NYSDOT contract D265299 bid tabulation
CULVERT RESILENCY PROJECT - Routes I-87, 374, 12F & 178. Let by New York State DOT on February 20, 2025, Clinton, Jefferson, Region 07. 3 bids received; low bid $1,933,378 by Vector Construction Corp.
- Owner
- New York State DOT
- Letting
- 20 FEB 2025
- Pay items
- 71
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Vector Construction Corp | $1,933,378 | Low |
| 2 | Luck Brothers Inc | $2,522,220 | +30% |
| 3 | Kubricky-Jointa Lime LLC | $2,744,467 | +42% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vector Construction Corp | 2. Luck Brothers Inc | 3. Kubricky-Jointa Lime LLC |
|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $47,500 | $32,490 | $29,700 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 133 | $30.00 | $75.65 | $39.00 |
| 3 | Embankment In Place (203.03) | CY | 69 | $64.00 | $95.50 | $64.50 |
| 4 | Select Granular Fill (203.07) | CY | 120 | $72.00 | $57.89 | $115.00 |
| 5 | (203.24010017) | 28 | $97.00 | $233.69 | $150.00 | |
| 6 | Structure Excavation (206.01) | CY | 2,471 | $34.00 | $20.27 | $41.50 |
| 7 | Trench and Culvert Excavation (206.0201) | CY | 157 | $50.00 | $40.48 | $56.50 |
| 8 | Seed and Mulch – Temporary (209.1003) | SY | 9,317 | $2.50 | $1.69 | $1.60 |
| 9 | Check Dam (Ditch Bottom Width 0.0 to 3′), Gravel Bag – Temporary (209.110201) | EACH | 1 | $540.00 | $839.86 | $2,450.00 |
| 10 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 1,103 | $7.25 | $8.04 | $9.30 |
| 11 | Stabilized Construction Access (209.22) | SY | 1,243 | $31.00 | $54.07 | $1.00 |
| 12 | Sediment Filter Log, 12″ (209.2301) | LF | 1,647 | $12.00 | $11.34 | $13.00 |
| 13 | (210.480201) | SF | 59 | $220.00 | $195.67 | $285.00 |
| 14 | Subbase Course, Type 2 (304.12) | CY | 113 | $81.00 | $99.22 | $115.00 |
| 15 | (404.0001) | TON | 10 | $75.00 | $75.00 | $75.00 |
| 16 | (404.0983) | TON | 66 | $190.00 | $391.72 | $240.00 |
| 17 | (404.1989) | TON | 41 | $190.00 | $538.09 | $235.00 |
| 18 | (404.2589) | TON | 75 | $190.00 | $354.47 | $235.00 |
| 19 | Diluted Tack Coat (407.0102) | GAL | 81 | $30.00 | $6.62 | $39.00 |
| 20 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 148 | $10.00 | $2.28 | $13.00 |
| 21 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 445 | $22.00 | $25.09 | $28.00 |
| 22 | (553.030001) | EACH | 1 | $20,000 | $27,923 | $30,300 |
| 23 | (553.030002) | EACH | 1 | $70,000 | $27,923 | $45,600 |
| 24 | (553.030003) | EACH | 1 | $15,000 | $27,923 | $16,500 |
| 25 | (553.030004) | EACH | 1 | $70,000 | $75,655 | $69,900 |
| 26 | Concrete for Structures, Performance (555.0021) | CY | 11.40 | $3,000.00 | $5,597.33 | $3,500.00 |
| 27 | (555.80020001) | 117 | $250.00 | $347.57 | $255.00 | |
| 28 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $12.50 | $12.50 | $12.50 |
| 29 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 1,442 | $4.00 | $6.80 | $6.45 |
| 30 | Stud Shear Connectors for Bridges (556.03) | EACH | 3,462 | $11.00 | $19.54 | $8.75 |
| 31 | Protective Sealing of New Structural Concrete (559.02) | SF | 252 | $1.25 | $2.72 | $3.15 |
| 32 | Protective Sealing of Existing Structural Concrete and Existing Bridge Decks (559.03) | SF | 1,763 | $0.75 | $2.02 | $1.90 |
| 33 | Removal of Structural Concrete (580.01) | CY | 11.40 | $2,500.00 | $4,512.49 | $2,075.00 |
| 34 | Removal and Replacement of Structural Concrete (582.0051) | CY | 3 | $11,300 | $12,526 | $15,250 |
| 35 | Removal of Structural Concrete- Replacement with Vertical and Overhead Patching Material (582.0061) | SF | 136 | $175.00 | $177.82 | $215.00 |
| 36 | (582.99) | 1 | $40.00 | $40.00 | $40.00 | |
| 37 | (582.99000016) | 156 | $20.00 | $42.90 | $73.00 | |
| 38 | (595.50000018) | 1,035 | $7.00 | $7.16 | $6.95 | |
| 39 | Structural Paving of Inverts with Portland Cement Concrete (602.2002) | SF | 4,758 | $91.00 | $67.71 | $86.50 |
| 40 | Box Beam Guide Railing (606.10) | LF | 240 | $110.00 | $89.97 | $93.50 |
| 41 | Resetting Box Beam Guide Railing (New Posts) (606.5348) | LF | 240 | $50.00 | $63.00 | $97.50 |
| 42 | Resetting Box Beam Guide Rail Turned-Down Terminal (606.5920) | EACH | 2 | $1,350.00 | $1,548.31 | $2,200.00 |
| 43 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 240 | $8.00 | $26.64 | $40.00 |
| 44 | Turf Establishment – Performance (610.1605) | SY | 9,317 | $3.25 | $17.72 | $22.50 |
| 45 | (613.04000001) | 97 | $110.00 | $238.94 | $120.00 | |
| 46 | (615.01010108) | 87 | $110.00 | $259.32 | $165.00 | |
| 47 | (615.82010108) | 7 | $525.00 | $1,704.69 | $8,150.00 | |
| 48 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $185,000 | $364,572 | $690,000 |
| 49 | Type III Construction Barricades (619.04) | EACH | 24 | $135.00 | $56.90 | $76.50 |
| 50 | (619.111111) | EACH | 2 | $2,500.00 | $5,933.95 | $2,200.00 |
| 51 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 288 | $28.00 | $47.87 | $90.00 |
| 52 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 4 | $110.00 | $27.80 | $36.50 |
| 53 | Stone Filling (Heavy) (620.05) | CY | 1,429 | $110.00 | $185.22 | $120.00 |
| 54 | Bedding Material, Type 1 (620.0801) | CY | 455 | $75.00 | $97.88 | $125.00 |
| 55 | (620.14020009) | 237 | $130.00 | $248.62 | $130.00 | |
| 56 | (621.51050003) | 1,668 | $8.00 | $6.61 | $11.50 | |
| 57 | Survey Operations (625.01) | LS | 1 | $32,000 | $51,764 | $37,400 |
| 58 | (625.09010015) | LS | 1 | $1,500.00 | $28,344 | $1.00 |
| 59 | (627.50140008) | 131 | $7.50 | $8.04 | $7.25 | |
| 60 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $1,500.00 | $3,650.37 | $700.00 |
| 61 | Engineer’s Field Office – Type 1 (637.11) | MONTH | 16 | $2,500.00 | $3,191.31 | $1,350.00 |
| 62 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 63 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 4 | $40.00 | $16.75 | $51.50 |
| 64 | Steel Post, 2.0 lb/ft (646.32) | EACH | 3 | $180.00 | $94.93 | $220.00 |
| 65 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 310 | $11.50 | $12.84 | $12.50 |
| 66 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 310 | $11.50 | $12.84 | $12.50 |
| 67 | Field Change Payment (FCP) (697.03) | DOL | 106,000 | $1.00 | $1.00 | $1.00 |
| 68 | Asphalt Price Adjustment (698.04) | DOL | 432 | $1.00 | $1.00 | $1.00 |
| 69 | Fuel Price Adjustment (698.05) | DOL | 557 | $1.00 | $1.00 | $1.00 |
| 70 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 71 | Mobilization (699.040001) | LS | 1 | $74,000 | $95,425 | $100,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of February 20, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.