Reale Construction Co Inc: NYSDOT bid record
Reale Construction Co Inc submitted 12 bids on New York State DOT contracts in the data, from 20 JAN 2022 to 27 AUG 2026, and was the low bidder on 5 of them (42%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $35,025,000
- Latest bid
- 27 AUG 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 5 | 3 | 60% |
| 2023 | 1 | 0 | 0% |
| 2024 | 4 | 1 | 25% |
| 2026 | 2 | 1 | 50% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 01 | 9 | 5 | 56% |
| Region 07 | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 6 | 6 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 6 | 6 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 5 | 5 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 5 | 5 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 5 | 5 (100%) | $1.00 | $1.00 |
| Unclassified Excavation and Disposal | 203.02 | CY | 6 | 3 (50%) | $45.00 | $71.00 |
| Embankment In Place | 203.03 | CY | 5 | 3 (60%) | $36.00 | $43.11 |
| Stone Filling (Light) | 620.03 | CY | 5 | 3 (60%) | $98.00 | $163.00 |
| Engineer’s Field Office – Type 2 | 637.12 | MONTH | 5 | 2 (40%) | $3,000.00 | $2,500.00 |
| Structure Excavation | 206.01 | CY | 6 | 1 (17%) | $40.00 | $38.00 |
| Epoxy-Coated Bar Reinforcement for Structures | 556.0202 | LB | 5 | 1 (20%) | $2.20 | $3.25 |
| Bedding Material, Type 1 | 620.0801 | CY | 5 | 1 (20%) | $90.00 | $120.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ing Civil Inc | 4 | 3 of 4 |
| Winn Construction Services Inc | 3 | 2 of 3 |
| Luck Brothers Inc | 3 | 2 of 3 |
| Kubricky Construction Corp | 2 | 1 of 2 |
| Vector Construction Corp | 2 | 1 of 2 |
| Harrison & Burrowes Bridge Constructors Inc | 2 | 0 of 2 |
| Slate Hill Constructors Inc | 2 | 1 of 2 |
| BP Excavation LLC | 1 | 1 of 1 |
| Rifenburg Contracting Corporation | 1 | 1 of 1 |
| James H Maloy Inc | 1 | 1 of 1 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 27 AUG 2026 | D265815 | Region 01 | Standby Where & When Highway, Region 1, SFY 26 | 1 of 1 | $6,060,000 | Low |
| 05 FEB 2026 | D265738 | Region 07 | STANDBY WHERE & WHEN HIGHWAY 2025 | 2 of 2 | $700,560 | +6.0% |
| 19 DEC 2024 | D265368 | Region 01 | I87 NB Exit 32 Ramp/Bridge Replacement over Spruce Mill | 3 of 5 | $4,852,000 | +3.0% |
| 26 SEP 2024 | D265305 | Region 01 | Route 9N over Styles Brook | 3 of 6 | $2,414,000 | +8.0% |
| 22 AUG 2024 | D265323 | Region 01 | Standby Where & When Highway, Region 1, SFY 24 | 1 of 2 | $7,454,000 | Low, 18% under the second |
| 08 FEB 2024 | D265208 | Region 07 | CARDIN RD OVER BEAVER CREEK CULVERT REPLACEMENT | 2 of 3 | $1,072,000 | +17% |
| 24 AUG 2023 | D265092 | Region 07 | STANDBY WHERE & WHEN HIGHWAY 2023 | 3 of 3 | $599,400 | +19% |
| 21 JUL 2022 | D264836 | Region 01 | Route 74 Culvert C120086, Route 74 over Eagle Lake Channel | 1 of 1 | $2,495,000 | Low |
| 07 JUL 2022 | D264756 | Region 01 | Bridge Preservation, Northern counties in NYSDOT Region-1 | 1 of 3 | $11,976,000 | Low, 5.0% under the second |
| 16 JUN 2022 | D264833 | Region 01 | Highway Where & When SFY 22 | 1 of 1 | $7,040,000 | Low |
| 20 JAN 2022 | D264644 | Region 01 | NYSDOT Region-1, Culvert Replacement Various Locations. | 5 of 5 | $4,200,000 | +16% |
| 20 JAN 2022 | D264710 | Region 01 | BRIDGE DECK REPLACEMENT: NY Route 20 over Schoharie Creek | 5 of 5 | $3,978,000 | +39% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.