| 1 | Clearing and Grubbing (201.06) | LS | 1 | $9,650.00 | $2,849.81 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 237 | $48.35 | $88.14 |
| 3 | (203.24010017) | | 1,671 | $100.25 | $63.13 |
| 4 | Subbase Course, Type 2 (304.12) | CY | 165 | $172.00 | $180.60 |
| 5 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 3,249 | $95.00 | $95.00 |
| 6 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 3,249 | $95.00 | $95.00 |
| 7 | (404.0589) | TON | 11 | $1,215.00 | $1,074.88 |
| 8 | (404.0682) | TON | 4,280 | $97.60 | $104.60 |
| 9 | (404.0683) | TON | 4,255 | $101.00 | $108.01 |
| 10 | (404.0962) | TON | 15,612 | $105.50 | $102.35 |
| 11 | (404.0963) | TON | 11,176 | $102.75 | $114.25 |
| 12 | (404.1262) | TON | 6,890 | $98.00 | $95.62 |
| 13 | (404.1263) | TON | 6,074 | $98.00 | $89.72 |
| 14 | (404.1282) | TON | 419 | $120.00 | $123.04 |
| 15 | (406.0962) | TON | 5,226 | $116.00 | $104.67 |
| 16 | (406.1263) | TON | 10,765 | $99.25 | $100.85 |
| 17 | Straight Tack Coat (407.0103) | GAL | 43,048 | $2.40 | $3.74 |
| 18 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 219,453 | $0.53 | $0.53 |
| 19 | Production Cold-Mill Surface Planing of Bituminous Concrete (490.15) | SY | 425,512 | $2.05 | $1.80 |
| 20 | (490.17011018) | | 119,977 | $1.00 | $1.41 |
| 21 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 7,357 | $21.50 | $26.65 |
| 22 | Miscellaneous Cold Milling of Portland Cement Concrete (490.40) | SY | 28,287 | $1.90 | $2.27 |
| 23 | (604.070101) | EACH | 34 | $2,400.00 | $1,240.76 |
| 24 | Box Beam Guide Railing (606.10) | LF | 7,971 | $52.00 | $56.44 |
| 25 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 4 | $4,915.00 | $5,334.45 |
| 26 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 15 | $2,430.00 | $2,637.38 |
| 27 | Box Beam End Assembly Type III (606.1203) | EACH | 14 | $8,100.00 | $8,791.25 |
| 28 | Resetting Box Beam Guide Railing (606.53) | LF | 526 | $31.50 | $34.19 |
| 29 | Removing and Disposing Cable Guide Railing (606.70) | LF | 6,502 | $1.75 | $1.90 |
| 30 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 124 | $5.00 | $5.43 |
| 31 | Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79) | EACH | 32 | $650.00 | $705.47 |
| 32 | (608.01060415) | | 100 | $128.50 | $79.05 |
| 33 | (608.01070415) | | 4,824 | $102.75 | $81.55 |
| 34 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 257 | $410.00 | $351.83 |
| 35 | (608.21000003) | | 18 | $450.00 | $358.97 |
| 36 | Topsoil - Lawns (610.1403) | CY | 25 | $427.50 | $351.96 |
| 37 | Turf Establishment -Lawns (610.1602) | SY | 230 | $10.00 | $67.38 |
| 38 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $1,390,000 | $1,917,414 |
| 39 | Type III Construction Barricades (619.04) | EACH | 308 | $78.50 | $10.75 |
| 40 | (619.0901) | LF | 460,038 | $0.27 | $0.30 |
| 41 | (619.111213) | WEEK | 448 | $460.00 | $167.65 |
| 42 | Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613) | MONTH | 21 | $200.00 | $217.07 |
| 43 | Interim Tubular Markers (619.20) | EACH | 616 | $21.00 | $0.42 |
| 44 | (619.2401) | LS | 1 | $46,500 | $81,921 |
| 45 | (619.2402) | LS | 1 | $95,750 | $172,109 |
| 46 | (619.2403) | LS | 1 | $66,000 | $72,684 |
| 47 | (619.2404) | LS | 1 | $38,500 | $69,033 |
| 48 | Pavement Patching (Force Acount) (619.2601) | DOL | 90,000 | $1.00 | $1.00 |
| 49 | Cleaning Culverts with Span of 50 in. or Less (621.01) | LF | 52 | $25.00 | $27.13 |
| 50 | Cleaning Closed Drainage Systems (621.03) | LF | 2,003 | $12.00 | $13.02 |
| 51 | Cleaning Drainage Structures (621.04) | EACH | 121 | $500.00 | $542.67 |
| 52 | Clean, Grade and Shape Existing Roadside Section (621.05) | LF | 3,787 | $4.90 | $6.51 |
| 53 | (621.51000015) | | 13,134 | $3.95 | $4.91 |
| 54 | Asphalt Gutter (624.020101) | TON | 101 | $212.00 | $337.52 |
| 55 | Survey Operations (625.01) | LS | 1 | $60,000 | $21,159 |
| 56 | (627.50140008) | | 432 | $33.35 | $23.89 |
| 57 | Removal and Repair of Deteriorated Asphalt Pavement - Less than or equal to 4 Square Yards (633.1401) | SY | 945 | $60.00 | $58.15 |
| 58 | Removal and Repair of Deteriorated Asphalt Pavement – Greater than 4 Square Yards and less than 20 Square Yards (633.1402) | SY | 1,626 | $50.00 | $58.94 |
| 59 | Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403) | SY | 1,207 | $50.00 | $57.18 |
| 60 | Removal and Repair of Loose, Broken, or Spalled PCC Pavement (633.15) | SY | 70 | $130.00 | $63.20 |
| 61 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 18 | $2,350.00 | $3,183.83 |
| 62 | Office Technology and Supplies (637.34) | DOL | 1,000 | $1.00 | $1.00 |
| 63 | Construction Testing supplies – Consumables (637.36) | DOL | 90 | $1.00 | $1.00 |
| 64 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 54 | $51.50 | $55.89 |
| 65 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 74 | $46.50 | $50.47 |
| 66 | Type A Sign Posts (645.81) | EACH | 33 | $225.00 | $244.20 |
| 67 | Reference Marker Panel (646.21) | EACH | 68 | $48.00 | $52.10 |
| 68 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 71 | $28.75 | $31.20 |
| 69 | Steel Post, 2.0 lb/ft (646.32) | EACH | 124 | $95.00 | $103.11 |
| 70 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 2 | $45.00 | $48.84 |
| 71 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 30 | $55.00 | $59.69 |
| 72 | (647.83001002) | | 31 | $9.50 | $10.31 |
| 73 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 57,030 | $0.45 | $0.79 |
| 74 | Pavement Ride Quality Adjustment to Asphalt Level 2 (653.1020) | QUALITY UNIT | 3,133 | $95.00 | $95.00 |
| 75 | Parallel Bar Frame 12 PCB & Parallel Bar Grate 12 PCB (655.0903) | EACH | 1 | $2,000.00 | $2,730.54 |
| 76 | Adjust Existing Valve Box Elevation (663.33) | EACH | 29 | $465.00 | $43.41 |
| 77 | (680.05010007) | | 13 | $28,692 | $31,141 |
| 78 | (680.05020007) | | 13 | $3,626.00 | $3,935.44 |
| 79 | (680.80324515) | | 9 | $2,528.00 | $2,743.74 |
| 80 | (680.82250601) | | 8 | $435.00 | $472.12 |
| 81 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 9 | $622.00 | $675.08 |
| 82 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 206,897 | $0.39 | $0.44 |
| 83 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 253,637 | $0.39 | $0.44 |
| 84 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 21,863 | $2.90 | $3.28 |
| 85 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 192 | $75.00 | $84.77 |
| 86 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 237 | $225.00 | $254.31 |
| 87 | (691.04000020) | | 64,150 | $1.00 | $1.00 |
| 88 | Field Change Payment (FCP) (697.03) | DOL | 648,000 | $1.00 | $1.00 |
| 89 | Asphalt Price Adjustment (698.04) | DOL | 62,600 | $1.00 | $1.00 |
| 90 | Fuel Price Adjustment (698.05) | DOL | 27,700 | $1.00 | $1.00 |
| 91 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 92 | Mobilization (699.040001) | LS | 1 | $400,000 | $600,150 |