NYSDOT contract D265657 bid tabulation
CULVERT RESILIENCY PROJECT - VARIOUS LOCATIONS. Let by New York State DOT on December 18, 2025, Clinton, Franklin, Jefferson, St. Lawrence, Region 07. 2 bids received; low bid $9,137,555 by Kubricky-Jointa Lime LLC.
- Owner
- New York State DOT
- Letting
- 18 DEC 2025
- Pay items
- 136
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Kubricky-Jointa Lime LLC | $9,137,555 | Low |
| 2 | Luck Brothers Inc | $12,601,601 | +38% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kubricky-Jointa Lime LLC | 2. Luck Brothers Inc |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $42,261 | $74,706 |
| 2 | (202.120001) | LS | 1 | $25,200 | $18,514 |
| 3 | Unclassified Excavation and Disposal (203.02) | CY | 5,475 | $24.50 | $55.86 |
| 4 | Embankment In Place (203.03) | CY | 11,456 | $23.00 | $89.96 |
| 5 | Select Granular Fill (203.07) | CY | 1,268 | $105.00 | $142.22 |
| 6 | Structure Excavation (206.01) | CY | 11,832 | $19.50 | $73.03 |
| 7 | Trench and Culvert Excavation (206.0201) | CY | 498 | $37.00 | $108.36 |
| 8 | Geotextile Bedding (207.20) | SY | 684 | $3.70 | $3.52 |
| 9 | Geotextile Drainage (207.22) | SY | 54 | $10.50 | $32.11 |
| 10 | Geotextile Stabilization (207.24) | SY | 1,719 | $0.95 | $3.14 |
| 11 | Prefabricated Composite Structural Drain (207.26) | SY | 648 | $16.00 | $26.81 |
| 12 | (208.01030022) | 29 | $345.00 | $154.74 | |
| 13 | Seed and Mulch – Temporary (209.1003) | SY | 7,344 | $2.10 | $2.02 |
| 14 | (209.11000001) | 6 | $87.50 | $1,551.39 | |
| 15 | Check Dam (Ditch Bottom Width 0.0 to 3′), Gravel Bag – Temporary (209.110201) | EACH | 4 | $260.00 | $915.55 |
| 16 | Check Dam (Ditch Bottom Width >3′ to 6′), Gravel Bag – Temporary (209.110202) | EACH | 5 | $520.00 | $1,111.34 |
| 17 | Check Dam, (Ditch Bottom Width 0.0 to 3′), Stone – Permanent (209.110601) | EACH | 2 | $830.00 | $1,527.76 |
| 18 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 2,685 | $7.60 | $8.27 |
| 19 | Stabilized Construction Access (209.22) | SY | 800 | $25.00 | $43.33 |
| 20 | Sediment Filter Log, 12″ (209.2301) | LF | 4,182 | $10.50 | $9.58 |
| 21 | Subbase Course, Type 1 (304.11) | CY | 18 | $31.00 | $351.64 |
| 22 | Subbase Course, Type 2 (304.12) | CY | 3,850 | $80.50 | $101.82 |
| 23 | (404.0001) | TON | 215 | $90.00 | $90.00 |
| 24 | (404.0983) | TON | 1,133 | $175.00 | $168.05 |
| 25 | (404.1989) | TON | 1,301 | $140.00 | $161.06 |
| 26 | (404.2589) | TON | 1,836 | $125.00 | $144.20 |
| 27 | (404.4289) | TON | 296 | $175.00 | $199.96 |
| 28 | (404.4389) | TON | 444 | $145.00 | $157.53 |
| 29 | Diluted Tack Coat (407.0102) | GAL | 1,607 | $4.00 | $5.54 |
| 30 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 2,675 | $4.35 | $1.16 |
| 31 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 4,182 | $11.50 | $18.68 |
| 32 | Temporary Steel Sheeting (552.13) | SF | 7,300 | $45.00 | $56.21 |
| 33 | (552.2001) | LF | 234 | $205.00 | $280.05 |
| 34 | (552.2101) | LF | 48 | $1,050.00 | $2,462.85 |
| 35 | (552.2201) | LF | 391 | $585.00 | $699.72 |
| 36 | (552.230201) | SF | 1,234 | $40.00 | $35.49 |
| 37 | (553.020001) | EACH | 1 | $13,800 | $343,661 |
| 38 | (553.020002) | EACH | 1 | $13,800 | $320,455 |
| 39 | (553.030001) | EACH | 1 | $28,600 | $145,511 |
| 40 | (553.030002) | EACH | 1 | $29,700 | $134,789 |
| 41 | (553.030003) | EACH | 1 | $56,100 | $132,541 |
| 42 | (553.030004) | EACH | 1 | $60,900 | $118,801 |
| 43 | (554.3001) | SF | 436 | $69.50 | $46.58 |
| 44 | Footing Concrete, Performance (555.0011) | CY | 79.50 | $1,100.00 | $1,174.84 |
| 45 | Concrete for Structures, Performance (555.0021) | CY | 44 | $1,950.00 | $2,264.63 |
| 46 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $6.50 | $6.50 |
| 47 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $13.50 | $13.50 |
| 48 | Uncoated Bar Reinforcement for Concrete Structures (556.0201) | LB | 3,548 | $4.15 | $13.10 |
| 49 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 5,121 | $3.40 | $13.59 |
| 50 | Protective Sealing of New Structural Concrete (559.02) | SF | 919 | $2.25 | $1.02 |
| 51 | (562.0101) | SY | 79 | $2,000.00 | $2,120.84 |
| 52 | Performance Concrete Quality Adjustment (562.99) | QUALITY UNIT | 1 | $20.00 | $20.00 |
| 53 | Steel Bridge Railing (Three-Rail) (568.54) | LF | 89 | $265.00 | $253.70 |
| 54 | Transition Bridge Railing (568.70) | LF | 256 | $195.00 | $189.49 |
| 55 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 30 | $75.00 | $343.80 |
| 56 | (595.50000018) | 10,348 | $4.60 | $3.28 | |
| 57 | (603.171316) | EACH | 4 | $1,150.00 | $960.40 |
| 58 | (603.171614) | EACH | 4 | $1,900.00 | $1,237.60 |
| 59 | (603.64080815) | 78 | $2,300.00 | $2,705.00 | |
| 60 | (603.64160815) | 170.50 | $3,150.00 | $3,917.34 | |
| 61 | (603.67000001) | 234 | $2,800.00 | $3,005.53 | |
| 62 | (603.9818) | LF | 68 | $115.00 | $117.58 |
| 63 | (603.9824) | LF | 165 | $88.00 | $98.37 |
| 64 | Underdrain Filter, Type I (605.0901) | CY | 10 | $63.00 | $216.03 |
| 65 | (605.1502) | LF | 121 | $18.00 | $39.92 |
| 66 | Box Beam Guide Railing (606.10) | LF | 2,808 | $52.00 | $50.31 |
| 67 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 102 | $63.50 | $61.31 |
| 68 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 9 | $4,700.00 | $4,529.89 |
| 69 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 9 | $2,450.00 | $2,383.17 |
| 70 | Removing and Storing Box Beam Guide Railing (606.63) | LF | 1,208 | $5.15 | $4.99 |
| 71 | Removing and Storing Box Beam Guide Railing End Assembly (606.6920) | EACH | 10 | $170.00 | $166.19 |
| 72 | Removing and Disposing Cable Guide Railing (606.70) | LF | 1,885 | $2.30 | $2.22 |
| 73 | Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79) | EACH | 7 | $575.00 | $553.93 |
| 74 | (607.41010010) | 500 | $6.70 | $6.09 | |
| 75 | (607.96000008) | 48 | $26.00 | $34.67 | |
| 76 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 4 | $90.00 | $90.00 |
| 77 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 81 | $350.00 | $412.12 |
| 78 | Stone Curb – Bridge (Type A) (609.0301) | LF | 69 | $290.00 | $415.05 |
| 79 | Optional Curb (Precast Concrete Type PT4 or Cast-In-Place Concrete Type T4) (609.0903) | LF | 450 | $265.00 | $138.36 |
| 80 | Mycorrhizal Fungi (610.0701) | LB | 2 | $57.50 | $55.40 |
| 81 | Turf Establishment – Performance (610.1605) | SY | 7,344 | $17.00 | $12.59 |
| 82 | (611.0132) | EACH | 1 | $1,050.00 | $997.09 |
| 83 | (611.0272) | EACH | 1 | $915.00 | $886.30 |
| 84 | (611.0452) | EACH | 3 | $140.00 | $132.95 |
| 85 | (613.04000001) | 77 | $205.00 | $276.58 | |
| 86 | (615.01010108) | 263 | $170.00 | $254.22 | |
| 87 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $1,185,000 | $1,224,547 |
| 88 | Type III Construction Barricades (619.04) | EACH | 54 | $155.00 | $169.86 |
| 89 | (619.080101) | LF | 25,209 | $1.15 | $1.11 |
| 90 | (619.080102) | LF | 19,705 | $1.15 | $1.11 |
| 91 | (619.100101) | LF | 24,879 | $1.15 | $1.11 |
| 92 | (619.111112) | EACH | 8 | $4,350.00 | $9,726.14 |
| 93 | (619.130101) | EACH | 1 | $70,600 | $99,238 |
| 94 | (619.130201) | EACH | 1 | $10,100 | $36,517 |
| 95 | (619.130202) | EACH | 1 | $13,400 | $46,012 |
| 96 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 890 | $45.50 | $22.65 |
| 97 | Temporary Positive Barrier – Category 3 (Pinning Prohibited) (619.1713) | LF | 560 | $18.00 | $32.04 |
| 98 | Temporary Positive Barrier – Category 4 (Pinning Permitted) (619.1714) | LF | 521 | $56.00 | $41.16 |
| 99 | Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715) | LF | 695 | $37.00 | $30.95 |
| 100 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 1,390 | $55.50 | $30.95 |
| 101 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 156 | $27.50 | $71.53 |
| 102 | Temporary Impact Attenuator - Redirective (Test Level 2) (619.1802) | EACH | 9 | $7,350.00 | $6,759.68 |
| 103 | Temporary Rumble Strips (619.22) | LF | 1,728 | $9.95 | $16.68 |
| 104 | Stone Filling (Light) (620.03) | CY | 33 | $315.00 | $174.58 |
| 105 | Stone Filling (Medium) (620.04) | CY | 1,376 | $140.00 | $113.50 |
| 106 | Bedding Material, Type 1 (620.0801) | CY | 426 | $105.00 | $109.08 |
| 107 | Bedding Material, Type 2 (620.0802) | CY | 62 | $105.00 | $122.29 |
| 108 | (621.05020004) | 1,010 | $13.50 | $11.41 | |
| 109 | Crushed Stone (In-Place Measure) (623.12) | CY | 186 | $180.00 | $332.26 |
| 110 | Survey Operations (625.01) | LS | 1 | $225,000 | $122,098 |
| 111 | Concrete Right of Way Markers Type H (High) (625.03) | EACH | 26 | $1,600.00 | $1,756.62 |
| 112 | (625.110001) | EACH | 1 | $23,500 | $75,266 |
| 113 | (627.50140008) | 2,986 | $6.05 | $7.65 | |
| 114 | Field Laboratory (637.01) | EACH | 2 | $25,400 | $3,161.05 |
| 115 | Concrete Cylinder Curing Equipment (637.04) | EACH | 4 | $145.00 | $1,531.17 |
| 116 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 48 | $2,200.00 | $2,976.93 |
| 117 | Rain Gauge (637.26) | EACH | 1 | $185.00 | $167.04 |
| 118 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 |
| 119 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 |
| 120 | (637.41000115) | 24 | $140.00 | $321.59 | |
| 121 | (637.41000215) | 24 | $140.00 | $321.59 | |
| 122 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 41 | $47.00 | $45.42 |
| 123 | Type A Sign Posts (645.81) | EACH | 6 | $230.00 | $221.57 |
| 124 | Reference Marker Panel (646.21) | EACH | 4 | $32.00 | $31.02 |
| 125 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 36 | $18.50 | $17.73 |
| 126 | Steel Post, 2.0 lb/ft (646.32) | EACH | 30 | $74.50 | $72.01 |
| 127 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 10,100 | $2.85 | $2.77 |
| 128 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 10,647 | $2.85 | $2.77 |
| 129 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 8 | $86.00 | $83.09 |
| 130 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 3 | $285.00 | $276.97 |
| 131 | (691.04000020) | 63,700 | $1.00 | $1.00 | |
| 132 | Field Change Payment (FCP) (697.03) | DOL | 671,000 | $1.00 | $1.00 |
| 133 | Asphalt Price Adjustment (698.04) | DOL | 6,485 | $1.00 | $1.00 |
| 134 | Fuel Price Adjustment (698.05) | DOL | 3,240 | $1.00 | $1.00 |
| 135 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 136 | Mobilization (699.040001) | LS | 1 | $345,000 | $390,121 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of December 18, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.