) | GAL | 302 | $4.07 |
| 27 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 1,611 | $1.59 |
| 28 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 3,315 | $6.76 |
| 29 | Shields and Shoring (552.17) | SF | 1,264 | $1.77 |
| 30 | (553.020001) | EACH | 1 | $13,079 |
| 31 | Concrete for Structures, Performance (555.0021) | CY | 2 | $5,195.74 |
| 32 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $17.50 |
| 33 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 76 | $20.91 |
| 34 | Removal of Structural Concrete (580.01) | CY | 6 | $1,107.72 |
| 35 | (603.98080007) | | 14 | $97.10 |
| 36 | (603.9815) | LF | 637 | $85.60 |
| 37 | (603.9818) | LF | 207 | $141.17 |
| 38 | (604.15010018) | | 1 | $2,787.61 |
| 39 | (604.300103) | LF | 5 | $1,095.36 |
| 40 | (604.300211) | LF | 8 | $848.11 |
| 41 | (604.300611) | LF | 5 | $1,318.81 |
| 42 | (604.302122) | LF | 51 | $1,028.93 |
| 43 | (605.03010015) | | 1,479 | $21.58 |
| 44 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 3 | $75.00 |
| 45 | Concrete Sidewalks and Driveways (608.0101) | CY | 55 | $1,226.70 |
| 46 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 64 | $374.68 |
| 47 | (608.21000003) | | 10 | $564.88 |
| 48 | (609.0401) | LF | 1,647 | $45.57 |
| 49 | Mycorrhizal Fungi (610.0701) | LB | 2 | $92.91 |
| 50 | Turf Establishment – Performance (610.1605) | SY | 624 | $21.66 |
| 51 | (611.0283) | EACH | 2 | $1,074.28 |
| 52 | (611.0443) | EACH | 5 | $229.95 |
| 53 | Pre-Existing Stump Removal up to 24” diameter at 6 inches above grade (614.0701) | EACH | 1 | $1,319.40 |
| 54 | Pre-Existing Stump Removal over 24” to 48” diameter at 6 inches above grade (614.0702) | EACH | 2 | $1,319.40 |
| 55 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $317,150 |
| 56 | Type III Construction Barricades (619.04) | EACH | 8 | $187.22 |
| 57 | (619.0901) | LF | 5,120 | $0.43 |
| 58 | (619.111112) | EACH | 2 | $7,635.82 |
| 59 | Mailboxes (619.27) | EACH | 6 | $697.71 |
| 60 | Stone Filling (Light) (620.03) | CY | 18 | $437.37 |
| 61 | Survey Operations (625.01) | LS | 1 | $81,783 |
| 62 | Concrete Right of Way Markers Type H (High) (625.03) | EACH | 1 | $2,136.69 |
| 63 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 7 | $213.42 |
| 64 | Permanent Survey Markers (625.06) | EACH | 2 | $485.04 |
| 65 | (625.09010015) | LS | 1 | $6,740.86 |
| 66 | (627.50140008) | | 1,628 | $11.24 |
| 67 | Field Laboratory (637.01) | EACH | 1 | $5,484.98 |
| 68 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $1,635.34 |
| 69 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 9 | $4,753.51 |
| 70 | Office Technology and Supplies (637.34) | DOL | 2,500 | $1.00 |
| 71 | (637.41000115) | | 18 | $380.43 |
| 72 | (637.41000215) | | 18 | $380.43 |
| 73 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 231 | $52.26 |
| 74 | Type A Sign Posts (645.81) | EACH | 39 | $330.99 |
| 75 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 3 | $174.20 |
| 76 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 26 | $46.46 |
| 77 | (647.83001002) | | 5 | $11.61 |
| 78 | Welded Frame & Rectangular Grate 3 (655.1003) | EACH | 1 | $2,713.05 |
| 79 | Welded Frame & Rectangular Grate 11 (655.1011) | EACH | 2 | $2,789.17 |
| 80 | Welded Frame & Rectangular Grate 22 (655.1022) | EACH | 10 | $3,116.23 |
| 81 | (662.60010004) | | 100 | $1.00 |
| 82 | Pole Excavation and Concrete Foundation (680.5001) | CY | 2.40 | $3,523.63 |
| 83 | (680.50500005) | | 6 | $404.16 |
| 84 | (680.510501) | EACH | 1 | $2,591.04 |
| 85 | (680.520506) | LF | 10 | $9.98 |
| 86 | (680.622048) | EACH | 1 | $24,410 |
| 87 | (680.730514) | LF | 544 | $4.59 |
| 88 | (680.79010008) | LS | 1 | $5,806.91 |
| 89 | (680.80620215) | | 1 | $6,772.01 |
| 90 | Install Ball/Arrow LED Traffic Signal Module (680.810308) | EACH | 8 | $7.68 |
| 91 | Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601) | EACH | 8 | $376.29 |
| 92 | (680.81230008) | | 8 | $390.23 |
| 93 | (680.81990007) | | 8 | $133.56 |
| 94 | (680.94000008) | | 1 | $4,974.20 |
| 95 | Ground Wire (680.9403) | LF | 20 | $2.67 |
| 96 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 1 | $341.45 |
| 97 | (680.950106) | LF | 111 | $3.58 |
| 98 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $12.50 |
| 99 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 3,345 | $3.43 |
| 100 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 1,672 | $1.38 |
| 101 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 16 | $87.11 |
| 102 | Field Change Payment (FCP) (697.03) | DOL | 82,000 | $1.00 |
| 103 | Asphalt Price Adjustment (698.04) | DOL | 765 | $1.00 |
| 104 | Fuel Price Adjustment (698.05) | DOL | 565 | $1.00 |
| 105 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 |
| 106 | Mobilization (699.040001) | LS | 1 | $74,100 |