NYSDOT contract D265568 bid tabulation
CULVERT RESILIENCY OF STATE SYSTEM - REHABILITATION WITH ROW. Let by New York State DOT on December 18, 2025, Clinton, Jefferson, St. Lawrence, Region 07. 3 bids received; low bid $2,492,000 by Barrett Paving Materials Inc.
- Owner
- New York State DOT
- Letting
- 18 DEC 2025
- Pay items
- 55
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Barrett Paving Materials Inc | $2,492,000 | Low |
| 2 | Kubricky-Jointa Lime LLC | $3,625,269 | +45% |
| 3 | Slate Hill Constructors Inc | $3,675,747 | +48% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Barrett Paving Materials Inc | 2. Kubricky-Jointa Lime LLC | 3. Slate Hill Constructors Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $13,000 | $51,000 | $310,000 |
| 2 | (203.24010017) | 170 | $115.60 | $235.00 | $90.00 | |
| 3 | Structure Excavation (206.01) | CY | 692 | $37.70 | $51.00 | $85.00 |
| 4 | Trench and Culvert Excavation (206.0201) | CY | 163 | $63.00 | $72.00 | $120.00 |
| 5 | Seed and Mulch – Temporary (209.1003) | SY | 16,442 | $0.75 | $1.05 | $1.20 |
| 6 | Check Dam (Ditch Bottom Width 0.0 to 3′), Gravel Bag – Temporary (209.110201) | EACH | 4 | $169.00 | $290.00 | $550.00 |
| 7 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 4,642 | $5.20 | $5.75 | $6.50 |
| 8 | Stabilized Construction Access (209.22) | SY | 1,064 | $9.00 | $33.50 | $38.00 |
| 9 | Sediment Filter Log, 12″ (209.2301) | LF | 5,904 | $6.65 | $11.50 | $10.00 |
| 10 | (553.030001) | EACH | 1 | $35,500 | $59,400 | $1.00 |
| 11 | (553.030002) | EACH | 1 | $36,500 | $60,900 | $1.00 |
| 12 | (553.030003) | EACH | 1 | $51,000 | $126,000 | $1.00 |
| 13 | (553.030004) | EACH | 1 | $36,000 | $58,900 | $1.00 |
| 14 | Stud Shear Connectors for Bridges (556.03) | EACH | 3,100 | $8.30 | $10.50 | $6.00 |
| 15 | Structural Paving of Inverts with Portland Cement Concrete (602.2002) | SF | 1,471 | $39.50 | $49.00 | $72.00 |
| 16 | (602.2654) | LF | 165 | $960.00 | $2,450.00 | $1,150.00 |
| 17 | (602.27010807) | 162 | $2,170.00 | $1,450.00 | $2,200.00 | |
| 18 | (602.90100807) | 104 | $3,340.00 | $4,550.00 | $3,800.00 | |
| 19 | Box Beam Guide Railing (606.10) | LF | 4,254 | $58.50 | $47.50 | $50.00 |
| 20 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 10 | $5,400.00 | $4,400.00 | $4,500.00 |
| 21 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 4 | $2,860.00 | $2,300.00 | $2,400.00 |
| 22 | Resetting Box Beam Guide Railing (New Posts) (606.5348) | LF | 300 | $52.00 | $72.50 | $42.00 |
| 23 | Resetting Box Beam Guide Rail Turned-Down Terminal (606.5920) | EACH | 2 | $585.00 | $1,400.00 | $500.00 |
| 24 | Removing and Disposing Cable Guide Railing (606.70) | LF | 4,263 | $5.50 | $12.50 | $7.00 |
| 25 | Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79) | EACH | 12 | $500.00 | $730.00 | $900.00 |
| 26 | Mycorrhizal Fungi (610.0701) | LB | 43 | $5.00 | $31.50 | $80.00 |
| 27 | Turf Establishment – Performance (610.1605) | SY | 16,442 | $3.50 | $2.65 | $10.00 |
| 28 | (611.0121) | EACH | 18 | $550.00 | $265.00 | $800.00 |
| 29 | (611.0323) | EACH | 25 | $300.00 | $125.00 | $220.00 |
| 30 | (611.0331) | EACH | 11 | $390.00 | $210.00 | $300.00 |
| 31 | (611.0333) | EACH | 11 | $390.00 | $210.00 | $300.00 |
| 32 | (611.0341) | EACH | 38 | $400.00 | $315.00 | $400.00 |
| 33 | (613.04000001) | 25 | $126.00 | $170.00 | $160.00 | |
| 34 | (615.01010108) | 33 | $72.00 | $130.00 | $185.00 | |
| 35 | (615.82010108) | 6 | $2,700.00 | $2,150.00 | $3,500.00 | |
| 36 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $92,883 | $735,000 | $850,000 |
| 37 | Stone Filling (Heavy) (620.05) | CY | 647 | $182.00 | $175.00 | $170.00 |
| 38 | Bedding Material, Type 1 (620.0801) | CY | 180 | $173.40 | $180.00 | $155.00 |
| 39 | (620.29020008) | 124 | $141.50 | $185.00 | $250.00 | |
| 40 | (621.51050003) | 4,735 | $8.50 | $4.00 | $5.00 | |
| 41 | Survey Operations (625.01) | LS | 1 | $30,000 | $51,000 | $25,000 |
| 42 | Concrete Right of Way Markers Type H (High) (625.03) | EACH | 2 | $790.00 | $1,550.00 | $2,300.00 |
| 43 | Concrete Cylinder Curing Equipment (637.04) | EACH | 4 | $900.00 | $550.00 | $200.00 |
| 44 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 23 | $4,200.00 | $1,925.00 | $2,800.00 |
| 45 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 | $1.00 |
| 46 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 47 | (637.41000115) | 23 | $175.00 | $48.00 | $140.00 | |
| 48 | (637.41000215) | 23 | $175.00 | $48.00 | $140.00 | |
| 49 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 34 | $40.00 | $31.50 | $35.00 |
| 50 | Steel Post, 2.0 lb/ft (646.32) | EACH | 27 | $91.00 | $73.50 | $75.00 |
| 51 | Field Change Payment (FCP) (697.03) | DOL | 220,000 | $1.00 | $1.00 | $1.00 |
| 52 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 53 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 54 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 55 | Mobilization (699.040001) | LS | 1 | $87,000 | $130,000 | $120,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of December 18, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.