NYSDOT contract D265456 bid tabulation
PAVEMENT RESURFACING - Various Locations. Let by New York State DOT on March 27, 2025, Albany, Greene, Rensselaer, Schenectady, Region 01. 3 bids received; low bid $12,622,705 by Callanan Industries Inc.
- Owner
- New York State DOT
- Letting
- 27 MAR 2025
- Pay items
- 109
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Callanan Industries Inc | $12,622,705 | Low |
| 2 | Rifenburg Construction Inc | $13,521,115 | +7.0% |
| 3 | Peckham Road Corp | $14,259,848 | +13% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Callanan Industries Inc | 2. Rifenburg Construction Inc | 3. Peckham Road Corp |
|---|---|---|---|---|---|---|
| 1 | (201.07010004) | 13 | $200.00 | $1,175.00 | $483.26 | |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 540 | $100.00 | $117.00 | $144.80 |
| 3 | (203.24010017) | 430 | $80.30 | $62.50 | $43.50 | |
| 4 | (206.03030008) | 10 | $180.00 | $186.00 | $180.00 | |
| 5 | Test Pit Excavation (206.05) | EACH | 16 | $600.00 | $1,100.00 | $1,550.00 |
| 6 | Subbase Course, Type 2 (304.12) | CY | 351 | $175.00 | $203.00 | $174.65 |
| 7 | (404.0001) | TON | 2,212 | $85.00 | $85.00 | $85.00 |
| 8 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 4 | $85.00 | $85.00 | $85.00 |
| 9 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 604 | $85.00 | $85.00 | $85.00 |
| 10 | (404.0589) | TON | 4,990 | $98.00 | $117.00 | $103.50 |
| 11 | (404.0683) | TON | 5,750 | $91.00 | $107.00 | $110.70 |
| 12 | (404.0962) | TON | 6,680 | $102.00 | $110.00 | $117.95 |
| 13 | (404.0963) | TON | 6,360 | $101.00 | $112.50 | $115.85 |
| 14 | (404.0972) | TON | 5,660 | $93.00 | $112.00 | $112.50 |
| 15 | (404.1263) | TON | 6,740 | $85.00 | $97.00 | $98.60 |
| 16 | (406.0972) | TON | 6,650 | $102.00 | $116.50 | $122.75 |
| 17 | (406.0982) | TON | 690 | $109.00 | $131.50 | $129.75 |
| 18 | (406.1262) | TON | 5,690 | $89.00 | $109.00 | $114.50 |
| 19 | Straight Tack Coat (407.0103) | GAL | 33,110 | $5.37 | $3.00 | $3.25 |
| 20 | (416.10000018) | 71,410 | $7.70 | $7.90 | $7.70 | |
| 22 | (416.22000018) | 103,550 | $0.20 | $0.20 | $0.20 | |
| 23 | (416.30000018) | 7,150 | $2.20 | $2.20 | $2.20 | |
| 24 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 183,360 | $0.60 | $0.60 | $0.67 |
| 25 | Production Cold-Mill Surface Planing of Bituminous Concrete (490.15) | SY | 279,290 | $1.90 | $2.30 | $2.50 |
| 26 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 4,370 | $10.27 | $7.50 | $14.60 |
| 27 | (520.09000010) | 1,113 | $3.19 | $7.00 | $11.45 | |
| 28 | (604.070101) | EACH | 18 | $2,500.00 | $2,050.00 | $1,965.00 |
| 29 | (604.070102) | EACH | 12 | $3,000.00 | $2,500.00 | $4,415.00 |
| 30 | Box Beam Guide Railing (606.10) | LF | 1,710 | $52.50 | $52.50 | $52.50 |
| 31 | Box Beam End Piece (606.120101) | EACH | 4 | $905.00 | $905.00 | $905.00 |
| 32 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 12 | $2,550.00 | $2,550.00 | $2,550.00 |
| 33 | Resetting Corrugated Beam Guide Railing (606.51) | LF | 630 | $20.00 | $20.00 | $20.00 |
| 34 | Resetting Box Beam Guide Railing (606.53) | LF | 4,570 | $25.00 | $25.00 | $25.00 |
| 35 | Resetting Anchorage Units for Corrugated Beam Guide Railing or Median Barrier (606.5910) | EACH | 4 | $2,000.00 | $2,000.00 | $2,000.00 |
| 36 | Resetting Box Beam Guide Rail Turned-Down Terminal (606.5920) | EACH | 18 | $655.00 | $655.00 | $655.00 |
| 37 | Removing and Disposing Cable Guide Railing (606.70) | LF | 1,570 | $2.50 | $2.50 | $2.50 |
| 38 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 60 | $4.00 | $4.00 | $4.00 |
| 39 | Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79) | EACH | 14 | $500.00 | $500.00 | $500.00 |
| 40 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 2 | $115.00 | $115.00 | $115.00 |
| 41 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 20 | $85.00 | $85.00 | $85.00 |
| 42 | Concrete Sidewalks and Driveways (608.0101) | CY | 16 | $2,500.00 | $2,475.00 | $1,715.00 |
| 43 | (608.01060415) | 675 | $75.00 | $38.00 | $78.25 | |
| 44 | (608.01070415) | 14,642 | $55.00 | $54.25 | $58.25 | |
| 45 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 413 | $250.00 | $258.00 | $255.00 |
| 46 | (608.21000003) | 99 | $465.34 | $501.00 | $246.00 | |
| 47 | (608.94010007) | 6,147 | $48.30 | $48.30 | $48.30 | |
| 48 | Topsoil - Lawns (610.1403) | CY | 4 | $698.98 | $176.00 | $540.00 |
| 49 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $1,305,000 | $1,196,083 | $1,431,830 |
| 50 | Type III Construction Barricades (619.04) | EACH | 221 | $50.00 | $56.50 | $47.00 |
| 51 | (619.0901) | LF | 898,440 | $0.24 | $0.25 | $0.25 |
| 52 | (619.111213) | WEEK | 218 | $500.00 | $500.00 | $420.00 |
| 53 | Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613) | MONTH | 11 | $50.00 | $50.00 | $50.00 |
| 54 | Interim Tubular Markers (619.20) | EACH | 434 | $25.00 | $13.00 | $42.00 |
| 55 | (619.2401) | LS | 1 | $47,500 | $77,000 | $88,550 |
| 56 | (619.2402) | LS | 1 | $27,500 | $47,150 | $76,000 |
| 57 | (619.2403) | LS | 1 | $27,500 | $54,700 | $201,000 |
| 58 | (619.2404) | LS | 1 | $27,500 | $89,400 | $86,850 |
| 59 | (619.2405) | LS | 1 | $15,000 | $7,000.00 | $55,650 |
| 60 | Pavement Patching (Force Acount) (619.2601) | DOL | 10,000 | $1.00 | $1.00 | $1.00 |
| 61 | Mailboxes (619.27) | EACH | 1 | $1,500.00 | $500.00 | $455.00 |
| 62 | Cleaning Culverts with Span of 50 in. or Less (621.01) | LF | 2,530 | $16.00 | $20.00 | $16.00 |
| 63 | Cleaning Drainage Structures (621.04) | EACH | 36 | $600.00 | $600.00 | $600.00 |
| 64 | (621.51000015) | 11,160 | $4.25 | $4.75 | $4.80 | |
| 65 | (621.51950006) | 3,390 | $1.21 | $4.00 | $1.20 | |
| 66 | Crushed Stone (By Weight) (623.03) | TON | 3,000 | $10.00 | $10.00 | $10.00 |
| 67 | (624.0109) | SF | 160 | $102.06 | $53.00 | $48.00 |
| 68 | Asphalt Gutter (624.020101) | TON | 83 | $293.62 | $206.00 | $297.50 |
| 69 | Plant Production Quality Adjustment to 624.020101 (624.020110) | QUALITY UNIT | 5 | $85.00 | $85.00 | $85.00 |
| 70 | Survey Operations (625.01) | LS | 1 | $25,000 | $45,000 | $30,150 |
| 71 | (625.09010015) | LS | 1 | $2,500.00 | $10,000 | $5,500.00 |
| 72 | (627.50140008) | 1,620 | $3.65 | $3.50 | $5.50 | |
| 73 | Cleaning Existing Pavement and/or Shoulder (633.11) | SY | 168,588 | $0.05 | $0.10 | $0.11 |
| 74 | Removal and Repair of Deteriorated Asphalt Pavement - Less than or equal to 4 Square Yards (633.1401) | SY | 552 | $102.73 | $106.00 | $193.50 |
| 75 | Removal and Repair of Deteriorated Asphalt Pavement – Greater than 4 Square Yards and less than 20 Square Yards (633.1402) | SY | 552 | $80.84 | $80.00 | $134.00 |
| 76 | Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403) | SY | 586 | $60.45 | $57.75 | $103.50 |
| 77 | Removal and Repair of Loose, Broken, or Spalled PCC Pavement (633.15) | SY | 91 | $43.13 | $97.00 | $141.15 |
| 78 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 17 | $3,500.00 | $3,000.00 | $2,515.00 |
| 79 | Office Technology and Supplies (637.34) | DOL | 2,000 | $1.00 | $1.00 | $1.00 |
| 80 | Construction Testing supplies – Consumables (637.36) | DOL | 111 | $1.00 | $1.00 | $1.00 |
| 81 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 24 | $53.50 | $53.50 | $53.50 |
| 82 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 344 | $50.50 | $50.50 | $50.50 |
| 83 | Type A Sign Posts (645.81) | EACH | 54 | $225.00 | $225.00 | $225.00 |
| 84 | (645.81090003) | 26 | $80.00 | $80.00 | $80.00 | |
| 85 | Reference Marker Panel (646.21) | EACH | 30 | $60.00 | $60.00 | $60.00 |
| 86 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 82 | $35.00 | $35.00 | $35.00 |
| 87 | Steel Post, 2.0 lb/ft (646.32) | EACH | 105 | $100.00 | $100.00 | $100.00 |
| 88 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 3 | $150.00 | $150.00 | $150.00 |
| 89 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 20 | $35.00 | $35.00 | $35.00 |
| 90 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 33 | $55.00 | $55.00 | $55.00 |
| 91 | (647.83001002) | 102 | $25.00 | $25.00 | $25.00 | |
| 92 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 39,270 | $0.47 | $0.75 | $0.31 |
| 93 | Adjust Existing Valve Box Elevation (663.33) | EACH | 23 | $349.47 | $325.00 | $230.00 |
| 94 | (680.05010007) | 11 | $21,250 | $21,250 | $21,250 | |
| 95 | (680.05020007) | 12 | $3,180.00 | $3,180.00 | $3,180.00 | |
| 96 | (680.05040004) | 2 | $5,340.00 | $5,340.00 | $5,340.00 | |
| 97 | (680.51000010) | 2 | $434.28 | $675.00 | $350.00 | |
| 98 | (680.80320014) | 12 | $4,660.00 | $4,660.00 | $4,660.00 | |
| 99 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 215,680 | $0.32 | $0.40 | $0.40 |
| 100 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 207,070 | $0.32 | $0.40 | $0.40 |
| 101 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 38,190 | $2.95 | $2.59 | $2.59 |
| 102 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 6,130 | $2.95 | $2.29 | $2.29 |
| 103 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 290 | $75.00 | $75.00 | $75.00 |
| 104 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 254 | $300.00 | $223.00 | $223.00 |
| 105 | (691.04000020) | 110,000 | $1.00 | $1.00 | $1.00 | |
| 106 | Field Change Payment (FCP) (697.03) | DOL | 588,000 | $1.00 | $1.00 | $1.00 |
| 107 | Asphalt Price Adjustment (698.04) | DOL | 160,384 | $1.00 | $1.00 | $1.00 |
| 108 | Fuel Price Adjustment (698.05) | DOL | 31,639 | $1.00 | $1.00 | $1.00 |
| 109 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 110 | Mobilization (699.040001) | LS | 1 | $450,000 | $520,000 | $466,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 27, 2025. Compiled by Mirage Metrics.