NYSDOT contract D265604 bid tabulation
Crack Sealing Regionwide 2026. Let by New York State DOT on December 4, 2025, Livingston, Monroe, Wayne, Region 04. 3 bids received; low bid $877,878 by Bothar Construction LLC.
- Owner
- New York State DOT
- Letting
- 04 DEC 2025
- Pay items
- 12
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Bothar Construction LLC | $877,878 | Low |
| 2 | O H Striping Inc | $932,502 | +6.0% |
| 3 | Annseal Inc | $1,790,368 | +104% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bothar Construction LLC | 2. O H Striping Inc | 3. Annseal Inc |
|---|---|---|---|---|---|---|
| 1 | (412.76030001) | 316 | $1,153.00 | $1,674.00 | $2,125.00 | |
| 2 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $341,303 | $224,645 | $793,000 |
| 3 | Type III Construction Barricades (619.04) | EACH | 178 | $128.00 | $50.00 | $350.00 |
| 4 | (619.111111) | EACH | 9 | $1,820.00 | $1,800.00 | $10,000 |
| 5 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $51,675 | $68,490 | $51,150 |
| 6 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 8 | $3,200.00 | $3,000.00 | $4,000.00 |
| 7 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 | $1.00 |
| 8 | Field Change Payment (FCP) (697.03) | DOL | 23,000 | $1.00 | $1.00 | $1.00 |
| 9 | Asphalt Price Adjustment (698.04) | DOL | 1,718 | $1.00 | $1.00 | $1.00 |
| 10 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 11 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 12 | Mobilization (699.040001) | LS | 1 | $30,369 | $35,865 | $65,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of December 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.