NYSDOT contract D265710 bid tabulation
Pavement Setaside & Green Island Bridge Reconfiguration. Let by New York State DOT on February 26, 2026, Albany, Greene, Rensselaer, Region 01. 2 bids received; low bid $17,930,554 by Callanan Industries Inc.
- Owner
- New York State DOT
- Letting
- 26 FEB 2026
- Pay items
- 199
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Callanan Industries Inc | $17,930,554 | Low |
| 2 | Rifenburg Construction Inc | $18,463,115 | +3.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Callanan Industries Inc | 2. Rifenburg Construction Inc |
|---|---|---|---|---|---|
| 1 | (201.07010004) | 6 | $1,800.00 | $1,200.00 | |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 844 | $105.00 | $85.25 |
| 3 | Embankment In Place (203.03) | CY | 120 | $300.00 | $92.00 |
| 4 | Select Granular Fill (203.07) | CY | 30 | $275.00 | $50.00 |
| 5 | (203.24010017) | 194 | $200.00 | $146.00 | |
| 6 | Controlled Low Strength Material (CLSM) (204.01) | CY | 3 | $1,100.00 | $1,300.00 |
| 7 | Trench and Culvert Excavation (206.0201) | CY | 80 | $140.00 | $135.00 |
| 8 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 846 | $61.00 | $67.50 |
| 9 | Test Pit Excavation (206.05) | EACH | 16 | $1,200.00 | $2,050.00 |
| 10 | Mulch – Temporary (209.100101) | SY | 567 | $4.00 | $5.00 |
| 11 | Seed and Mulch – Temporary (209.1003) | SY | 1,134 | $4.05 | $3.00 |
| 12 | Silt Fence - Temporary (209.13) | LF | 100 | $42.00 | $5.50 |
| 13 | Drainage Structure Inlet Protection, Prefabricated – Temporary (209.1703) | LF | 165 | $24.00 | $30.00 |
| 14 | Sediment Filter Log, 12″ (209.2301) | LF | 953 | $16.50 | $6.25 |
| 15 | Removal and Disposal of Caulking ACM (BV14) (210.3414) | LS | 1 | $12,320 | $12,320 |
| 16 | (304.00010018) | 548 | $7.62 | $6.00 | |
| 17 | (304.01940004) | 3 | $1,500.00 | $1,150.00 | |
| 18 | Subbase Course, Type 2 (304.12) | CY | 506 | $150.00 | $171.00 |
| 19 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 2,665 | $95.00 | $95.00 |
| 20 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 2,665 | $95.00 | $95.00 |
| 21 | (404.0189) | TON | 89 | $161.00 | $115.00 |
| 22 | (404.0589) | TON | 8 | $650.00 | $543.00 |
| 23 | (404.0982) | TON | 935 | $113.00 | $138.00 |
| 24 | (404.1989) | TON | 121 | $155.00 | $145.00 |
| 25 | (404.3789) | TON | 97 | $170.00 | $158.00 |
| 26 | (406.0962) | TON | 29,779 | $103.00 | $103.00 |
| 27 | (406.0963) | TON | 15,768 | $102.00 | $113.50 |
| 28 | (406.1262) | TON | 4,070 | $95.00 | $97.00 |
| 29 | (406.1263) | TON | 3,624 | $99.00 | $105.00 |
| 30 | Straight Tack Coat (407.0103) | GAL | 39,779 | $3.25 | $3.00 |
| 31 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 300,832 | $0.44 | $0.35 |
| 32 | Production Cold-Mill Surface Planing of Bituminous Concrete (490.15) | SY | 402,929 | $2.00 | $2.10 |
| 33 | Production Cold Milling of Portland Cement Concrete (490.20) | SY | 25,616 | $4.00 | $3.25 |
| 34 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 19,792 | $11.00 | $4.75 |
| 35 | Production Grinding – New PCC Pavement (505.0201) | SY | 9,858 | $11.18 | $10.00 |
| 36 | Shields and Shoring (552.17) | SF | 442 | $1.00 | $0.10 |
| 37 | Sidewalks and Safety Walks (557.30) | SY | 606 | $155.00 | $625.00 |
| 38 | Performance Concrete Quality Adjustment – Sidewalks and Safety Walks (557.9902) | QUALITY UNIT | 1 | $4.50 | $4.50 |
| 39 | (576.03210011) | 4 | $1,500.00 | $5,500.00 | |
| 40 | Removal of Structural Concrete (580.01) | CY | 54 | $1,100.00 | $2,025.00 |
| 41 | Removal and Replacement of Structural Concrete (582.0051) | CY | 3 | $10,000 | $17,500 |
| 42 | (584.40000005) | 88,715 | $31.00 | $25.00 | |
| 43 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 156 | $115.00 | $92.00 |
| 44 | (601.04030011) | 131 | $19.00 | $19.00 | |
| 45 | Concrete Collars (603.77) | EACH | 2 | $2,000.00 | $2,500.00 |
| 46 | (603.9812) | LF | 23 | $325.48 | $387.00 |
| 47 | (604.070101) | EACH | 77 | $2,000.00 | $1,500.00 |
| 48 | (604.070102) | EACH | 17 | $2,000.00 | $3,175.00 |
| 49 | (604.13000011) | 3 | $2,500.00 | $700.00 | |
| 50 | (604.301772) | LF | 10 | $1,000.00 | $700.00 |
| 51 | (604.4048) | LF | 10 | $1,000.00 | $738.00 |
| 52 | Box Beam Guide Railing (606.10) | LF | 1,268 | $54.00 | $54.00 |
| 53 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 11 | $2,175.00 | $2,175.00 |
| 54 | Weak-Post, Corrugated Beam Guide Rail (606.18) | LF | 185 | $22.75 | $22.75 |
| 55 | Anchorage Units for Corrugated Beam Guide Railing Buried In Back Slope (606.2201) | EACH | 1 | $3,000.00 | $3,000.00 |
| 56 | Retensioning Existing Cable Guide railing or Median Barrier (606.48) | EACH | 1 | $150.00 | $150.00 |
| 57 | Removing and Disposing Cable Guide Railing (606.70) | LF | 520 | $2.25 | $2.25 |
| 58 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 668 | $3.00 | $3.00 |
| 59 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 311 | $5.00 | $5.00 |
| 60 | Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79) | EACH | 6 | $500.00 | $500.00 |
| 61 | Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910) | EACH | 3 | $500.00 | $500.00 |
| 62 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 2 | $140.00 | $140.00 |
| 63 | (607.06400016) | 435 | $158.00 | $81.00 | |
| 64 | (607.41010010) | 193 | $23.50 | $8.00 | |
| 65 | Concrete Sidewalks and Driveways (608.0101) | CY | 125 | $1,250.00 | $2,500.00 |
| 66 | (608.01020005) | 13 | $2,150.00 | $2,553.00 | |
| 67 | (608.01060415) | 793 | $57.50 | $60.00 | |
| 68 | (608.01070415) | 5,881 | $57.50 | $92.00 | |
| 69 | (608.21000003) | 35 | $252.00 | $405.00 | |
| 70 | (608.94010007) | 665 | $41.00 | $41.00 | |
| 71 | Stone Curb – Near Vertical Face (NVF) (609.0212) | LF | 1,375 | $95.00 | $113.00 |
| 72 | Stone Curb – Bridge (Type F1) (609.0302) | LF | 471 | $70.00 | $80.00 |
| 73 | Cast-in-Place Concrete Curb (As Detailed) (609.04) | LF | 150 | $190.00 | $164.00 |
| 74 | Resetting Existing Curb (609.15) | LF | 12 | $190.00 | $179.00 |
| 75 | Turf Establishment – Performance (610.1605) | SY | 567 | $25.00 | $47.00 |
| 76 | Watering Vegetation (610.19) | 1,000 GALLONS | 1,171 | $1.00 | $1.00 |
| 77 | (611.0351) | EACH | 13 | $1,290.00 | $600.00 |
| 78 | (611.19030024) | 13 | $710.00 | $20.00 | |
| 79 | (614.060204) | EACH | 13 | $1,000.00 | $817.00 |
| 80 | (618.70000124) | 6 | $400.00 | $275.00 | |
| 81 | (618.71000024) | 5 | $200.00 | $103.00 | |
| 82 | (618.73136124) | 6 | $2,500.00 | $2,000.00 | |
| 83 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $1,565,000 | $1,600,000 |
| 84 | Type III Construction Barricades (619.04) | EACH | 191 | $50.00 | $145.00 |
| 85 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 2,185 | $6.50 | $6.50 |
| 86 | (619.0901) | LF | 600,512 | $0.27 | $0.27 |
| 87 | (619.100103) | LF | 5,325 | $5.00 | $5.00 |
| 88 | (619.111113) | EACH | 6 | $6,000.00 | $4,230.00 |
| 89 | (619.111213) | WEEK | 224 | $550.00 | $202.00 |
| 90 | Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613) | MONTH | 37 | $75.00 | $75.00 |
| 91 | Interim Tubular Markers (619.20) | EACH | 357 | $25.00 | $30.00 |
| 92 | (619.2401) | LS | 1 | $60,000 | $213,272 |
| 93 | (619.2402) | LS | 1 | $50,000 | $75,000 |
| 94 | (619.2403) | LS | 1 | $25,000 | $50,000 |
| 95 | Pavement Patching (Force Acount) (619.2601) | DOL | 71,000 | $1.00 | $1.00 |
| 96 | Cleaning Closed Drainage Systems (621.03) | LF | 184 | $25.00 | $25.00 |
| 97 | Cleaning Drainage Structures (621.04) | EACH | 94 | $350.00 | $650.00 |
| 98 | (624.0109) | SF | 260 | $75.00 | $85.00 |
| 99 | Survey Operations (625.01) | LS | 1 | $20,000 | $107,500 |
| 100 | (627.50140008) | 1,731 | $4.78 | $2.50 | |
| 101 | Cleaning Existing Pavement and/or Shoulder (633.11) | SY | 653 | $2.00 | $3.00 |
| 102 | Removal and Repair of Deteriorated Asphalt Pavement - Less than or equal to 4 Square Yards (633.1401) | SY | 791 | $102.00 | $110.00 |
| 103 | Removal and Repair of Deteriorated Asphalt Pavement – Greater than 4 Square Yards and less than 20 Square Yards (633.1402) | SY | 781 | $82.00 | $100.00 |
| 104 | Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403) | SY | 771 | $62.00 | $93.00 |
| 105 | Removal and Repair of Loose, Broken, or Spalled PCC Pavement (633.15) | SY | 82 | $600.00 | $120.00 |
| 106 | (634.92000004) | 6 | $50.00 | $57.00 | |
| 107 | Cleaning and Preparation of Pavement Surfaces-Lines (635.0103) | LF | 10,302 | $1.79 | $1.80 |
| 108 | Cleaning and Preparation of Pavement Surfaces-Letters (635.0203) | EACH | 12 | $50.00 | $50.00 |
| 109 | Cleaning and Preparation of Pavement Surfaces-Symbols (635.0303) | EACH | 6 | $100.00 | $100.00 |
| 110 | Field Laboratory (637.01) | EACH | 1 | $7,000.00 | $2,500.00 |
| 111 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $500.00 | $2,500.00 |
| 112 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 21 | $3,500.00 | $3,000.00 |
| 113 | Office Technology and Supplies (637.34) | DOL | 3,000 | $1.00 | $1.00 |
| 114 | Construction Testing supplies – Consumables (637.36) | DOL | 210 | $1.00 | $1.00 |
| 115 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 984 | $43.25 | $43.25 |
| 116 | Overhead Sign Panels (645.61) | SF | 30 | $76.00 | $67.00 |
| 117 | Type A Sign Posts (645.81) | EACH | 133 | $225.00 | $225.00 |
| 118 | Pole-Mounted Sign Support System (Band Mounting) (645.85) | EACH | 12 | $375.00 | $330.00 |
| 119 | Reference Marker Panel (646.21) | EACH | 57 | $41.25 | $41.25 |
| 120 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 30 | $26.00 | $26.00 |
| 121 | Reference Marker, Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels Relocation (646.24) | EACH | 6 | $70.25 | $70.25 |
| 122 | Steel Post, 2.0 lb/ft (646.32) | EACH | 74 | $109.50 | $109.50 |
| 123 | Remove and Dispose Overhead Sign Panel, Sign Panel Assembly (647.25) | EACH | 2 | $950.00 | $178.00 |
| 124 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 1 | $210.00 | $210.00 |
| 125 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 110 | $60.00 | $60.00 |
| 126 | (647.83001002) | 44 | $10.00 | $10.00 | |
| 127 | Milled-In Audible Roadway Delineators (MIARDs) (649.01) | LF | 8,579 | $0.75 | $1.00 |
| 128 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 31,778 | $0.60 | $1.00 |
| 129 | (655.05170010) | 4 | $1,760.00 | $2,500.00 | |
| 130 | (655.07020010) | 1 | $1,760.00 | $3,200.00 | |
| 131 | Cast Frame F2, UnMountable Curb Box CU2 & Reticuline Grate G2 (655.0705) | EACH | 1 | $1,530.00 | $2,900.00 |
| 132 | Manhole Frame & Cover (655.1202) | EACH | 2 | $635.00 | $1,800.00 |
| 133 | Miscellaneous Metals (656.01) | LB | 1,619 | $15.92 | $14.00 |
| 134 | (660.75000010) | 8 | $625.00 | $950.00 | |
| 135 | (662.60030008) | 1 | $1,800.00 | $1,900.00 | |
| 136 | Adjust Existing Valve Box Elevation (663.33) | EACH | 16 | $400.00 | $208.00 |
| 137 | (663.53000004) | 6 | $900.00 | $900.00 | |
| 138 | (665.20000011) | 45 | $1,000.00 | $1,500.00 | |
| 139 | Ground Wire No. 6 AWG. (670.7501) | LF | 996 | $3.65 | $3.65 |
| 140 | (680.05010007) | 12 | $25,500 | $25,500 | |
| 141 | (680.05020007) | 9 | $5,575.00 | $5,575.00 | |
| 142 | Pole Excavation and Concrete Foundation (680.5001) | CY | 11 | $2,110.00 | $2,110.00 |
| 143 | Concrete Base for Controller Cabinet (680.5002) | EACH | 1 | $1,920.00 | $1,920.00 |
| 144 | (680.51000010) | 2 | $960.00 | $960.00 | |
| 145 | (680.510501) | EACH | 3 | $1,400.00 | $1,400.00 |
| 146 | (680.51100010) | 22 | $285.00 | $285.00 | |
| 147 | (680.51200208) | 3 | $2,100.00 | $202.78 | |
| 148 | (680.520103) | LF | 40 | $82.00 | $82.00 |
| 149 | (680.520606) | LF | 716 | $18.50 | $18.50 |
| 150 | (680.520608) | LF | 97 | $19.50 | $19.50 |
| 151 | (680.520610) | LF | 112 | $23.00 | $23.00 |
| 152 | (680.53010010) | 1,293 | $6.85 | $6.85 | |
| 153 | (680.670802) | EACH | 4 | $1,625.00 | $1,625.00 |
| 154 | (680.6712) | EACH | 1 | $1,840.00 | $1,840.00 |
| 155 | (680.6814) | EACH | 3 | $1,795.00 | $1,795.00 |
| 156 | (680.6816) | EACH | 2 | $1,840.00 | $1,840.00 |
| 157 | Dual Span Wire Assembly with Upper Tether Wire (680.7002) | EACH | 2 | $3,075.00 | $3,075.00 |
| 158 | (680.730314) | LF | 220 | $3.20 | $3.20 |
| 159 | (680.730514) | LF | 7,572 | $4.10 | $4.10 |
| 160 | (680.731014) | LF | 1,102 | $6.20 | $6.20 |
| 161 | (680.731914) | LF | 95 | $12.00 | $12.00 |
| 162 | (680.77000505) | 1 | $5,275.00 | $5,275.00 | |
| 163 | (680.79000205) | 3 | $1,125.00 | $1,125.00 | |
| 164 | (680.79000305) | 1 | $7,205.00 | $7,205.00 | |
| 165 | (680.79000405) | 1 | $1,800.00 | $1,800.00 | |
| 166 | (680.79000505) | 1 | $3,300.00 | $3,300.00 | |
| 167 | (680.80324515) | 8 | $3,630.00 | $3,630.00 | |
| 168 | (680.80324708) | 1 | $1,305.00 | $1,305.00 | |
| 169 | Traffic Signal Section - Aluminum Type I, 12-inch (680.810107) | EACH | 40 | $205.00 | $205.00 |
| 170 | Install Ball/Arrow LED Traffic Signal Module (680.810308) | EACH | 40 | $56.00 | $56.00 |
| 171 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 11 | $695.00 | $695.00 |
| 172 | Pedestrian Signal Section - Aluminum Type I, 12 inch (680.813103) | EACH | 20 | $277.00 | $277.00 |
| 173 | Install Pedestrian Signal Module (680.813104) | EACH | 20 | $56.00 | $56.00 |
| 174 | Pedestrian Signal Bracket Mount Assembly (680.8141) | EACH | 3 | $585.00 | $585.00 |
| 175 | Pedestrian Signal Post Top Mount Assembly (680.8142) | EACH | 5 | $570.00 | $570.00 |
| 176 | (680.8151) | EACH | 17 | $1,365.00 | $1,365.00 |
| 177 | (680.8152) | EACH | 2 | $2,460.00 | $2,460.00 |
| 178 | (680.8209) | EACH | 9 | $705.00 | $705.00 |
| 179 | (680.8210) | EACH | 3 | $1,015.00 | $1,015.00 |
| 180 | Flashing Beacon Sign Assembly (680.8220) | EACH | 3 | $6,735.00 | $6,735.00 |
| 181 | Breakaway Transformer Base (680.8223) | EACH | 7 | $985.00 | $985.00 |
| 182 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 2 | $500.00 | $500.00 |
| 183 | (680.950106) | LF | 360 | $3.95 | $3.95 |
| 184 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $7.50 | $7.50 |
| 185 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 190,674 | $0.37 | $0.37 |
| 186 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 179,705 | $0.37 | $0.37 |
| 187 | (685.16010014) | 11,100 | $1.39 | $1.39 | |
| 188 | (685.17010014) | 9,500 | $1.39 | $1.39 | |
| 189 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 67,798 | $2.69 | $2.69 |
| 190 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 50,600 | $2.00 | $2.00 |
| 191 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 80 | $70.00 | $70.00 |
| 192 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 204 | $200.00 | $200.00 |
| 193 | (686.05000011) | 4 | $3,900.00 | $3,900.00 | |
| 194 | (691.04000020) | 75,600 | $1.00 | $1.00 | |
| 195 | Field Change Payment (FCP) (697.03) | DOL | 879,000 | $1.00 | $1.00 |
| 196 | Asphalt Price Adjustment (698.04) | DOL | 92,450 | $1.00 | $1.00 |
| 197 | Fuel Price Adjustment (698.05) | DOL | 17,147 | $1.00 | $1.00 |
| 198 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 199 | Mobilization (699.040001) | LS | 1 | $675,000 | $710,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of February 26, 2026. Compiled by Mirage Metrics.