NYSDOT contract D265720 bid tabulation
Oneonta Rt. 23 & 28 safety & mobility improvements. Let by New York State DOT on March 12, 2026, Otsego, Region 09. 1 bid received; low bid $7,807,046 by Bothar Construction LLC.
- Owner
- New York State DOT
- Letting
- 12 MAR 2026
- Pay items
- 209
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Bothar Construction LLC | $7,807,046 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bothar Construction LLC |
|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $20,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 4,048 | $58.70 |
| 3 | Embankment In Place (203.03) | CY | 502 | $60.35 |
| 4 | Select Granular Fill (203.07) | CY | 282 | $113.60 |
| 5 | (203.24010017) | 50 | $55.30 | |
| 6 | Trench and Culvert Excavation (206.0201) | CY | 710 | $77.35 |
| 7 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 1,185 | $92.00 |
| 8 | Test Pit Excavation (206.05) | EACH | 15 | $2,023.00 |
| 9 | Geotextile Drainage (207.22) | SY | 59 | $16.60 |
| 10 | (208.01000809) | 157 | $137.90 | |
| 11 | Seed and Mulch – Temporary (209.1003) | SY | 2,500 | $4.60 |
| 12 | (209.11010024) | 10 | $446.70 | |
| 13 | Check Dam, (Ditch Bottom Width >3′ to 6′), Stone – Permanent (209.110602) | EACH | 4 | $900.50 |
| 14 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 933 | $3.05 |
| 15 | Stabilized Construction Access (209.22) | SY | 240 | $1.25 |
| 16 | Sediment Filter Log, 12″ (209.2301) | LF | 3,805 | $8.10 |
| 17 | (304.00010018) | 33,752 | $4.10 | |
| 18 | Subbase Course, Optional Type (304.15) | CY | 1,744 | $99.15 |
| 19 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 246 | $100.00 |
| 20 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 64 | $100.00 |
| 21 | (404.1989) | TON | 1,023 | $167.40 |
| 22 | (404.2589) | TON | 1,387 | $155.40 |
| 23 | (406.0962) | TON | 2,491 | $164.50 |
| 24 | (407.01040009) | 1,655 | $6.65 | |
| 25 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 14,654 | $1.35 |
| 26 | (490.17011018) | 17,587 | $4.70 | |
| 27 | (502.0142) | 5 | $3,160.00 | |
| 28 | Sealing Transverse Joints- Highway Joint Sealant (502.9210) | LF | 2,535 | $7.20 |
| 29 | Sealing Longitudinal Joints-Highway Joint Sealant (502.9310) | LF | 1,950 | $7.10 |
| 30 | Performance Concrete Quality Adjustment - PCC Pavement (502.99) | QUALITY UNIT | 1 | $15.00 |
| 31 | Production Grinding – New PCC Pavement with Slurry Removal (505.0202) | SY | 2,666 | $27.00 |
| 32 | (510.12000018) | 667 | $2,564.00 | |
| 33 | (510.20000018) | 2,580 | $96.35 | |
| 34 | Shields and Shoring (552.17) | SF | 565 | $20.90 |
| 35 | (553.030001) | EACH | 1 | $6,570.00 |
| 36 | (554.3002) | SF | 460 | $93.40 |
| 37 | Fill Type Retaining Wall (0 – 6 ft.) (554.40) | SF | 60 | $161.20 |
| 38 | (603.171316) | EACH | 5 | $1,074.00 |
| 39 | (603.9818) | LF | 669 | $49.50 |
| 40 | Leaching Basin (604.01) | LF | 8 | $2,678.00 |
| 41 | (604.06000109) | 10 | $10,242 | |
| 42 | (604.070101) | EACH | 6 | $1,138.00 |
| 43 | (604.301772) | LF | 18 | $819.00 |
| 44 | (604.4048) | LF | 4 | $1,179.00 |
| 45 | Underdrain Filter, Type II (605.1001) | CY | 53 | $127.90 |
| 46 | (605.1601) | LF | 540 | $3.05 |
| 47 | (605.16010008) | 140 | $3.05 | |
| 48 | Box Beam Guide Railing (606.10) | LF | 36 | $100.00 |
| 49 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 35 | $96.00 |
| 50 | Box Beam Median Barrier (606.11) | LF | 160 | $93.00 |
| 51 | Box Beam End Piece (606.120101) | EACH | 2 | $1,015.00 |
| 52 | Box Beam Median Barrier End Assembly, Type C (606.1403) | EACH | 2 | $9,572.00 |
| 53 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 230 | $6.85 |
| 54 | Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910) | EACH | 2 | $853.50 |
| 55 | (607.30010010) | 93 | $90.40 | |
| 56 | (607.41010010) | 500 | $4.00 | |
| 57 | Concrete Sidewalks and Driveways (608.0101) | CY | 185 | $1,486.00 |
| 58 | (608.01030009) | 12 | $2,396.00 | |
| 59 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 273 | $229.70 |
| 60 | (608.21000003) | 28 | $465.75 | |
| 61 | Stone Curb – Mountable (MT) (609.0214) | LF | 784 | $85.00 |
| 62 | (609.0403) | LF | 2,841 | $58.20 |
| 63 | Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101) | CY | 11 | $129.95 |
| 64 | Weed Removal (610.13) | SY | 3,930 | $2.85 |
| 65 | Topsoil – Reuse On-Site Materials (610.1401) | CY | 213 | $55.40 |
| 66 | Topsoil - Roadside (610.1402) | CY | 213 | $105.80 |
| 67 | Turf Establishment -Lawns (610.1602) | SY | 3,454 | $1.95 |
| 68 | (610.16090524) | 57 | $11.30 | |
| 69 | Sodding (610.18) | SY | 403 | $14.75 |
| 70 | Watering Vegetation (610.19) | 1,000 GALLONS | 193 | $11.30 |
| 71 | (611.0131) | EACH | 3 | $565.00 |
| 72 | (611.0161) | EACH | 9 | $655.40 |
| 73 | (611.0282) | EACH | 8 | $508.50 |
| 74 | (611.0452) | EACH | 9 | $113.00 |
| 75 | (611.0542) | EACH | 25 | $101.70 |
| 76 | (611.0562) | EACH | 1 | $169.50 |
| 77 | (611.19010024) | 12 | $22.60 | |
| 78 | (611.19020024) | 8 | $22.60 | |
| 79 | (611.19040024) | 9 | $11.30 | |
| 80 | (611.19050024) | 26 | $11.30 | |
| 81 | (614.060303) | EACH | 1 | $2,500.00 |
| 82 | (615.02050124) | 1 | $600.00 | |
| 83 | (615.02050224) | 2 | $600.00 | |
| 84 | (615.08010005) | 6 | $2,700.00 | |
| 85 | (617.10000024) | 2 | $122.10 | |
| 86 | (617.11000024) | LS | 1 | $3,063.00 |
| 87 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $556,000 |
| 88 | Type III Construction Barricades (619.04) | EACH | 20 | $124.00 |
| 89 | Temporary Business Signs (619.0701) | SF | 94 | $48.60 |
| 90 | (619.080101) | LF | 18,528 | $1.15 |
| 91 | (619.080201) | EACH | 32 | $86.25 |
| 92 | (619.100102) | LF | 21,697 | $0.95 |
| 93 | (619.100104) | LF | 3,982 | $6.35 |
| 94 | (619.100202) | EACH | 11 | $287.50 |
| 95 | (619.111112) | EACH | 4 | $9,700.00 |
| 96 | Maintain Traffic Signal Equipment (Requirement B) Intersection (619.1612) | MONTH | 48 | $367.25 |
| 97 | (619.161401) | EACH | 1 | $8,136.00 |
| 98 | (619.161402) | EACH | 1 | $8,136.00 |
| 99 | (619.161403) | EACH | 1 | $8,136.00 |
| 100 | (619.161404) | EACH | 1 | $8,136.00 |
| 101 | Temporary Rumble Strips (619.22) | LF | 660 | $9.00 |
| 102 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $115,000 |
| 103 | Pavement Patching (Force Acount) (619.2601) | DOL | 5,000 | $1.00 |
| 104 | Mailboxes (619.27) | EACH | 4 | $255.00 |
| 105 | Stone Filling (Light) (620.03) | CY | 19 | $160.60 |
| 106 | (621.51000015) | 539 | $8.00 | |
| 107 | Crushed Stone (In-Place Measure) (623.12) | CY | 10 | $90.25 |
| 108 | Survey Operations (625.01) | LS | 1 | $75,000 |
| 109 | Concrete Right of Way Markers Type L (Low) (625.04) | EACH | 28 | $1,603.00 |
| 110 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 12 | $447.40 |
| 111 | Permanent Survey Markers (625.06) | EACH | 4 | $3,831.00 |
| 112 | (627.50140008) | 2,118 | $7.80 | |
| 113 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $4,300.00 |
| 114 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 18 | $2,500.00 |
| 115 | Office Technology and Supplies (637.34) | DOL | 1,000 | $1.00 |
| 116 | (637.41000115) | 18 | $172.60 | |
| 117 | (637.41000215) | 18 | $172.60 | |
| 118 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 157 | $45.20 |
| 119 | Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103) | SF | 65 | $47.50 |
| 120 | Type A Sign Posts (645.81) | EACH | 26 | $231.65 |
| 121 | (645.81090003) | 4 | $73.45 | |
| 122 | (645.830202) | EACH | 4 | $4,746.00 |
| 123 | Reference Marker Panel (646.21) | EACH | 3 | $31.65 |
| 124 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 5 | $14.70 |
| 125 | Steel Post, 2.0 lb/ft (646.32) | EACH | 8 | $73.45 |
| 126 | Remove and Dispose Sign Panel, Sign Panel Assembly Size II (30-100 Square Feet) (647.52) | EACH | 2 | $56.50 |
| 127 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 64 | $22.60 |
| 128 | Remove and Dispose Type B Ground Mounted Sign Support and Foundation (647.65) | EACH | 4 | $226.00 |
| 129 | (647.83001002) | 8 | $20.35 | |
| 130 | Cast Frame F2, Mountable Curb Box CM2 & Parallel Bar Grate 7 PCB (655.0802) | EACH | 3 | $3,066.00 |
| 131 | Welded Frame & Rectangular Grate 11 (655.1011) | EACH | 1 | $2,258.00 |
| 132 | Manhole Frame & Grate (655.1201) | EACH | 1 | $2,009.00 |
| 133 | (661.01000108) | LS | 1 | $37,742 |
| 134 | (662.60010004) | 3,000 | $1.00 | |
| 135 | (662.60510008) | 1 | $1,685.00 | |
| 136 | Adjust Existing Valve Box Elevation (663.33) | EACH | 1 | $507.60 |
| 137 | (680.05010007) | 3 | $34,985 | |
| 138 | (680.05020007) | 3 | $5,819.50 | |
| 139 | (680.05060004) | 7 | $4,847.70 | |
| 140 | (680.05070004) | 3 | $1,175.20 | |
| 141 | (680.12231214) | 8 | $8,152.95 | |
| 142 | (680.12231614) | 3 | $8,520.20 | |
| 143 | (680.12241614) | 1 | $11,215 | |
| 144 | Pole Excavation and Concrete Foundation (680.5001) | CY | 34 | $3,164.00 |
| 145 | Concrete Work Pad (5 feet x 5 feet x 4 inches) (680.5003) | EACH | 4 | $1,514.20 |
| 146 | (680.50500005) | 15 | $576.30 | |
| 147 | (680.51010009) | 5 | $627.15 | |
| 148 | (680.510501) | EACH | 13 | $2,248.70 |
| 149 | (680.51100010) | 7 | $429.40 | |
| 150 | (680.51505011) | 2 | $2,248.70 | |
| 151 | (680.520106) | LF | 270 | $30.55 |
| 152 | (680.520108) | LF | 1,080 | $49.75 |
| 153 | (680.520203) | LF | 60 | $13.60 |
| 154 | Inductance Loop Installation (680.54) | LF | 450 | $21.50 |
| 155 | (680.600932) | EACH | 1 | $14,978 |
| 156 | (680.600934) | EACH | 1 | $15,142 |
| 157 | (680.600935) | EACH | 1 | $15,357 |
| 158 | (680.600936) | EACH | 1 | $15,933 |
| 159 | (680.632248) | EACH | 1 | $35,143 |
| 160 | (680.632351) | EACH | 1 | $34,352 |
| 161 | (680.6816) | EACH | 1 | $2,339.10 |
| 162 | Dual Span Wire Assembly with Upper Tether Wire (680.7002) | EACH | 4 | $4,192.30 |
| 163 | Shielded Lead-in Cable (680.71) | LF | 350 | $3.25 |
| 164 | Inductance Loop Wire (680.72) | LF | 1,100 | $1.50 |
| 165 | (680.730214) | LF | 260 | $3.25 |
| 166 | (680.730514) | LF | 5,800 | $4.50 |
| 167 | (680.730714) | LF | 525 | $5.50 |
| 168 | (680.731514) | LF | 200 | $10.75 |
| 169 | (680.732014) | LF | 230 | $13.75 |
| 170 | (680.77000405) | 1 | $11,018 | |
| 171 | (680.78010005) | 1 | $452.00 | |
| 172 | (680.79000105) | 1 | $6,768.70 | |
| 173 | (680.79000205) | 1 | $6,768.70 | |
| 174 | (680.79000305) | 1 | $6,768.70 | |
| 175 | (680.79000405) | 1 | $6,768.70 | |
| 176 | (680.80320009) | 3 | $1,700.65 | |
| 177 | (680.80320014) | 3 | $5,548.30 | |
| 178 | (680.80324515) | 4 | $3,921.10 | |
| 179 | (680.80324603) | 2 | $1,887.10 | |
| 180 | Traffic Signal Module - 12-inch, Bi-Modal Yellow/Green Arrows, LED (680.810108) | EACH | 2 | $171.00 |
| 181 | Install Ball/Arrow LED Traffic Signal Module (680.810308) | EACH | 97 | $46.50 |
| 182 | Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601) | EACH | 99 | $238.50 |
| 183 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 30 | $1,013.65 |
| 184 | Pedestrian Signal Section - Polycarbonate, Type I, for 16-inch by 18-inch LED module (680.813109) | EACH | 5 | $160.00 |
| 185 | Pedestrian Signal Bracket Mount Assembly (680.8141) | EACH | 5 | $645.00 |
| 186 | Pedestrian Signal Module - 16-inch x 18-inch, Bi-Modal Hand/Man Symbols with Countdown Timer, LED (680.815002) | EACH | 5 | $216.00 |
| 187 | (680.8151) | EACH | 5 | $1,443.00 |
| 188 | Backplates for Traffic Signal Heads (680.8199) | EACH | 42 | $358.25 |
| 189 | (680.8207) | EACH | 11 | $959.50 |
| 190 | Breakaway Transformer Base (680.8223) | EACH | 13 | $689.30 |
| 191 | (680.82250601) | 2 | $1,327.75 | |
| 192 | (680.82250801) | 20 | $497.20 | |
| 193 | (680.83010005) | 360 | $8.00 | |
| 194 | (680.8452) | EACH | 1 | $5,113.25 |
| 195 | (680.950106) | LF | 920 | $6.00 |
| 196 | (680.95110009) | 2 | $6,112.25 | |
| 197 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $15.50 |
| 198 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 11,868 | $1.15 |
| 199 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 7,044 | $1.15 |
| 200 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 12,944 | $3.90 |
| 201 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 3,126 | $3.45 |
| 202 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 48 | $86.25 |
| 203 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 42 | $258.75 |
| 204 | (691.04000020) | 35,000 | $1.00 | |
| 205 | Field Change Payment (FCP) (697.03) | DOL | 329,000 | $1.00 |
| 206 | Asphalt Price Adjustment (698.04) | DOL | 3,205.22 | $1.00 |
| 207 | Fuel Price Adjustment (698.05) | DOL | 939 | $1.00 |
| 208 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 |
| 209 | Mobilization (699.040001) | LS | 1 | $300,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 12, 2026. Compiled by Mirage Metrics.